Forwards Safety Insp Repts 50-220/91-23 & 50-410/91-23 on 911006-1109 & Notice of Violation.Overall Personnel Performance Generally Good
ML17056B575
Person / Time
Site: Nine Mile Point  
Issue date: 12/13/1991
From: Cowgill C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sylvia B
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17056B576 List:
References
NUDOCS 9112260016
Download: ML17056B575 (6)


See also: IR 05000220/1991023

Text

Docket Nos. 50-220; 50-410

OEC j.3 t991

Niagara Mohawk Power Corporation

ATTN: Mr. B. Ralph Sylvia

Executive Vice President - Nuclear

301 Plainfield Road

Syracuse,

New York 13212

Dear Mr. Sylvia:

Subject:

NRC Region I Combined Inspection Nos. 50-220/91-23 and 50-410/91-23

This refers

to the results of the routine resident

safety inspection

conducted

by Messrs.

W. Schmidt, R. Laura, and R. Temps from October 6 to November 9, 1991, at Nine MilePoint

Units

1 and 2, Scriba, New York. The inspection findings were discussed

with members of

your staff at the exit meeting conducted on November 15, 1991.

This inspection was directed toward areas important to public'health and safety. Areas examined

during the inspection are described in the enclosed NRC Region I inspection report.

Within

these areas,

the inspection consisted of observation of activities in progress,

interviews with

personnel,

and selective examinations of procedures

and representative

records.

Overall, personnel performance at both units was generally good. However, the NRC identified

instances

where personnel

did not adhere

to station procedures

and practices.

At Unit 1,

inspector review of an unresolved item from the previous inspection report identified that the

installation of temporary

gauges

on the core spray

system

was done without an adequate

procedure.

Specifically, the installation was not reviewed for system operability impact, as

required by site administrative procedures.

At Unit 2, an inspector observed

that personnel

failed to perform a proper whole body frisk, in accordance with station radiological procedures,

when exiting a radiologically controlled area.

Based on these findings, these instances in this

report appear to be in violation of NRC requirements,

as specified in the enclosed Notice of

Violation. Further, these cases when combined with other examples of procedural adherence

problems and inattention-to-detail identified in recent NRC reports is of concern to NRC. They

indicate that potentially there is an adverse trend in personnel performance that merits continued

close oversight by utility management.

Based on the results of this inspection, you are required 'to respond to this letter and should

follow the instructions specified in the enclosed Notice when preparing your response.

In your

response,

you should document the specific actions taken and any additional action you plan to

prevent recurrence

of these

types of issues.

Further,

please

include in your response

a

discussion of the actions you have taken or plan to take to address

the inattention-to-detail

concerns and configuration control issues discussed in this inspection report.

OFFICIALRECORD COPY

a: CIR91-23.NMP

sooi6 ~sooo2ao

PDR

pDOCK o~

PDR

G

pt

Niagara Mohawk Power Corporation

0EC ~3 l'3~~

The response

directed by this letter and the enclosed Notice is not subject to the clearance

procedures of the Office of Management and Budget as required by the Paperwork Reduction

Act of 1980, Pub. L, No. 96.511.

Your cooperation with us is appreciated.

Sincerely,

OPfCl "At. <IGN<D By

CU."

Curtis J. Cowgill, Chief

Projects Branch No.

1

Division of Reactor Projects

Enclosures:

1.

Appendix A, Notice of Violation

2.

NRC Region I Combined Inspection Nos. 50-220/91-23 and 50-410/91-23

cc w/encls:

J. Firlit, Vice President - Nuclear Generation

C. Terry, Vice President - Nuclear Engineering

J. Perry, Vice President - Quality Assurance

S. Wilczek, Jr., Vice President - Nuclear Support

K. Dahlberg, Unit 1 Plant Manager

M. McCormick, Unit 2 Plant Manager

D. Greene, Manager, Licensing

J. Warden, New York Consumer Protection Branch

G. Wilson, Senior Attorney

Director, Power Division, Department of Public Service, State of New York

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

K. Abraham, PAO (2) AllInspection Reports

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New York, SLO Designee

OFFICIALRECORD COPY

a: CIR91-23.NMP

Niagara Mohawk Power Corporation

OCC13

bcc w/encls:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encls)

C. Cowgill, DRP

R. Summers, DRP

D. Haverkamp, DRP

W. Schmidt, SRI - ¹ine Mile

B. Cook, SRI - FitzPatrick

R. Lobel, EDO

R. Capra, NRR

J. Menning, NRR

D. Brinkman, NRR

DRS SALP Coordinator

DRSS SALP Coordinator

bcc w/Letter, Appendix A, Report Cover Sheet and Executive Summary only:

W. Hehl, DRP

J. Wiggins, DRP

W. Hodges, DRS

W. Lanning, DRS

J. Durr, DRS

L. Bettenhausen,

DRS

M. Knapp, DRSS

R. Cooper, DRSS

J. Joyner, DRSS

D. Holody, DRA

ch

idt/mjd

12&/91

averkamp

128&1

RI:DRPQ~

CCowgill

12/I3/91

OFFICIALRECORD COPY

a: CIR91-23.NMP