ML17056B137

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Completion of Corrective Actions Re Exam Rept 50-410/90-16(OL)
ML17056B137
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 11/15/1990
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Burkhardt L
NIAGARA MOHAWK POWER CORP.
References
NUDOCS 9011290176
Download: ML17056B137 (6)


See also: IR 05000410/1990016

Text

Docket No. 50-410

~OV15 1990

Niagara

Mohawk Power Corporation

ATTN:

Mr. Lawrence Burkhardt, III

Executive Vice President

Nuclear Operations

301 Plainfield Road

Syracuse,

New York

13212

Gentlemen:

Subject:

Examination Report

No. 50-410/90-16

(OL)

This refers to your letter dated August 20,

1990, in response

to our letter

dated

May 31,

1990.

Your letter certified that Niagara

Mohawk has completed all short-term correc-

tive actions for the Nine Mile Point Unit 2 Operator Requalification

program

and that all program deficiencies,

including those identified by the

NRC,

have

been

addressed.

We have reviewed your corrective actions

and the documentation

you provided to support your certification and have

found them satisfactory.

Further,

our requalification program evaluation

conducted

during the week of

April 30,

1990,

and documented

in our examination report,

50-410/90-16

(OL)

indicates that the program

has

met all criteria for a satisfactory classifi-

cation as set forth in Examiner Standard

ES-601,

Revision 5.

During a tele-

phone conservation

with Mr. S. Pullani of my staff on November 7, 1990,

Mr.

R. Seifried of your staff also confirmed that

a long term action regarding

a review of the examination

question

bank, which remained

unresolved at the end

of the April 30,

1990 program evaluation,

was completed prior to October 31,

1990,

in accordance

with your commitment

as documented

in Sections

7.2 and 7. 10

of the examination report.

Accordingly, the program is considered

returned to

a satisfactory

status.

Thank you for informing us of the corrective

and preventive actions

documented

in your letter.

These actions will be further examined during

a future inspec-

tion/examination of your operator requalification program.

Your cooperation with us is appreciated.

Sincerely,

A~Ptldlg P

>

Thomas

T. Martin

Regional Administrator

OFFICIAL RECORD

COPY

?Oi 1 "rr> 1 76

90%-1

i"-'PFl

AZ>OCf: 0500(>41>,">

P'DC

PULLANI/RL/10/11/90 - 0001.0. 0

10/11/90

'Y

I

Niagara

Mohawk Power Corp.

cc w/encl.:

R. Sylvia, Senior Vice President

W. Hansen,

Manager,

Corporate Quality Assurance

M. Colomb, Unit 2 Superintendent,

Operations

C.

Beckham,

Manager,

Nuclear Quality Assurance

Operations

R. Abbott, Unit 2 Station Superintendent

J. Perry,

Vice President,

Quality Assurance

K. Dahlberg, Unit

1 Station Superintendent

R. Randall, Unit

1 Superintendent,

Operations

J. Firl.it, Vice President,

Nuclear Generation

C. Terry, Vice President

Nuclear Engineering

and Licensing

J.

Warden,

New York Consumer

Protection

Branch

T. Conner, Jr.,

Esquire

G. Wilson, Senior Attorney

J.

Keib, Esquire

Director,

Power Division, Department of Public Service,

Sta

State of New York, Department of Law

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

State of New York,

SLO Designee

bcc w/encl.:

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA

D. Lange,

OLB

J. Caldwell,

EDO

R. Martin,

NRR

R. Capra,

NRR

T. Martin,

RA

W. Kane,

DRA

L. Bettenhausen,

DRS

R. Conte,

DRS

S. Pullani,

DRS

R. Bellamy,

DRSS

J. Linville, DRP

D. Vito,

DRP

G. Meyer,

DRP

M. Miller, DRP

DRS Files (3)

te of New York

"DRS:RI

  • DRS:RI
  • NRR:OLB

"DRS:RI

R

I

DR

'

.RI

Pullani/ajk

Conte 'ange

Bettenhausen

Hodges

Vfy

M @tin

11/13/90

11/

/90

11/

/90

11/

/90

11/J3/90

11/II,/90

11/Is /90

  • SEE PREVIOUS

CONCURRENCE

PAGE

OFFICIAL RECORD

COPY

PULLANI/RL/10/11/90 - 0002.0.0

10/11/90

A

(

II

Niagara

Mohawk Power Corp.

cc w/encl.:

R. Sylvia, Senior Vice President

W. Hansen,

Manager,

Corporate Quality Assurance

M. Colomb, Unit 2 Superintendent,

Operations

C.

Beckham,

Manager,

Nuclear Quality Assurance

Operations

R. Abbott, Unit 2 Station Superintendent

J. Perry,

Vice President,

Quality Assurance

K. Dahlberg, Unit 1 Station Superintendent

R. Randall, Unit

1 Superintendent,

Operations

J. Firlit, Vice President,

Nuclear Generation

C. Terry, Vice President

Nuclear Engineering

and Licensing

J.

Warden,

New York Consumer Protection

Branch

T. Conner, Jr.,

Esquire

G. Wilson, Senior Attorney

J.

Keib, Esquire

Director,

Power Division, Department of Public Service,

State of New York

State of New York, Department of Law

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

K. Abraham,

PAO (24)

SALP Report

and (2) All Inspection

Reports

State of New York,

SLO Designee

bcc w/encl.:

Region I Docket

Room (with

Management Assistant,

DRMA

D.

Lange,

OLB

J. Caldwell,

EDO

R. Martin,

NRR

R. Capra,

NRR

L. Bettenhausen,

DRS

R. Conte,

DRS

S. Pullani,

DRS

R. Bellamy,

DRSS

J. Linville, DRP

D. Vito,

DRP

G. Meyer,

DRP

M. Miller, DRP

DRS Files (3)

DRS: RI

DRS RI

pullanl/ajk

yConte

11/oG/90

1/o i'90

concurrences)

NRR:OLB

DRS:RI

an

e QM)Be

hausen

11/O7 00

11/ g/90

DRS:RI

Hodges

11/

/90

OFFICIAL RECORD

COPY

.

PULLANI/RL/10/11/90 - 0002.0.0

10/11/90