Forwards Mgt Meeting Rept 50-410/85-09 on 850227 & 0315. Requests Info Re Design Audits Performed to Date on Reactor Controls,Inc.Forthcoming Audit Will Be Monitored at Selected Stages
ML17054B589
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 04/19/1985
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hooten W
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17054B590 List:
References
NUDOCS 8505020137
Download: ML17054B589 (4)


See also: IR 05000410/1985009

Text

4PR 19

1985

Docket No. 50-410

Niagara

Mohawk Power Corporation

ATTN:

Mr. William G.

Hooten

Executive Director

Nuclear Operations

c/o Miss Catherine

R. Seibert

300 Erie Boulevard West

Syracuse,

New York

13202

Gentlemen:

Subject:

Management

Meeting

NRC Report

No. 50-410/85-09

This refers

to

the

meetings

held at

our request

at the

NRC Region

I Office,

King of Prussia,

Pennsylvania,

on February

27,

1985

and March 15,

1985 relating

to activities authorized

by

NRC License

No.

CPPR-112.

These

meetings

were at-

tended

by yourself and other members of your staff and by myself and other

mem-

bers of the

NRC staff.

The subjects

discussed

at these

meetings

are

included

in the

NRC Management

Meeting Report

No. 50-410/85-09.

These meetings

served

as

a forum to discuss

the

scope of the Engineering Assur-

ance audits to be conducted

in the near future at Nine Mile Point, Unit 2.

We

acknowledge

your

plans

to

integrate

the

conduct

of

a

simultaneous

equality

Assurance

audit with your engineering

technical

audit.

Your selection

of the

Reactor

Core Isolation Cooling

System is acceptable

pending our review of your

previously conducted plant system audits.

We request

you submit information regarding

design audits performed to date

on

Reactor

Controls, Inc.,

and additional

copies of the previously conducted tech-

nical audits covering the Residual

Heat Removal,

Service Water and

AC Distribu-

tion systems..

We intend to monitor your forthcoming audit at selected

stages prior to, during

and after the audit.

The discussions

held in regard to the Engineering

Assurance

audit have

been

most

beneficial

and

have resulted

in

a mutually acceptable

audit

approach

for the

forthcoming effort.

Your cooperation with us is appreciated.

Sincerely,

8505020l37

850419

PDR

ADOCK 05000410

'

PDR

Original Signed By!

Samuel

J. Collins, Chief

~ E.O

Project Branch

No.

2

Division of Reactor Projects

OFFICIAL RECORD

COPY

IR50-410/85-09

0001.0. 0

03/28/85

Niagara

Mohawk Power Corporation

APR 19

1S85

Enclosure:

NRC Region I Management

Meeting Report

No. 50-410/85-09

Attachment

1:

Material provided by Niagara

Mohawk Power Corporation at

February

27,

1985 meeting.

Attachment

2:

Material provided by Niagara

Mohawk Power Corporation

March 15,

1985 meeting.

cc w/encls:

Connor

& Wetterhahn

John

W. Keib, Esquire

D.'uamme,

NMP-2 Project Director

C.

Beckham,

NMPC QA Manager

Department of Public Service,

State of New York

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

State of New York

bcc w/encls:

Region I Docket

Room (with concurrences)

Senior Operations Officer (w/o encls)

State

Liaison Officer (SLO)

Director,

DRP

J. Grant

DRP

M. Haughey,

NRR

Director,

DRS

Director,

DRSS

G. Ankrum,

I&E

J. Milhoan,

I&E

RI:

RP

Gramm/mjd

4/~I/85

I:DRP

Linville

4/S /85

gC,

DIES

I

RP

<'</~~

vy~ss

OFFICIAL RECORD

COPY

IR50-410/85"09 - 0002'.0.0

04/05/85

~5'.

1. 4