SALP Rept 50-410/85-99 for Oct 1983 - Jan 1985.Util Must Implement Measures to Offset High Levels of Personnel Turnover.Deficiencies Detected Re Primarily Electrical Equipment Supplied by Numerous Vendors
ML17054B564
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 04/17/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML17054B565 List:
References
50-410-85-99, NUDOCS 8504190357
Download: ML17054B564 (96)


See also: IR 05000410/1985099

Text

U.S.

NUCLEAR REGULATORY COMMISSION

REGION I

SYSTEMATIC ASSESSMENT

OF LICENSEE

PERFORMANCE

INSPECTION

REPORT 50-410/85-99

NIAGARA MOHAWK POSER

CORPORA1 IOH

NINE MILE POINT, UNIT 2

ASSESSMENT

PERIOO:

OCTOBER 1,

1983 - JANUARY 31,

1985

BOARO MEETING OATE:

MARCH 28,

1985

IIt1[419I357

850g4

7

PDR

TABLE OF CONTENTS

~Pa

e

I-

INTRODUCTION................;........'.......................

I.

B.

C.

Purpose

and Overvfev..........................

SALP Board Members............................

Background....................................

I. CRITERIA.............................

I

III. SUMMARY OF RESULTS..........................................

IV.

A.

B.

Overall Facility Evaluation...................

Facility Performance..........................

PERFORMANCE ANALYSIS...............................

7

9

10

A.

B.

C.

0.

E.

F.

G.

H.I.

J.

Containment

and other Safety Related Struc

Piping Systems

and Supports...............

Safety Related Components-Mechanical......

Support Systems............'...............

Electrical

Equfpment

and Cables.....

Instrumentation

and Control Systems.......

Lfcensfng Actfvftfes......................

Prospect Management/quality Assurance......

Nondestructive Examfnatfon................

Engfneering...............................

ture5

~ ~ ~

~

~

~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~

~

~

~

~

~ ~ ~ ~ ~ ~ ~ ~ ~

~

~

~

~

~ ~

~ ~ ~ ~ ~ ~ ~

~ ~

~

~

10

12

15

17

18

20,

22

25

28

31

V.

SUPPORTING

DATA AND SUMMARIES.................,...........,.

A.

B.

C.

0.

TABLES

Investigations

and Allegatfons Revfev...

Escalated

Enforcement Actions...........

Management Conferences..................

Construction Deficiency Reports

(CORs)..

34

35

35

36

TABLE 1 - CONSTRUCTION DEFICIENCY REPORTS........

TABLE 2 " INSPECTION

HOURS SUMMARY.......,...,.....

TABLE 3

ENFORCEMENT DATA........................

TABLE 4 " INSPECTION

REPORT ACTIVITIES............

TABLE 5 - NRR SUPPORTING DATA......................

37'8

39

43

46

l '

I.

INTROOUCTION

A.

Pur ose

and Overview

The Systematic

Assessment

of Licensee

Performance

{SALP) is an inte-

grated

NRC staff effort to collect the available

observations

and

data

on

a periodic basis

and to evaluate

licensee

performance

based

upon this

information.

SALP is

supplemental

to

normal

regulatory

processes

used

to ensure

compliance

to

NRC rules

and

regulations.

SALP is intended

to be sufficiently diagnostic to provide- a rational

basis for allocating

NRC resources

and to provide meaningful

guidance

to the licensee's

management

to promote quality and safety of plant

construction

and operation.

A NRC

SALP Board,

composed of the staff members listed below,

met on

Harch

28,

1985 to review the collection of performance

observations

and data to assess

the licensee

performance

in accordance

with the

guidance in NRC Hanual Chapter

0516, "Systematic

Assessment

of Licen-

see Performance."

A summary of the guidance

and evaluation criteria

is provided in Section II of this repor't.

B.

SALP Board

Board Chairman

R.

V.

Starostecki,

Director,

Oivision

of

Reactor

Projects

(ORP)

Members

S. J. Collins, Chief, Projects

Branch No. 2,

ORP

J. P. Ourr, Chief, Engineering Branch, Oivision of Reactor Safety

(ORS)

R. A. Gramm, Senior Resident Inspector,

Nine Hile Point Unit 2

J. Linville, Chief, Projects

Section

No.

2C,

ORP

A. Schwencer,

Chief, Licensing

Branch

2, Office of Nuclear

Reactor

Regulation

C.

~Back round

1.

Licensee Activitives

The licensee

has

stated

the project is 85~ complete.

