Requests Addl Info Re Licensee Amend Application Concerning Generic Ltr 87-09,including Affirmation That Remedial Measures Prescribed for Affected Action Statements Consistent W/Fsar & Supporting Safety Analyses
ML17055E719
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 05/19/1989
From: Slosson M
Office of Nuclear Reactor Regulation
To: Burkhardt L
NIAGARA MOHAWK POWER CORP.
References
GL-87-09, GL-87-9, TAC-68463, NUDOCS 8905260113
Download: ML17055E719 (12)


Text

~PS RECIJ~

(4

~o O

o~

+**yV t

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 May 19, 1989 Docket No. 50-410 Mr. Lawrence Burkhardt III Executive Vice President, Nuclear Operations Niagara Mohawk Power Corporation 301 Plainfield Road

Syracuse, New York 13212

Dear Burkhardt:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION - LICENSEE AMENDIIENT APPLICATION CONCERNING GENERIC LETTER 87-09 FOR NINE NILE POINT UNIT tl0. 2 (TAC NO. 68463)

The basis for accepting Specification 3.0.4, related amendments under Generic Letter 87-09, is predicated on two assumptions: I) that the remedial measures prescribed by the Technical Specification ACTION STATEMENTS for which the exception will be granted provide a sufficient level of protection to permit operational mode changes and safe long-term operation consistent with the licensing basis described in the Final Safety Analysis Report for Nine Mile Point Unit No. 2; and 2) that it will be the exception when plant startup commences with important safety features inoperable, irrespective of the exceptions granted in response to applications under Generic Letter 87-09.

He have reviewed your license amendment application concerning Generic Letter 87-09, submitted June 14, 1988.

In order, for the NRC staff to conclude that the safety basis relative to the above stated assumptions is satisfied, we request that for each proposed Technical Specification exception to be granted under Generic Letter 87-09, you affirm that remedial measures prescribed for the affected ACTION STATEMENTS are consistent with the Final Safety Analysis Report and its supporting safety analyses.

In addition, we request that you identify and affirm those administrative controls (e.g.,

maintenance program provisions, plant operating procedures, management directives, onsite safety reviews, etc.) that have been established to limit the use of the Specification 3.0.4 exceptions granted.

Your affirmation should address training necessary for ensuring that plant operators are made aware of, and are instructed to exercise the controls promulgated in limiting the use of such exceptions.

8905260113 0~000+iQ 890519 PDOCK pDC p

4 0

is I

4 p,S

~ Q

~Cy Iill 0

+ +*

'\\

~

RfgI O~C I

n QX 4

  • y+

t UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Hay 19, 1989 Docket No. 50-410 g

Nr. Lawrence Burkhardt III Executive Vice President, Nuclear Operations Niagara Mohawk Power Corporation 301 Plainfield Road

Syracuse, New York, 13212.

Dear Burkhardt:

SUBJECT:

REQUEST FOR ADDITIONAL INFORHATION - LICENSEE AMENDMENT APPLICATION CONCERNING GENERIC LETTER 87-09 FOR NINE NILE POINT UNIT NO.

2 (TAC NO. 68463)

The basis for accepting Specification 3.0.4, related amendments under Generic Letter 87-09, is predicated on two assumptions:

1) that the remedial measures prescrib'ed by the Technical Specification ACTION STATEMENTS for which the exception will be granted provide a sufficient level of protection to permit operational mode changes and safe long-term operation consistent with the licensing basis described in the Final Safety Analysis Report for Nine Nile Point Unit No. 2; and 2) that it will be the exception when plant startup commences with important safety features inoperable, irrespective of the exceptions granted in response to applications under Generic Letter 87-09.

lie have reviewed your license amendment application concerning Generic Letter 87-09, submitted June 14, 1988.

In order, for the NRC staff to conclude that the safety basis relative to the above stated assumptions is satisfied, we request that for each proposed Technical Specification exception to be granted under Generic Letter 87-09, you affirm that remedial measures prescribed for the affected ACTION STATEHENTS are consistent with the Final Safety Analysis Report and its supporting safety analyses.

In.addition, we request that you identify and affirm those administrative controls (e.g.,

maintenance program provisions, plant operating procedures, management directives, onsite safety reviews, etc.) that have been established to limit the use of the Specification 3.0.4 exceptions granted.

Your affirmation should address training necessary for ensuring that plant operators are made aware of, and are instructed to exercise the controls promulgated in limiting the use of such exceptions.

J

Mr. Lawrence Burkhardt III 2

May 19, 1989 Please advise, within ten days after receipt of this letter, when we may expect to receive your response.

Should there be any questions concerning this request, please let me know.

