Docket No. 50-410
~OV15 1990
Niagara
Mohawk Power Corporation
ATTN:
Mr. Lawrence Burkhardt, III
Executive Vice President
Nuclear Operations
301 Plainfield Road
Syracuse,
13212
Gentlemen:
Subject:
Examination Report
No. 50-410/90-16
(OL)
This refers to your letter dated August 20,
1990, in response
to our letter
dated
May 31,
1990.
Your letter certified that Niagara
Mohawk has completed all short-term correc-
tive actions for the Nine Mile Point Unit 2 Operator Requalification
program
and that all program deficiencies,
including those identified by the
NRC,
have
been
addressed.
We have reviewed your corrective actions
and the documentation
you provided to support your certification and have
found them satisfactory.
Further,
our requalification program evaluation
conducted
during the week of
April 30,
1990,
and documented
in our examination report,
50-410/90-16
(OL)
indicates that the program
has
met all criteria for a satisfactory classifi-
cation as set forth in Examiner Standard
Revision 5.
During a tele-
phone conservation
with Mr. S. Pullani of my staff on November 7, 1990,
Mr.
R. Seifried of your staff also confirmed that
a long term action regarding
a review of the examination
question
bank, which remained
unresolved at the end
of the April 30,
1990 program evaluation,
was completed prior to October 31,
1990,
in accordance
with your commitment
as documented
in Sections
7.2 and 7. 10
of the examination report.
Accordingly, the program is considered
returned to
a satisfactory
status.
Thank you for informing us of the corrective
and preventive actions
documented
in your letter.
These actions will be further examined during
a future inspec-
tion/examination of your operator requalification program.
Your cooperation with us is appreciated.
Sincerely,
A~Ptldlg P
>
Thomas
T. Martin
Regional Administrator
OFFICIAL RECORD
COPY
?Oi 1 "rr> 1 76
90%-1
i"-'PFl
AZ>OCf: 0500(>41>,">
P'DC
PULLANI/RL/10/11/90 - 0001.0. 0
10/11/90
'Y
I
Niagara
Mohawk Power Corp.
cc w/encl.:
R. Sylvia, Senior Vice President
W. Hansen,
Manager,
Corporate Quality Assurance
M. Colomb, Unit 2 Superintendent,
Operations
C.
Beckham,
Manager,
Nuclear Quality Assurance
Operations
R. Abbott, Unit 2 Station Superintendent
J. Perry,
Vice President,
Quality Assurance
K. Dahlberg, Unit
1 Station Superintendent
R. Randall, Unit
1 Superintendent,
Operations
J. Firl.it, Vice President,
Nuclear Generation
C. Terry, Vice President
Nuclear Engineering
and Licensing
J.
Warden,
New York Consumer
Protection
Branch
T. Conner, Jr.,
Esquire
G. Wilson, Senior Attorney
J.
Keib, Esquire
Director,
Power Division, Department of Public Service,
Sta
State of New York, Department of Law
Public Document
Room (PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
State of New York,
SLO Designee
bcc w/encl.:
Region I Docket
Room (with concurrences)
Management Assistant,
DRMA
D. Lange,
OLB
J. Caldwell,
R. Martin,
R. Capra,
T. Martin,
W. Kane,
L. Bettenhausen,
R. Conte,
S. Pullani,
R. Bellamy,
DRSS
J. Linville, DRP
D. Vito,
G. Meyer,
M. Miller, DRP
DRS Files (3)
te of New York
"DRS:RI
- DRS:RI
- NRR:OLB
"DRS:RI
R
- I
DR
'
.RI
Pullani/ajk
Conte 'ange
Bettenhausen
Hodges
Vfy
M @tin
11/13/90
11/
/90
11/
/90
11/
/90
11/J3/90
11/II,/90
11/Is /90
- SEE PREVIOUS
CONCURRENCE
PAGE
OFFICIAL RECORD
COPY
PULLANI/RL/10/11/90 - 0002.0.0
10/11/90
A
(
II
Niagara
Mohawk Power Corp.
cc w/encl.:
R. Sylvia, Senior Vice President
W. Hansen,
Manager,
Corporate Quality Assurance
M. Colomb, Unit 2 Superintendent,
Operations
C.
Beckham,
Manager,
Nuclear Quality Assurance
Operations
R. Abbott, Unit 2 Station Superintendent
J. Perry,
Vice President,
Quality Assurance
K. Dahlberg, Unit 1 Station Superintendent
R. Randall, Unit
1 Superintendent,
Operations
J. Firlit, Vice President,
Nuclear Generation
C. Terry, Vice President
Nuclear Engineering
and Licensing
J.
Warden,
New York Consumer Protection
Branch
T. Conner, Jr.,
Esquire
G. Wilson, Senior Attorney
J.
Keib, Esquire
Director,
Power Division, Department of Public Service,
State of New York
State of New York, Department of Law
Public Document
Room (PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
K. Abraham,
PAO (24)
SALP Report
and (2) All Inspection
Reports
State of New York,
SLO Designee
bcc w/encl.:
Region I Docket
Room (with
Management Assistant,
DRMA
D.
Lange,
OLB
J. Caldwell,
R. Martin,
R. Capra,
L. Bettenhausen,
R. Conte,
S. Pullani,
R. Bellamy,
DRSS
J. Linville, DRP
D. Vito,
G. Meyer,
M. Miller, DRP
DRS Files (3)
DRS: RI
DRS RI
pullanl/ajk
yConte
11/oG/90
1/o i'90
concurrences)
NRR:OLB
DRS:RI
an
e QM)Be
hausen
11/O7 00
11/ g/90
DRS:RI
Hodges
11/
/90
OFFICIAL RECORD
COPY
.
PULLANI/RL/10/11/90 - 0002.0.0
10/11/90