Text
4PR 19
1985
Docket No. 50-410
Niagara
Mohawk Power Corporation
ATTN:
Mr. William G.
Hooten
Executive Director
Nuclear Operations
c/o Miss Catherine
R. Seibert
300 Erie Boulevard West
Syracuse,
13202
Gentlemen:
Subject:
Management
Meeting
NRC Report
No. 50-410/85-09
This refers
to
the
meetings
held at
our request
at the
NRC Region
I Office,
King of Prussia,
on February
27,
1985
and March 15,
1985 relating
to activities authorized
by
NRC License
No.
CPPR-112.
These
meetings
were at-
tended
by yourself and other members of your staff and by myself and other
mem-
bers of the
NRC staff.
The subjects
discussed
at these
meetings
are
included
in the
NRC Management
Meeting Report
No. 50-410/85-09.
These meetings
served
as
a forum to discuss
the
scope of the Engineering Assur-
ance audits to be conducted
in the near future at Nine Mile Point, Unit 2.
We
acknowledge
your
plans
to
integrate
the
conduct
of
a
simultaneous
equality
Assurance
audit with your engineering
technical
audit.
Your selection
of the
Reactor
Core Isolation Cooling
System is acceptable
pending our review of your
previously conducted plant system audits.
We request
you submit information regarding
design audits performed to date
on
Reactor
Controls, Inc.,
and additional
copies of the previously conducted tech-
nical audits covering the Residual
Heat Removal,
Service Water and
AC Distribu-
tion systems..
We intend to monitor your forthcoming audit at selected
stages prior to, during
and after the audit.
The discussions
held in regard to the Engineering
Assurance
audit have
been
most
beneficial
and
have resulted
in
a mutually acceptable
audit
approach
for the
forthcoming effort.
Your cooperation with us is appreciated.
Sincerely,
8505020l37
850419
ADOCK 05000410
'
Original Signed By!
Samuel
J. Collins, Chief
~ E.O
Project Branch
No.
2
Division of Reactor Projects
OFFICIAL RECORD
COPY
IR50-410/85-09
0001.0. 0
03/28/85
Niagara
Mohawk Power Corporation
APR 19
1S85
Enclosure:
NRC Region I Management
Meeting Report
No. 50-410/85-09
Attachment
1:
Material provided by Niagara
Mohawk Power Corporation at
February
27,
1985 meeting.
Attachment
2:
Material provided by Niagara
Mohawk Power Corporation
March 15,
1985 meeting.
cc w/encls:
Connor
& Wetterhahn
John
W. Keib, Esquire
D.'uamme,
NMP-2 Project Director
C.
Beckham,
Department of Public Service,
State of New York
Public Document
Room (PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
State of New York
bcc w/encls:
Region I Docket
Room (with concurrences)
Senior Operations Officer (w/o encls)
State
Liaison Officer (SLO)
Director,
J. Grant
M. Haughey,
Director,
Director,
DRSS
G. Ankrum,
I&E
J. Milhoan,
I&E
RI:
Gramm/mjd
4/~I/85
I:DRP
Linville
4/S /85
gC,
DIES
I
<'</~~
vy~ss
OFFICIAL RECORD
COPY
IR50-410/85"09 - 0002'.0.0
04/05/85
~5'.
1. 4