IR 05000277/2016006

From kanterella
(Redirected from ML17055B661)
Jump to navigation Jump to search
Annual Assessment Letter Units 2 and 3 - Report Nos. 05000277/2016006 and 05000278/2016006 with Report 22
ML17055B661
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/01/2017
From: Daniel Schroeder
Division Reactor Projects I
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Schroeder D
References
IR 2016006
Download: ML17055B661 (5)


Text

March 1, 2017

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 - REPORT NOS. 05000277/2016006 AND 05000278/2016006

Dear Mr. Hanson:

The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016 through December 31, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at PBAPS Units 2 and 3 during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2018.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. Additionally, the NRC plans to conduct temporary instruction (TI)

192, Inspection of the Licensees Interim Compensatory Measures Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems, and Inspection Procedure 60855.1, Operation of an Independent Spent Fuel Storage Installation Loading Campaign.

The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5262 with any questions you have regarding this letter.

Sincerely,

/RA/

Daniel L. Schroeder, Chief Reactor Projects Branch 4 Division of Reactor Projects

Docket Nos.

50-277 and 50-278 License Nos. DPR-44 and DPR-56

Enclosure:

Inspection/Activity Plan

ML17055B661

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

OFFICE RI/DRP RI/DRP

NAME SBarber/SB DSchroeder/DS

DATE 2/24/17 2/24/17

Peach Bottom Inspection / Activity Plan 01/01/2017 - 12/31/2018 Unit Number Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title Page 1 of 2 02/03/2017 14:44:36

3/20EXAM

- PEACH BOTTOM INITIAL OL EXAM

02/20/2017 02/24/2017 U01942 FY-17-PB INITIAL OPERATOR LICENSING EXAM

03/20/2017 03/31/2017 U01942 FY-17-PB INITIAL OPERATOR LICENSING EXAM

7111111B

- PB REQUAL INSP WITH P/F RESULTS 2, 3 02/27/2017 03/03/2017 IP 7111111A Licensed Operator Requalification Program - Annual Review 2, 3 02/27/2017 03/03/2017 IP 7111111B Licensed Operator Requalification Program

71152B

- PI&R BIENNIAL 2, 3 03/13/2017 03/17/2017 IP 71152B Problem Identification and Resolution 2, 3 03/27/2017 03/31/2017 IP 71152B Problem Identification and Resolution

7111121M

- DESIGN BASES ASSURANCE INSPECTION (TEAM)

2, 3 01/30/2017 02/03/2017 IP 7111121M Component Design Bases Inspection (Teams)

2, 3 02/13/2017 02/17/2017 IP 7111121M Component Design Bases Inspection (Teams)

EP

- EP PROGRAM INSPECTION 2, 3 03/27/2017 03/31/2017 IP 7111402 Alert and Notification System Testing 2, 3 03/27/2017 03/31/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2, 3 03/27/2017 03/31/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 2, 3 03/27/2017 03/31/2017 IP 71151 Performance Indicator Verification

71124

- IP 71124.01 RAD HAZARD.04 AIRORNE 2, 3 03/20/2017 03/23/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 03/20/2017 03/23/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation

71124.08

- RADWASTE 2, 3 07/17/2017 07/21/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation

71124

- HP INSPECTION 01 02 03 04 2, 3 10/23/2017 10/27/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 10/23/2017 10/27/2017 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 10/23/2017 10/27/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 10/23/2017 10/27/2017 IP 71124.04 Occupational Dose Assessment 2, 3 10/23/2017 10/27/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness

7111108G

- U3 INSERVICE INSPECTION

10/30/2017 11/03/2017 IP 7111108G Inservice Inspection Activities - BWR

7111105T

- TRIENNIAL FIRE PROTECTION 2, 3 04/02/2018 04/06/2018 IP 7111105T Fire Protection [Triennial]

2, 3 04/16/2018 04/20/2018 IP 7111105T Fire Protection [Triennial]

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Peach Bottom Inspection / Activity Plan 01/01/2017 - 12/31/2018 Unit Number Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title Page 2 of 2 02/03/2017 14:44:36

71124

- RAD MONITORING INSTRU 2, 3 03/26/2018 03/29/2018 IP 71124.05 Radiation Monitoring Instrumentation

EP

- EP EXERCISE INSPECTION 2, 3 04/23/2018 04/26/2018 IP 7111401 Exercise Evaluation

ISFSI

- ISFSI LOADING CAMPAIGN INSPECTION 2, 3 05/14/2018 05/18/2018 IP 60855 Operation Of An ISFSI 2, 3 05/14/2018 05/18/2018 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants

71124

- RAD HAZARD & ALARA 01 02 2, 3 05/07/2018 05/11/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 05/07/2018 05/11/2018 IP 71124.02 Occupational ALARA Planning and Controls

71124

- RAD EFFLUENTS 2, 3 06/11/2018 06/15/2018 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment

71124

- REMP 2, 3 07/09/2018 07/13/2018 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment

71124

- IP 71151 PI VERIFY IP 71124.01.02.03.

10/22/2018 10/25/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

10/22/2018 10/25/2018 IP 71124.02 Occupational ALARA Planning and Controls

10/22/2018 10/25/2018 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation

10/22/2018 10/25/2018 IP 71124.04 Occupational Dose Assessment

10/22/2018 10/25/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness

10/22/2018 10/25/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences

U2 ISI

- UNIT 2 INSERVICE INSPECTION

10/29/2018 11/02/2018 IP 7111108G Inservice Inspection Activities - BWR Comments:

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.