Notification of 880609 Meeting W/Util in Rockville,Md to Discuss Isolation Valve Leak Testing Per Encl Agenda
ML17055D896
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/06/1988
From: Benedict R
Office of Nuclear Reactor Regulation
To: Miraglia F, Murley T, Sniezek J
NRC
References
NUDOCS 8806080022
Download: ML17055D896 (12)


Text

June 6,

19GS Docket No. 50-220 MFMORANDUM FOR:

T. Murley*

J. Sniezek*

F. Miraglia*

T. Martin*

S. Varga*

D. Crutchfield*

L. Shao*

C..Rossi*

C. McCracken J.

Roe C. Miller*

B. Boger G. Lainas L. Rubenstein J. Partlow F. Congel*

G. Holahan W. Lanning T. Martin, EDO A. Thadani Operations Ctr.

THRU:

FROM:

SUBJECT; DATE I'A TIME:

LOCATION:

PURPOSE:

Robert A. Capra, Director Project Directorate I-1 Division of'eactor Projects I/II Robert A. Benedict, Project Manager Project Directorate I-1 Division of Reactor Projects I/II DAILY HIGHLIGHT -

FORTHCOMING MEETING WITH NIAGARA MOHAWK POWER CORPORATION Thursday',

June 9, 1988 10:OO a.m.

One White Flint North 11555 Rockville Pike Rockville, MD Room 14B13 To discuss Nine Mile Point Unit 1 Isolation Valve Leak Testing per enclosed agenda.

PARTICI PANTS:

NRC E. Wenzinger R. Benedict J. Craig J.

Kudnick J. Pulsipher NMPC S. Wilczek P. Francisco B. Drews P. Mazzaferro R.,Coon

Enclosure:

As stated

,cc:

See next page PDI-1 RBenedict 6/3/88 Srl:)~ls'il~ 0 Robert A. Benedict, Project Manager Project Directorate I-l Division of Reactor Projects, I/II 8806080022 880606 PDR ADOCK 05000220 P

PDR

  • THESE COPIES MUST BE HANDCARRIED

Mr. C. V. Mangan Niagara Mohawk Power Corporation II Nine Mile Point Nuclear Station, Unit-No.

1 CC:

Hr. Trov B. Conner, Jr., Esquire Conner 8 Wetterhahn Suite 1050 1747 Pennsylvania

Avenue, N.

W.

Washington, D.

C.

20006 Mr. Frank R. Church, Supervisor Town of Scriba R,

D, P2

Osweqo, New York 13176 Mr. James L. Willis General Supt.-Nuclear Generation Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Post Office Box 32
Lycoming, New York 13093 Resident Inspector U.

S. Nuclear Regulatory Commission Post Office Box 126

Lycoming, New York 13093 Mr. Gary D. Wilson, Esquire Niagara Mohawk Power Corporation 300 Erie Boulevard West
Syracuse, New York 13202 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Ms.

Donna Ross New York State Energy Office 2 Empire State Plaza 16th Floor

Albany, New York 1P223 Mr. Thomas W.

Roman Unit 1 Station Superintendent Nine Mile Point Nuclear Station Post 0'ffice Box 32

Lycoming, New York 13093

0

NIAGARA MOHAMK POWKR CORPORATION NINE MILK POINT UNIT 1

DOCKET NO. 50.220 TECHNICAL ISSUES TO BE DISCUSSED AT APPENDIX J MEETING Testing required on valves provided with a water seal.

Exemption request on seal we.lded penetrations (see NM letter dated May 31, 1978).

Clarification of Appendix J Section III.A.6b (meanfng of approximately every 18 months).

Testing of shutdown cooling valves in the reverse direction.

Direction of test for Gore Spray Pump Discharge Valves.

Containment, Spray System orfginal Desfgn Bases.

tl

Enclosure NIAGARA i4tOHAMK POWER CORPORATION NINK NILE POINT UNIT 1

DOCKET NO. 50-220 APPENDIX J MEETING CATEGORIZATION OF VALVES BASED ON REVIEW OF HRC APPEHDIX J SER DATED MAY 6, 1988 VALVES WE HAVE NO PROBLEM TESTING IN ACCORDANCE WITH APPENDIX J LIQUID POISON ISOLATION VALVES 42.1'-02 AND 42.1"03 (AIR TKST).

CORE SPRAY PUMP DISCHARGE ISOLATION VALVES 40-05 AND 40-06 (WATER TEST),

VALVES THAT ARE TESTABLK BUT WILL PROBABLY NOT MEET APPENDIX d LEAKAGE REQUIREMENTS EMERGENCY COOLING CONDENSATE RETURN LINE ISOLATIQN VALVES 39-03~

"04, -05 AHD -06 (AIR,, TEST).

VALVES WHICH CANNOT BE LOCAL LEAK RATE TESTED MITHOUT SIGNIFICANT MODIFICATIONS SHUTDOWN COOLING SUPPLY AND RETURN LINE ISOLATION VALVES 38-01'02, "12 AHD -13 (AIR TEST).

CONTAINMENT, SPRAY PUMP SUCTIOH FROM SUPPRESSION CHAMBER ISOLATION VALVES 80-01, "02, -21 AND 22 (WATER TEST).

J I

II

VALVES PROVIDED WITH A MATER SEAL WHICH CANNOT BE LOCAL LEAK RATE TESTED WITHOUT SIGNIFICANT MODIFICATIONS IF.REQUIRED CONTAINMENT SPRAY SYSTEM (MATER TEST) a.

DRYMELL AND SUPPRESSION CHAMBER COMMON SUPPLY ISOLATION VALVES 80-15,

-10) -35 AND -36.

b.

DRYMELL BRANCH LINE ISOLATION VALVES 80-17, -18,

-37.

AND -38, c.

SUPPRESSION CHAMBER BRANCH LINE ISOLATION VALVES 80-19,

-3Q, -66')

-66) -67 AND "68.

4 CONTROL ROD DRIVE HYDRAULIC RETURN LINE ISOLATION VALVES 301-112 AND -113.

MEETING NOTICE DISTRIBUTION e meeting is to be held)

CDocket File

'RC PDR =

Local PDR PDI-1 Rdg M. Kane, RI T. l1urley/J. Sniezek F. Miraglia S.

Varga B. Boger G. Lainas R. Benedict M. Lannina OGC-Bethesda E. Jordan J. Partlow Receptionist (building wher ACRS (10)

GPA/PA V. Wilson D. Morley S. Black H. B. Clayton J. Craig J.

Kudrick J. Pulsipher E. l/enzinger

0 it ')'.y