Forwards Special Team Insp Rept 50-220/88-81 on 881205-15.No Violations Noted.Reiterates Understanding That Ltr Will Be Submitted to NRC by End of Jan 1989 Defining Schedule for long-term Corrective Actions Re Torus Wall Corrosion Issue
ML17055E471
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 01/19/1989
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Burkhardt L
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17055E472 List:
References
NUDOCS 8901260348
Download: ML17055E471 (6)


See also: IR 05000220/1988081

Text

A.C CELE P>'TED

DlSYKBUTI04

DEMONSTRA.TlOY

SYSTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

I

~

~

~

~

~

~

ESSION NBR:8901260348

DOC.DATE:,89/01/19

NOTARIZED:.NO

DOCKET

FACIL:50-220 Nine Mile Point Nuclear Station, Unit 1, Niagara -Powe

05000220

AUTH.NAME

AUTHOR AFFXLIATION

MARTIN,T.T.,

Region 1, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILXATION

BURKHARDT,L.

Niagara

Mohawk Power Corp.

R

SUBJECT:

Forwards Insp Rept 50-220/88-81

on 881205-15.No violations

noted.

P

DISTRIBUTION CODE: IE01D

COPIES RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES

D

RECIPIENT

ID CODE/NAME

PD1-1

PD

INTERNAL: ACRS

AEOD/DEIIB

NRR SHANKMAN,S

NRR/DLPQ/PEB 11

NRR/DOEA DIR ll

NRR/DREP/RPB

10

NRR/PMAS/ILRB12

O~IE, J

RE& FILE

02

RNAL: LPDR

NSIC

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1,

1

.1'

2

2

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

HAUGHEY,M

AEOD

DEDRO

NRR/DEST DIR

NRR/DLPQ/QAB 10

NRR/DREP/EPB

10

NRR/DRIS DIR 9A

NUDOCS-ABSTRACT

OGC/HDS 1

RGN1

FILE

01

NRC PDR

RESL MARTIN,D

COPIES

LTTR ENCL

1

. 1

1

1

1

1

1

1

1

1

.1

1

1

1

1

1

1

1

1

1

1

1

1

1

h

D

R

I

MZE TO ALL "RIDS"

RECIPIEÃIS'E

HELP US TO REDUCE WASTE!

CONTACT 'IHE DOCUMENI'XÃIROLDESK,

RXN Pl-37

(EXT. 20079)

IO EIiMQITE YOUR NAME HKH DZSKUBUTZON

LZSTS FOR DOCUMENI'S YOU DClN'T NEED)

C

k

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

26

ENCL

26

0

~

~

JQN 19

1s89

Docket No. 50-220

Niagara

Mohawk Power Corporation

ATTN:

Mr. Lawrence Burkhardt, III

Executive Vice President

Nuclear Operations

301 Plainfield

Road

Syracuse,

New.York

13212

Gentlemen

Sub ect: Ins ection

No.

-

0 88-8

J

p

50 22 /

1

This letter refers to the special

team inspection

led by Mr. H.

W. Kerch of

this office on December

5-15,

1988 at Nine Mile Point Nuclear Plant Unit

1 in

Scriba,

New. York.

Mr. Kerch discussed

the findings of the inspection with

Mr. C. Terry and other

members of your staff at the conclusion of the

inspection.

The purpose of the inspection

was to review the actions

you have taken to

correct previously identified problems in the Nine Mile Point

1 inservice

inspection

program

and to verify that the

new program is being properly

implemented with appropriate

management

controls to prevent recurrence

of

similar problems.

As discussed

in the exit meeting, it is our understanding

that you will submit

a letter to

NRC by the end of January

1989 defining your schedule for long term

corrective actions regarding the'orus

wall corrosion

issue

and stating your

intent to perform torus wall thickness

measurements

approximately every six

months until the long term corrective actions

have

been

implemented.

h

Within the

scope of this inspection,

no violations were identified.

Sincerely,

Or'-"',".1 FJ."-.od Bv!

Jaco"" P.. Dv.

Thomas

T. Martin, Director

Division of Reactor Safety

OFFICIAL RECORD

COPY

IR NMP1 88-81 - 0001.0.0

01/09/89

8901 2gi03gc,

c;yp g y p

F'DR

ADOC:K 0 000220

Q

PDC

i(

t

I

)

0

Niagara

Mohawk Power Corporation

JAN 19

19S9

cc w/encl:

J.

Perry,

Manager,

Nine Mile Point Unit

1 Restart

Task Force

C. Hangan,

Senior Vice President

D. Palmer, Acting Manager - Quality Assurance

Operations

T. Perkins,

Vice President,

Nuclear Generation

W. Hansen,

Manager Corporate Quality Assurance

K. Dahlberg, Unit

1 Station Superintendent

R. Randall, Unit

1 Superintendent,

Operations

C.

Beckham,

Manager Nuclear Quality Assurance

Operations

W. Drews, Technical

Superintendent

J. Wil'lis, General

Station Superintendent

C. Terry, Vice President

Nuclear Engineering

and Licensing

J.

F. Warden,

New York Consumer Protection

Branch

Troy B. Conner, Jr.

Esquire

John

W. Keib, Esquire

Director,

Power Division

State of New York, Department of Law

Licensing Project Manager,

NRR

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

.

State of New York

bcc w/encl:

Region

I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encl)

DRP Section Chief

PAO (2)

SALP Reports

and All Inspection

Reports

Robert J. Bores,

DRSS

B. Clayton,

EDO

C.

Y. Cheng,

NRR

G. Bagchi,

NRR

'DRS

Kerch/pmb/rw

RI:DRS

Strosnider

RI: DRS

Durr

j//(/89

1/(( /89

1/i 7/89

RI:DRS

Hartin

I//1/89

OFFICIAL RECORD

COPY

IR NMP1 88-81 - 0002.0.0

01/09/89