Forwards Requalification Exam Rept 50-410/90-16OL During Wk of 900430.Three Crews Performed Satisfactorily on Exam.All Six Senior Reactor Operators & Nine Reactor Operators Passed All Portions of Exam
ML17056A869
Person / Time
Site: Nine Mile Point 
Issue date: 05/31/1990
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Burkhardt L
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17056A870 List:
References
NUDOCS 9006060042
Download: ML17056A869 (6)


See also: IR 05000410/1990016

Text

NAY 3i

1990

Docket No. 50-410

Niagara

Mohawk Power Corporation

ATTN:

Mr. Lawrence Burkhardt, III

Executive Vice President

Nuclear Operations

301 Plainfield Road

Syracuse,

New York

13212

Gentlemen:

Subject:

REQUALIFICATION PROGRAM EVALUATION, REPORT

NO. 50-410/90-16

(OL)

During the week of April 30,

1990,

the

NRC conducted

a requalification

program

evaluation at the Nine Mile Point Nuclear Station,

Unit 2.

The evaluation

was

conducted

in accordance

with NUREG-1021,

"Operator Licensing Examiner Stand-

ards," Revision 5, section

ES-601,

"Administration of NRC Requalification

Program Evaluations."

The evaluation

had two purposes:

( 1) to evaluate indi-

vidual licensed operator

competency,

and (2) to evaluate

the effectiveness

of

the licensed

operator training program.

At the conclusion of the evaluation,

findings related

to the preparation

and administration of the requalification

examinations

were discussed

with those

members of your staff identified in the

enclosed

report.

The three

crews that participated

in the examinations

performed satisfactorily

on the simulator portion of the examination.

All six senior reactor operators

and nine reactor operators

examined

passed all portions of the examination.

However,

because

the program

had been previously declared

unsatisfactory,

further

actions

as discussed

in this letter are to be completed prior to returning the

program to

a satisfactory

status.

During this examination

process,

the

NRC team also reviewed the implementation

of the corrective actions for the deficiencies identified during the July 1989

requalification examination which resulted

in an unsatisfactory requalification

program evaluation.

These corrective actions

are documented

in an Action Plan

attached

to your letter dated January

10,

1990.

The team concluded that the

corrective actions

were essentially

complete

and generally effective

and that

a

significant improvement in the requalification program

was evident.

In order to return the requalification

program to

a satisfactory

status,

Niagara

Mohawk should certify in writing to the

NRC Regional Administrator that

all short term corrective actions

have

been

completed

(see

Sections

7.3, 7.4,

and 7.9)

and that all program deficiencies,

including those identified by the

NRC, have

been

addressed.

OFFICIAL RECORD

COPY

9Q06060042

90053l

PDR

AGGCK C>50004lO

V

PDC

g

)pn.

pg09

)li

IR NMP2 90-16

OL - 0001

~ 0.0

05/30/90

Niagara

Mohawk Power Corp.

The enclosed

report also documents

a violation reported

by Niagara

Mohawk in a

letter dated

February

21,

1990,

regarding

the medical

examination of licensed

operators.

In reviewing this matter,

the

NRC staff has determined that issuing

a Notice of Violation is not appropriate.

The staff has

chosen

to exercise

this discretion

because

the violation meets all of the criteria of Appendix

C

of 10 CFR Part 2, Section

G for a licensee

identified violation.

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of

this letter

and the enclosed

report will be placed

in the

NRC Public Document

Room.

Should you have

any questions,

please

contact

Mr.

R. Conte,

Chief

BWR Section,

at (21S)

337-S210.

Sincerely,

ROBERT M. GALLO

Robert

M. Gallo, Chief

Operations

Branch

Division of Reactor Safety

Enclosure:

Requalification

Program Evaluation,

Report

No. 50-,410/90-16

(OL)

with Attachments

cc w/encl:

C.

Mangan,

Senior Vice President

W. Hansen,

Manager,

Corporate Quality Assurance

M. Colomb, Unit 2 Superintendent,

Operations

C.

Beckham,

Manager,

Nuclear Quality Assurance

Operations

R. Abbott, Unit 2 Station Superintendent

J. Perry,

Vice President,

Quality Assurance

K. Dahlberg, Unit 1 Station Superintendent

R. Randall, Unit

1 Superintendent,

Operations

J. Willis, General

Station Superintendent

C. Terry, Vice President

Nuclear Engineering

and Licensing

J.

Warden,

New York Consumer Protection

Branch

T. Conner, Jr.,

Esquire

G. Wilson, Senior Attorney

J.

Keib, Esquire

Director,

Power Division, Department of Public Service,

State of New York

State of New York, Department of Law

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

State of New York,

SLO Designee

OFFICIAL RECORD

COPY

IR NMP2 90-16

OL " 0002.0.0

05/30/90

Niagara

Mohawk Power Corp.

bcc w/encl:

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encl)

R. Bellamy,

DRSS

J. Linville, DRP

D. Limroth,

DRP.

G. Meyer,

ORP

J

~ Caldwell,

NRR

R. Martin,

NRR

'.

Conte,

ORS

P. Bonnett,

ORS

J. Williams,

ORS.

G. Buckley, Examiner,

PNL

L. Larson,

Examiner,

PNL

J.

Oyer,

EDO

NRR Project Manger

ORS Files (5)

ORS:RI

Pul

'/ajk

05/

/90

RS:RI

n

05/P/90

0

G

lo

05/

0

OFFICIAL RECORD

COPY

IR NMP2 90-16

OL 0003.0. 0

05/10/90