August 29, 1986 DI IBUTION:
oc et o.
0-410 NRC PDR Local PDR BWD-3 r/f EAdensam MHaughey EHylton RBernero LHulman FWitt JKudrick PHearn Docket No. 50-410 Mr. C. V. Mangan, Senior Yice President Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, New York 13202
Dear Mr. Mangan:
Subject:
FSAR Amendment 27 for Nine Mile Point Unit 2 Sincerely,
'The NRC staff has reviewed the following sections of FSAR Amendment 27 for the Nine Mile Point Unit 2 Plant: Section 6.2, 9.5.1, 9.5.4, 9A, 11.2, 11.4, 12.3, 12.5, and Table 15.6-13.
Because of discrepancies in the design description we request the additional information on the Division III diesel starting system seismic qualification, combustible gas control system, and primary containment isolation system identified in the enclosure be provided in order for the staff to complete its review.
A draft of this request for additional information was provided to Don Hill, of your staff, on August 26, 1986.
Enclosure:
As stated
/S/
Mary F. Haughey, Project Manager BWR Project Directorate,No.
3 Division of BWR Licensing cc:
See next page MHaughey/hmc 8@ /86 L:
-.BL 1
on 8/gQ/86 D
D-
- DBL E
am 8
/86 Sb09090344 8b0829'DR
- DOCK 05000410 A
(
re iI
Mr. C.
Y. Mangan Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Unit 2 CC:
Mr. Troy B. Conner, Jr.,
Esq.
Conner 5 Wetterhahn Suite 1050 1747 Pennsylvania
- Avenue, N.W.
Washington, D.C.
20006 Richard Goldsmith Syracuse University College of Law E. I. White Hall Campus
- Syracuse, New York 122?3 Ezra I. Bialik Assistant Attorney General Environmental Protection Bureau New York State Department of Law 2 World Trade Center New York, New York 10047 Resident Inspector Nine Mile Point Nuclear Power Station P. 0.
Box 99
- Lycoming, New York 13093 Mr. John W. Keib, Esq.
Niaqara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, New York 13202 Mr. James Linville U. S. Nuclear Reaulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Norman Rademacher, Licensing Niaaara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, New York 13202 Don Hill Niagara Mohawk Power Corporation Suite 550 4520 East West Highway
- Bethesda, Maryland 20814 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue Kinq of Prussia, Pennsylvania 19406 Mr. Paul D. Eddy New York State Public Serice Commission Nine.Mile Point Nuclear Station-Unit II P.O.
Box '63
- Lycoming, New York 13093
Re uest For Additional Information From Nia ara Mohawk Power Cor oration Nine Mile Point Unit 2 Docket No. 50-410 The third paragraph is confusing and contradicts Table 3.2-1 and Figure 9.5-46 designation of the seismic classification of piping and components of the Division III diesel starting system.
The first sentence indicates the air receiver is seismic Category I, while the second sentence indicates the receiver
's not seismic Category I.
Page 9.5-43b indicates that the air receiver and the
'nterconnecting piping and components are designed to Category I, ASME Section III, while Figure 9.5-46 indicates only the air receiver meets these requirements.
Please reconcile the discrepancy and also indicate the location of the air dryers in relation to the seismic Category I interface.
Explain the deletion of seismic qualification to IEEE 344-1975 of the air dryer system in FSAR Amendment 27.
2.
Pa e 6.2-73 and 74 Item 11 page 6.2-74 was deleted by Amendment 27 since the applicant claims that it was redundant to item 3 on page 6.2-74.
Item 11 indicated that the initiation of the recombiners is based on manual actuation from the control, room.
Item 3 does specify manual initiation, but not from the control room.
Please clarify.
3.
Table 6.2-57 a
e 1
The summary of incorporated
- changes, page 15 (SIC-15), indicated a change in the combustible gas monitoring system operation from continuous to manual.
Amendment 27 specifies continuous.
Please Clarify.
4.
Table 6.2-56 2 of 24 For penetration No. Z-4A, under valve 2FWS*AOV23A potential bypass leakage
- path, a superscript note (30) was added to "yes".
This was not in the previous amendment,,nor was this change indicated in the SIC list.
Please correct.
)
wl