The request in this letter affects fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely, cc:

See next page ORIGINAL SIGNED BY Marylee M. Slosson, Project Manager Project Directorate I-1 Division of Reactor, Projects I/II DISTRIBUTION oce

~e NRC PDR Local PDR PDI-1 Rdg SVar ga BBoger CVogan MSlos son RBenedict OGC EJordan BGrimes ACRS (10)

JJohnson, RI RCapra JStefano I RAI 4 GL 87-09 NMP-2 TAC 684633

'WW%

HQHWWW W

NAME :CVogan A%AW

~

%%\\%

WH DATE: ~/ I~/89 MSlosson:vr WW&WWWWW\\

WWWWWWWWW

/I /89 6'/I /89

%%%%&wwww RCapra WWH

%W&&%

&W&WWWW& &W WWW WO WWWWWW OFFICIAL RECORD COPY

~i C

I

CJ

( ~

Hr. Lawrence Rurkhardt III

'iagara Mohawk Power Corporation Kine Mile Pofn uclear Station Unit 2 CC, Mr. Troy B. Conner, Jr.,

Esq.

Conner 5 Wetterhahn Suite 1050 1747 Pennsylvania Avenue,'.W.

h'ashfngton, D.C.

20006 Mr. Richard Goldsmith Syracuse Unfversity College of Law E. I. Whfte Hall Campus

Syracuse, New York 12223 Resident Inspector Nine Hfle Point Nuclear Power Station P. 0.

Box 99

Lycoming, Hew York 13093

'Mr. Gary D. Wilson, Esoufre Niagara Mohawk Power Corporation 300 Erie Boulevard West

Syracuse, New York 13202 Mr. Peter E. Francisco, Lfcensfng Niagara Mohawk Power Corporation 301 Plainfield Road
Syracuse, Hew York 13212 Ms.

Donna Ross New York State Energy Office 2 Empire State Plaza 16th Floor

Albany, New York 12223 Regional Administrator, Regfon 'I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussfa, Pennsylvania 19406 Charl fe Donaldson, Esquf re Assistant Attorney General New York Department of Law 120 Braodway New York, New York 102?1 Vr. Richard M. Kessel Chafr and Executive Director:

State Consumer Protection Board 99 Washington Avenue

Albany, New York 12210 N

Mr. Richard Abbott, Unit 2 Station Superintendent Kine Mile Point Nuclear Station Nfagara Mohawk Power Corporatfon P. 0.

Box 32

Lycomfng, NY 13093 Mr. James L. Willis, Rreral Supt.,

Nuclear Generation Nine Mile Point Nuclear Station Niagara Mohawk Power Corporation P. 0.

Box 32

Lycoming, New York 13093

Mr. Lawrence Burkhardt III 2

May 19, 1989 Please advise, within ten days after receipt of this letter, when we may expect to receive your response.

Should there be any questions concerning this request, please let me know.

The request in this letter affects fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely, cc:

See next page ORIGINAL SIGNED BY Marylee M. Slosson, Project Manager Project Directorate I-1 Division of Reactor Projects I/II DISTRIBUTION NRC PDR

/PE,f Local PDR PDI-1 Rdg t~

SVarga BBoger CVogan MSlosson RBenedict OGC EJordan BGrimes ACRS (10)

JJohnson, RI RCapra JStefano LRAI 4 GL 87-09 NMP-2 TAC 684633 0

/9

~

<<WW

'W%

W

~ %0 NAllE

CVogan 'NSlosson:vr:RCapra DATE: 6/ l~/89: /I /89: 6/I /89 a

W &

r 0

~ &&&&&

OFFICIAL RECORD COPY

11 p

fl r,

r I

P N

4' li l'N ~

0 1

IP P

hIr. Lawrence 8urkhardt IIIO tHagara Mohawk Power Corporation a

CC Mr. Troy B. Conner, Jr.,

Esq.

Conner 5 Wetterhahn Suite 1050 1747 Pennsylvania Avenue,'.W.

Washington, D.C.

20006 Mr. Richard Goldsmith Syracuse University Col'lege of Law E. I. White Hall Campus

Syracuse, New York 122?3 Resident Inspector Nine Mile Point Nuclear Power Station P. 0.

Rox 99

Lycoming, New York 13093 Mr. Gary D. Wilson, Esouire Niagara Mohawk Power Corporation 300 Erie Boulevard West
Syracuse, New York 13?02 Hr. Peter E. Francisco, Licensing Niagara Mohawk Power Corporation 301 Plainffeld Road
Syracuse, New York 13212 Ms.

Donna Ross New York State Energy Office 2 Empire State Plaza 16th Floor

Albany, New York 12223 Nine Mile Pofn uclear Station Unit 2 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Charlie Donaldson, Esqufr e Assfstant Attorney General New York Department of Law I?0 Braodway New York, New York 10271 Mr. Richard M. Kessel

..Chai.r and Executive Director State Consumer Protection Boat d 99 Washington Avenue

Albany, New York 12210 Mr. Richard Abbott, Unit 2 Station Superintendent Nine Mfle Point Nuclear Station Niagara Mohawk Power Corporation P. 0.

Box 32

Lycomfnq, NY 13093 Mr. James L. Willfs, Gereral Supt.,

Nuclear Generation Nine Mile Point Nuclear Station Niagara Mohawk Power Corporation P. 0.

Box 32

Lycoming, New York 13093