ML17055D716
| ML17055D716 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 03/23/1988 |
| From: | Johnston W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mangan C NIAGARA MOHAWK POWER CORP. |
| References | |
| NUDOCS 8804040019 | |
| Download: ML17055D716 (8) | |
See also: IR 05000410/1988008
Text
'(CCELEMTED
DISTRIBUTION
DEMONSTRATION
SYSTEM
~
~
~
~
~
~
~
~
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ESSION NBR:8804040019
DOC.DATE: 88/03/23
NOTARIZED: NO
DOCKET
FACIL:50-410 Nine Mile Point Nuclear Station, Unit 2, Niagara
Moha
05000410
AUTH.NAME
AUTHOR AFFILIATION
JOHNSTON,W.V.
Region 1, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
MANGAN,C.V.
Niagara
Mohawk Power Corp.ss-<8
SUBJECT: Confirms dates of 880418-22 for NRC environ qualification
insp for facility.
DISTRIBUTION CODE: IEOID
COPIES
RECEIVED:LTR &CLL SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
I
05000410
NOTES 21
RECIPIENT
ID CODE/NAME
PD1-1
BENEDICT,R
INTERNAL: AEOD
NRR MORISSEAU,D
NRR/DLPQ/QAB10A
NRR/DREP/EPB10D
NRR/DRIS DIR9A2
BERMAN,J
G
.
02
GN1
FILE
01
EXTERNAL: LPDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
'
RECIPIENT
ID CODE/NAME
HAUGHEY,M
DEDRO
NRR/DLPQ/PEB11B
NRR/DOEA DIR11E
NRR/DREP/RPB10A
NRR/PMAS/ILRB12
OGC 15-B-18
RES/DRPS
DIR
NRC PDR
COPIES
LTTR ENCL
2
2
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
8j
'A
'A
'OTAL
NUMBER OF COPIES
REQUIRED:
LTTR
24
ENCL
24
I
0
Docket No. 50-410
Niagara
Mohawk Power Corporation
ATTN:
Mr.
C.
V. Mangan
Senior Vice President
301 Plainfield Road
Syracuse,
13212
Gentlemen:
MAR 23
]gag
Subject:
EQUIPMENT QUALIFICATION INSPECTION OF NINE MILE POINT NUCLEAR POWER
STATION, UNIT 2 (INSPECTION NO. 50-410/88-08)
This letter con'firms the dates of April 18-22,
1988 for the
NRC environmental
qualification (EQ) inspection for Nine Mile Point Nuclear
Power Station, Unit 2.
These
dates
were established
during
a telephone
conversation
on March 9,
1988
between
Mr. J. Jirousek of your organization
and Mr. Leonard
Cheung of
thi.s'ffice.
The inspection will take place at the corporate office and at the
plant site.
(
A management
entrance
meeting is scheduled for 2:00 p.m.
on April 18,
1988
with a management exit meeting tentatively scheduled
for 10:00 a.m.
on
April 22,
1988 at the corporate office.
A plant walkdown inspection of
specific
EQ equipment is planned for Wednesday,
April 20,
1988.
The inspection will include the following:
1.
Review of your implementation of 10 CFR 50.49
EQ program,
including
preservation
of qualified status of equipment.
2.
Review of
EQ documentation files.
3.
Physical
inspection of equipment selected
from the
EQ Master List.
Two weeks prior to the inspection
we will require
one .copy of each
document
identified in attachment
1, items
1 through
6 for review.
A duplicate
copy of this document
should
be sent to:
Uldi s Potapovs,
Chief
Equipment Qualification Inspection Section
White Flint North - 94
U.
S. Nuclear Regulatory
Commission
20555
wig/
8804040019
88032
ADOCK 05000410
P
OFFICIAL RECORD
COPY
EQLETTER " 0001.0.0
03/21/88
Niagara
Mohawk Power Corporation
Your cooperation with us during this inspection will be appreciated.
Should
you have
any questions
regarding this inspection,
please
contact either
Mr. Leonard
Cheung
(215-337-5296)
or Mr. C. Anderson at (215) 337-5376 of this
office.
Sincerely,
Wil
'am V. Johnston
Acting Director
Division of Reactor Safety
Attachment:
As Stated
cc w/encl:
Connor 5 Wetterhahn
John
W. Keib, Esquire
J.
A. Perry,
Vice President,
Quality Assurance
W. Hansen,
Manager,
Corporate Quality Assurance
J. Aldrich, Unit
1 Superintendent,
Operations
R.
G. Smith, Unit 2 Superintendent,
Operations
C.
Beckham,
Manager,
Nuclear Quality Assurance
Operations
T. J. Perkins,
General
Superintendent
R.
B. Abbott, Unit 2 Station Superintendent
Department of Public Service,
State of New York
Public Document
Room
(PDR)
Local Public Document
Room
( LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
State of New York
bcc w/encl:
Region I Docket
Room (with concurrences)
Management Assistant,
DRMA (w/o encl)
DRP Section Chief
Region I SLO
Robert J.
DRSS
Leonard Cheung,
OFFICIAL RECORD
COPY
EQLETTER - 0001. 1. 0
03/21/88
ATTACHMENT 1
REFERENCES
1.
Licensee's
overall
EQ Program
2.
NRC Safety Evaluation Reports
concerning
environmental qualification
of safety-related
electrical
equipment.
3.
EQ Master List, version in effect at time of inspection.
4.
a.
D.
G. Eisenhut to Licensee's
and Applicants,
dated
December
27,
1984, Subject:
Certification of Compliance to
b.
Licensee's
response
5.
Licensee's
current
System
Component Evaluation Worksheets
(SCEW sheets)
or equivalent.
6.
Licensee's
procedures
applicable to equipment qualification
(EQ program,
procurement of qualified equip'ment,
maintenance
of qualified equipment,
modifications to
EQ equipment,
EQ personnel
training (site
and corporate
personnel),
QA/EQ interface including corporate
QA, Site
QA/QC audits,
EQ spare
parts
procurement
and licensee
program for
EQ related
NRC
Information Notices/Bulletins.
7.
Licensee's
qualification documentation
and/or files.
Items
1 through
6 are requested
for review before the inspection.
Items
1 through
7 must
be available for the inspectors
use throughout the
inspection.
4