ML17055B139

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-410/85-42 on 851112-15 & 1204 & Notice of Violation
ML17055B139
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 01/22/1986
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hooten B
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17055B140 List:
References
NUDOCS 8601270153
Download: ML17055B139 (4)


See also: IR 05000410/1985042

Text

Docket No.

50-410

4AlII gp 1986

Niagara

Mohawk Power Corporation

ATTN:

Mr. B.

G.

Hooten

Executive Director

Nuclear Operations

c/o Miss Catherine

R. Seibert

300 Erie Boulevard,

West

Syracuse,

New York

13202

Gentlemen:

Subject:

Inspection

Report

No. 50-410/85-42

This refers to the routine safety inspection

conducted

by Mr. Ralph Paolino of

this office on November 12-15,

and

on December

4,

1985 at the Nine Mile Point

Nuclear Station

gnit 2 located at Scriba,

New York of activities authorized

by

NRC License

No

~

CPPR-112

and to the discussions

of our findings held by

Mr. Paolino with Mr.

C.

Beckham

and other

members of your staff at the conclusion

of the inspection.

Areas

examined during this inspection

are described

in the

NRC Region I Inspection

Report which is enclosed with this letter.

Within these

areas,

the inspection

consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observations

by the inspector.

Based

on the results of this inspection, it appears

that certain of your activi-

ties were not conducted

in full compliance with NRC requirements,

as set forth

in the Notice of Violation, enclosed

herewith as Appendix A.

This violation

has

been categorized

by severity level in accordance

with the revised

NRC

Enforcement Policy (10 CFR 2, Appendix C) published in the Federal

Register Notice

(49 FR 8583) dated

March 8,

1984.

You are required to respond to this letter and

in preparing your response,

you should follow the instructions in Appendix A.

The responses

directed

by this letter and the accompanying

Notice are not subject

to the clearance

procedures

of the Office of Management

and Budget as required

by the Paperwork

Reduction Act of 1980,

PL 96-511

'our

cooperation with us in this matter is appreciated.

8bP g270

OgOOO4'10

Oi53 Sbpi22

PDR

ADDC5,

8

Sincerely,

OrfSikal 5 Enedag

ue p .,Durr,

Stewar t D. Ebneter,

Director

Divisi on of Reactor

Sa fety

Enclosure:

(1) Appendix A, Notice of Violation

(2)

NRC Inspection

Report

No. 50-410/85-42

OFFICIAL RECORD

COPY

IR NM2 85-42

0001.0.0

01/17/86

~'

-II/

cc w/encl:

Connor 5 Wetterhahn

John

W. Keib, Esquire

D.

Quamme,

NMP-2 Project Director

C.

Beckham,

NMPC QA Manager

T. J. Perkins,

General

Superintendent

R.

B. Abbott, Station Superintendent

Department of Public Service,

State of New York

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

State of New York

bcc w/encl:

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encl)

DRP Section Chief

J. Grant,

DRP

Region. I SLO

c,fq

RI:DRS

RI:DR@

Paolino slf

Anderson

1/6 /86

1/7 /86

RI: DRS

Durr

1//~/86

OFFICIAL RECORD

COPY

IR NM2 85-42

0002.0.0

12/20/85