Forwards Safety Sys Functional Insp Followup Rept 50-220/89-18 on 890612-16.Four Unresolved Issues from Original Rept Remain Open.Concern Expressed Re Limited Design Margin for Core Spray Sys
ML17056A163
Person / Time
Site: Nine Mile Point 
Issue date: 07/25/1989
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Burkhardt L
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17056A164 List:
References
NUDOCS 8908070387
Download: ML17056A163 (8)


See also: IR 05000220/1989018

Text

. gC CKMRATED

D1STKBUTION

DKMONSTRXT10N

SYSTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM

(RZDS)

SSION NBR:8908070387

DOC.DATE: 89/07/25

NOTARIZED: NO

IL:50-220 Nine Mile Point Nuclear Station, Unit 1, Niagara

Powe

UTH.NAME

AUTHOR AFFILIATION

KANE,W.F.

Region 1, Ofc of the Director

RECZP.NAME

RECIPIENT AFFILIATION

BURKHARDT,L.

Niagara

Mohawk Power Corp.

SUBJECT:

Forwards

SSFZ Followup Rept 50-220/89-18

on 890612-16.No

violations noted.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Vio ation Response

NOTES

DOCKET

N

05000220

R

S

RECIPIENT

ID CODE/NAME

PD1-1

PD

INTERNAL

ACRS

AEOD/DEIIB

DEDRO

NRR/DEST DIR

NRR/DOEA DIR 11

NRR/DREP/RPB.

10

NUDOCS-ABSTRACT

OGC/HDS1

RES MORISSEAU,D

AL: LPDR

NBIC

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1-

1

1

1

RECIPIENT

ID CODE/NAME

SLOSSON,M

AEOD

AEOD/TPAD

NRR SHANKMAN,S

NRR/DLPQ/PEB

NRR/DREP/EPB

10

NRR/PMAS/ILRB12

OE L

N,J

G FILE

F

1

NRC PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1

'

1

1

1

1

1

1

1

1

1

.1

1

1

1

1

D

R

I

NCTE IO ALL RIDS" RECZPZEPIS:

S

D

D

PZZASE HELP US IO REDUCE RA8TE!

CGNZACT IHE DOCUMEKZ CONTROL DESK

LISTS FOR DOCUMEHIS KRJ DGH~T NEEDt

'L NUMBER OF COP1ES

REQUIRED:

LTTR

25

ENCL

25

JUL 25 1989

Docket No. 50-220

Niagara

Mohawk Power Corporation

ATTN:

Mr. Lawrence Burkhardt, III

Executive Vice President

Nuclear Operations

301 Plainfield Road

Syracuse,

New York

13212

Gentlemen:

Subject:

Safety

System Functional

Inspection

(SSFI)

Followup Report

Number

(50-220/89-18)

During the week of June

12-16,

1989,

an Inspection

(No. 89-18)

was conducted

by

Mr.

R. Barkley of my staff and Messrs. J.

Dyer and

V. McCree of NRR,

as well as

two

NRC consultants,

This inspection

was conducted

to followup on your actions

taken

to resolve

the

concerns

we raised

during

the

Safety

System

Functional

Inspection

(SSFI) (50-220/88-201)

conducted at your facility during .the period

September

12, 1988'hrough

October

7,

1988.

As

a result of this inspection,

the inspectors

determined

that you

have

made

significant progress

i'n resolving

the

concerns

raised

by the

SSFI.

However,

four of the

ten

unresolved

issues

raised

in the original

SSFI report

remain

open

as well

as

our additional

concerns

outlined

in our letter to you dated

June

12,

1989,

regarding

the design

of the core spray

system.

These

remaining

issues

are

described

in the

enclosed

report.

Of particular

concern

is

the

apparent

limited design

margin provided for the core

spray

system with regard

to

pump flow and valve stroke

times.

As

noted

in the

enclosed

report,

this

limitation

may also

be

generic

to other

plant

systems

and

may

preclude

the

detection

of degraded

performance

prior to reaching

a Technical

Specification

limit.

Me

plan

to

evaluate

the

resolution

of this

issue

following system

testing.

Please

note that while certain

of the

technical

concerns

raised

in the

SSFI

report

have

been

resolved

during this inspect,ion,

certain

issues

continue

to

receive

NRC review for any potential

enforcement action.

No

response

to this report is required.

Resolution

of the

remaining

issues

from the

SSFI will be verified prior to Unit

1 restart.

OFFICIAL RECORD

COPY

8v08070

S7 89072

PDh

ADOCK 0.000220

9

PDP:

IR NMP1 89-18 - 0001.0.0

07/20/89

Niagara

Mohawk Power Corporation

gal,25 3988

The

cooperation

of your staff during this

inspection

was excellent

and very

much appreciated

by my staff.

Sincerely,

+pig~} Q.

q~p( Qy

William F.

Kane, Director

Division of Reactor Projects

Enclosure:

Safety System Functional

Inspection

Followup Inspection

Report

No. 50-220/89-18

cc w/encl:

C.

Mangan,

Senior Vice President

D. Palmer, Acting Manager,

Qual.ity Assurance

W. Hansen,

Manager,

Corporate Quality Assurance

R. Smith, Unit 2 Superintendent,

Operations

C.

Beckham,

Manager,

Nuclear Quality Assurance

Operations

R. Abbott, Unit 2 Station Superintendent

J. Perry,

Vice President,

Quality Assurance

K. Dahlherg, Unit

1 Station Superintendent

R. Randall, Unit

1 Superintendent,

Operations

J. Willis, General

Station Superintendent

C. Terry, Vice President

Nuclear Engineering

and Licensing

J.

Warden,

New York Consumer Protection

Branch

Connor 5 Wetterhahn

T. Conner, Jr.,

Esquire

G. Wilson, Senior Attorney

J.

Keib, Esquire

Director,

Power Division, Department of Public Service,

State of New York

State of New York, Department of Law

Public Document

Room (PDR)

~

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

State of New York

OFFICIAL RECORD

COPY

IR NMP1 89-18 - 0002.0.0

07/20/89

Niagara

Mohawk Power Corporation

bcc w/encl:

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encl)

W. Kane,

DRI

J. Wiggins,

DRP

D. Limroth,

DRP

.

R.

Bar k1ey,

DRP

K. Abraham,

PAO

J.

Dyer,

EDO

W. Lanning,

NRR

V. McCree,

NRR

SU(. ~5 ~>SS

RI: DRP

RBarkley/mjd

7/:7/89

~g~5/r1

RI: DRP

JJohnson

f/!'.-/89

Q~ ~u Ir'I

OFFICIAL

~~,'RR

.'EDO

RI: DRP

VMcgree ~

JDyer

Wiggins

// /2

/'zp

7/!7/89

7/!, l89

7/g[l89

RECORD

COPY

IR NMP1 89"18 - 0003.0.0

07/17/89

7/." /89