Forwards Insp Repts 50-220/88-17 & 50-410/88-17 on 880707- 0824 & Notice of Violation.Stop Work Order Issued as Result of QA Dept Surveillance of Inservice Insps Demonstrates Inadequate Control & Oversight of Program
ML17055E186
Person / Time
Site: Nine Mile Point  
Issue date: 09/15/1988
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mangan C
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17055E187 List:
References
NUDOCS 8809230152
Download: ML17055E186 (8)


See also: IR 05000220/1988017

Text

= 'ACCE&MggUL@~QP(g D,+@+~@II IR,DP)MZM

ACCESSION NBR:8809230152

DOC.DATE: 88/09/15

NOTARIZED:

NO

DOCKET

~

~

~

~

~

SCIL:50-220 Nine Mile Point Nuclear Station, Unit 1, Niagara

Powe

05000220

50-410 Nine Mile Point Nuclear Station, Unit 2, Niagara

Moha

.05000410

AUTH.NAME

AUTHOR AFFILIATION

WENZINGER,E.C.

Region 1, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

MANGANPC.V.

Niagara

Mohawk Power Corp.

SUBJECT:

Forwards

Insp Repts

50-220/88-17

6 50-410/88-17

on 880707-

0824

& notice of violation.

DZSTRTBUTZON CODE:

lE01D

COPZES

RECETVED:LTR /

ENCLj

STZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

ID CODE/NAME

PD1-1

PD

HAUGHEy<M

INTERNAL: ACRS

DEDRO

NRR/DLPQ/PEB ll

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NRR/PMAS/ILRB12

0

QN,J

REG FILE

02

GNl

FILE

01

COPIES

LTTR ENCL

1

1

2

2

2

2

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

BENEDICTPR

AEOD

NRR MORISSEAU,D

NRR/DLPQ/QAB 10

NRR/DREP/EPB

10

NRR/DRIS DIR 9A

NUDOCS-ABSTRACT

OGC/HDSl

RES/DSIR

DEPY

COPIES

LTTR ENCL

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

EXTERNAL: LPDR

Nsjc

NRC

PDR

1

1

S

h

TOTAL NUMBER OF COPIES

REQUlRED:

LTTR

27

ENCL

27

i5 SEP

1988

Docket No. 50-220

Docket No. 50-410

Niagara

Mohawk Power Corporation

ATTN:

Mr. Charles

V. Mangan

Senior Vice President - Nuclear

301 Plainfield Road

Syracuse,

New York

13212

Gentlemen:

Subject:

Inspection

Report

No. 50-220/88-17

and 50-410/88-17

This letter transmits

the results of the routine inspection

conducted

by

Messrs.

W. Cook,

W. Schmidt,

and

R.

Temps of this office on July

7 thru August

24,

1988 at Nine Mile Point Units

1 and 2, Scriba,

New York.

A summary of the

findings was presented

to Messrs.

R. Abbott and

R. Randall

and other members of

your staff at the conclusion of the inspection.

The Stop Work Order issued

as

a result of your guality Assur ance

Department'

surveillance of Inservice Inspections (ISI) being conducted at Unit 1, demon-

strates that your Engineering

Department

has not established

adequate

control

and oversight of the program.

Although guality Assurance

was. identifying

problems, effective actions

were not taken before escalation

to

a point where

the Stop Work Order

was necessary.

A Unit

1 Notice of Violation is attached.

This violation shows that further

action is required

by you to prevent

missed Fire Department surveillances

and

improve your administrative controls.

This violation has

been categorized

by

severity level according to 10 CFR Part 2, Appendix C (Enforcement Policy).

You

are required to respond to this violation and in preparing your response

you

should follow the instructions in Appendix A.

In addition, in your response

to this report you are requested

to provide

a

summary of your planned corrective actions regarding:

1) the Inservice In-

spection

Program

Stop Work Order at Unit 1; 2) general

conditions in Unit 1

including poor housekeeping

and cracking of the reactor building wall (section

3. 1); 3) setting of breaker overcurrent trip devices (section

5. l.b.); 4) de-

signating alternates

for the station

managers

without knowledge of a Senior

Reactor Operator (section 12);

and 5)

safety evaluation

reviews

made pursuant

to 10

CFR 50.59 (section

14).

The response

required

by this letter is not subject to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork

Reduction

Act of 1980,

PL 96-511.

BB0~~~

5

5000220

Bolas

PDR

ADQCK 05

pNU

G

~

~

Niagara

Mohawk Power Corporation

We appreciate

your cooperation.

1( SEP

1988

E

Sincerely,

"dRlGlNAL SrcNED By

Edward

C. Wenzinger,

Chief

Projects

Branch

No.

2

Division of Reactor Projects

Enclosures:

1) Appendix A, Notice of Violation

2)

NRC Region I, Inspection

Report

No. 50-220/88-17

and 50-410/88-17

cc w/encls:

Connor & Wetterhahn

John

W. Keib, Esquire

T. Perkins,

Vice President,

Nuclear Generation

J. Willis, General

Superintendent

K. Dahlberg, Station Superintendent,

Unit

1

R. Abbott, Station Superintendent,

Unit 2

R. Randall, Unit

1 Superintendent

of Operations

R. Smith, Unit 2 Superintendent

of Operations

C. Terry, Vice President,

Engineering

and Licensing

R. Palmer, Acting Vice President,

Quality Assurance

A. Pinter,

NMPC Site Licensing

C.

Beckham,

Manager Nuclear Quality Assurance

Operations

W. Hansen,

Manager Corporate Quality Assurance

Troy B. Conner, Jr.,

Esquire

Director,

Power Division

Department of Public Service,

State of New York

New York State,

Department of Law

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

State of New York

OFFICIAL RECORD

COPY

IR NMP 88-17

0002.0.0

11/29/80

bcc w/encls:

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encls)

J.

Johnson,

Section Chief,

DRP

M. Haughey,

Licensing Project Manager,

Unit

1 and

2

M. Miller, RI,

SLO

B. Clayton,

EDO, Regional

I Coordinator

P.

Koltay,

SRI,

IP3

A. Luptak, SRI, FitzPatrick

RI: DRP

q6.

Banerjee/meo

9/1@88

DRP

P

ohn son

~Wee

ingen

OFFICIAL RECORD

COPY

IR NMP 88-17 " 0002.1.0

11/29/80