ML17055D326
| ML17055D326 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 10/29/1987 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mangan C NIAGARA MOHAWK POWER CORP. |
| Shared Package | |
| ML17055D327 | List: |
| References | |
| NUDOCS 8711040372 | |
| Download: ML17055D326 (6) | |
See also: IR 05000220/1987018
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM
( R I DS
)
hCCESSION
NBR: 8711040372
DOC. DATE: 87/10/29
NOTARIZED:
NO
FACIL: 50-220 Nine Mile Point Nuclear Stations
Uni t ii Niagara
Powe
50-410 Nine Mile Point Nuclear Station.
Unit 2,
Niagara
Moha
AUTH. NAME
AUTHOR AFFILIATION
WENZ INGERi E. C.
Reg i on ii Of c
of the Direc tor
RECIP. NAME
RECIPIENT AFFILIATION
MANGANiC. V.
Niagara
Mohawk Power
Corp.
SUBJECT:
Forwards
Insp Repts
50-220/87-18
Px 50-410/87-37
on
870831-1004
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED: LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES: 21
DOCVET e
05000220
05000410
05000410
REC IP IENT
ID CODE/NAME
PDi-1
HAUGHEYr M
INTERNAL:
DEDRO
NRR/DOEA
DIR
NRR/DREP /RP 8
NRR/PMAS/ ILRB
OGC/HDS1
DEPY GI
TERNAL:
LPDR
COPIES
LTTR ENCL
1
1
2
2
2
2
,1
1
2
2
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
8ENEDICT. R
BENEDICT'
- EOD
MOR ISSEAUi D
NRR/DREP/EPB
NRR/DRIS DIR
EBERMANi J
RGFL
RGN1
FILE
01
NRC
COPIES
LTTR ENCL
2
2
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
26
ENCL
26
~
'
'
Docket No. 50-220
Docket No. 50-410
I9 OcT 1987
Niagara
Mohawk Power Corporation
ATTN:
Mr. Charles
V. Mangan
Senior Vice President
Nuclear
301 Plainfield Road
Syracuse,
'13212
Gentlemen:
Subject:
Inspection
Report
No. 50-220/87-18
and 50-410/87-37
This letter transmits
our report of the routine inspection
conducted
by Messrs.
W. Cook,
C. Marschall
and
W. Schmidt of this office on August 31,
1987 through
October 4,
1987 at Nine Mile Point Units
1 and 2, Scriba,
A summary
of the findings was presented
to Mr. T. Perkins
and other
members of your staff
at the conclusion of the inspection.
Based
on our review,
a violation of 10 CFR 50 Appendix
R and your Fire.
Protection
Program
was identified at Unit 2.
This violation indicates that
the Operations staff did not properly implement
a requirement to disable
valves important to the continued operation of safety
systems,
in the event of
. a fire.
This violation has
been categorized
by severity level according to
10 CFR Part 2, Appendix
C (Enforcement Policy).
You are required to respond to
this violation and in preparing your response
you should follow the
instructions in Appendix A.
The response
required
by this letter is not subject to the clearance
procedures
of the Office of Management
and Budget as required
by the Paperwork
Reduction Act of 1980,
PL 96-511.
We appreciate
your cooperation.
7 i g040372 87 ~0~~+~~0
ADOCK 0
8
Sincerely,
P
- g~ Signed Byi
Edward
C. Wenzinger,
Chief
Projects
Branch
No.
2
Division of Reactor Projects
Enclosures:
l. Appendix A, Notice of Violation
2.
NRC Region I, Combined Inspection
Report
No. 50-220/87-18
and 50-410/87-37
OFFICIAL RECORD
COPY
CIR
NMP 87-18/37
0001.0.0
10/29/87
'
Niagara
Mohawk Power Corporation
RSOCT
13o
cc w/encls:
Connor 5 Wetterhahn
John
W. Keib, Esquire
T.E.
Lempges,
Vice President,
Nuclear Generation
T.J. Perkins,
General
Superintendent
T.W.
Roman, Station Superintendent,
Unit
1
R.B. Abbott, Station Superintendent,
Unit 2
J.C. Aldrich, Unit
1 Superintendent
of Operation
R.G. Smith, Unit 2 Superintendent
of Operations
J.A. Perry,
Vice President,
Quality Assurance
A;Z. Pinter,
NMPC Site Licensing
C.G.
Beckham,
Manager Nuclear Quality Assurance
W.A. Hansen,
Manager Corporate Quality Assurance
Troy B. Conner, Jr.,
Esquire
Director,
Power Division
Department of Public Service,
State of New York
Public Document
Room
(PDR)
Local Public Document
Room ( LPDR)
Nuclear
Safety Information Center
(NSIC)
NRC Resident
Inspector
State of New York
Brent Clayton,
Operations
bcc w/encls:
Region I Docket
Room (with concurrences)
Management Assistant,
DRMA (w/o encl.s)
C. Anderson,
J.R.
Johnson,
Section Chief,
R.A. Benedict,
Licensing Project Manager,
Unit
1
M.F. Haughey,
Licensing Project Manager, Unit 2
State
Liaison Officer (SLO)
RI:D
Johnson/rhl
10/Z~/87
R
P
W
ger
10$,$87
OFFICIAL RECORD
COPY
CIR NMP 87-18/37 - 0002.0.0
10/29/87