Construc-

tion installation activities

have

included

small

and

large

bore

piping

and

supports;

raceway

installation,

cable

pul1ing,

and

cable

terminations;

and

instrumentation

tubing

and

supports.

The installation of concrete

and structural

steel

is essentially

complete.

Equipment

has

been

released

to the Startup

and

Test

organization

to support

the pre-operational

test

schedule.

The

site

work force

as

of January

was

7200

manual

and

non-manual

personnel.

Approximately

650 of those

personnel

perform

QA or

QC functions.

n

II

I

Ouring the course of the assessment

period, the Nine Mile point,

Unit 2 project

has

passed

through

several distinct phases.

The

Construction

Appraisal

Team

(CAT) inspection

was

conducted

in

November

and

Oecember,

1983.

That inspection effort identified

far ranging deficiencies

in the application of QA programs

on-

site

and

an

inadequate

level of Niagara

Hohawk project involve-

ment.

The project then entered into the second

phase,

CAT prob-

. lem resolution.

The

CAT identified deficiencies

were analyzed

at great length by the licensee

in order that suitable correc-

tive action

plans

could

be

developed.

During this phase,

the

licensee

realized

that

not only

woUld

hardware

and

software

issues

need

to be rectified, but that additionally,

new manage-

ment practices

would have to be

implemented

to

see

the project

throu 'o successful

completion.

The

HRC '.hen formally commun-

ica'>>e

CAT deficiencies

to the

licensee

in the

form of

a

Notii

Violation and simultaneously

mandated that the licen-

see i ~q

'nt additional actions in response

to an Order.

- ';y

'..

.~34,

the bulk of the

CAT corrective

actions

had

been

ir'iiated

at

the

project.

The

Region'

NOE

Van

inspection

began

the third

phase,

being

the verification of corrective

action

implementation.

Th~t inspection

showed

steps initiated

to resolve

the radiography

problems

had not fully resolved

the

CAT concerns.

The

van

inspection

prompted

further

extensive

licensee

actions

in the

form of complete

reinterpretations

of

all ITT Grinnell radiography film.

Late in the assessment

per-

iod,

a Region I Construction

Team Inspection

was performed.

The

inspection

covered

plant

installation/<nspection

activities

involving representative

plant hardware.

- Ho significant defic-

iencies'ere

identified regarding

the application of site qual-

ity programs.

Over the course of the

assessment

period,

the licensee

has also

implemented

corrective

actions

with the specific

goal

of in-

creasing

the overall plant quality.

The licensee

is performing

increased

surveillances/audits

of contractor

performance

partic-'ularly

as it relates

to hardware quality.

The licensee

QA or-

ganization

performs

an on-going

review of inspection

procedures

to

assure

adequate

accept/reject

criteria definition

and

in-

depth

assessments

have

been

performed of the contractor

QA or-

ganizations.

The licensee

has instituted

a complete

management

reorganization

at both corporate

and site levels.

The licensee

has retained

Management Analysis Company

(MAC) to provide nuclear experienced

personnel

to fill both project

and quality assurance

positions.

The licensee

has significantly improved their control of site

activities by locating project management

on-site

and by modify-

ing the line organization

such that the Stone

and Webster Engi-

neering

Corporation

(SWEC) Project

management

reports directly

to the licensee.

New QA management

has

been brought on-site for

SWEC and the sub-contractor

organizations.

An. IHPO construction

audit was performed

between

September

and

October,

1984.

Site

programs

in the

area

of design

control,

material

storage,

gA program effectiveness,

equipment qualifica-

tion, and test activities were reviewed.

Ho preoperational'tests

have

been

conducted

to date.

The Reac-

tor Coolant System hydrostatic test is scheduled for April 1985.

2.

Ins ection Activities

During the

16 month as

essment

period,

a total of 25

o'nsite

HRC

inspections

involving 5408 inspector hours (or 4055 hours0.0469 days <br />1.126 hours <br />0.0067 weeks <br />0.00154 months <br />

on

an

annual basis)

were conducted with a distributio; in the apprais"

al functional areas

shown in Table 2.

The site

has

been

staffed

with a construction resident

inspector during the entire assess-

ment period and

a second

construction

inspector

was assigned

in

October

1984.

An additional

senior resident

inspector

was de-

tailed

on part-time

basis

to monitor the

pre-operational

test

program.

A CAT inspection

was

conducted

in November

and

Oecember

1983.

The inspection ide'ntified numerous

hardware

and software defic-

iencies.

The

implication of the

identified deficiencies

was

that the site

had suffered

a

gA program

breakdown

and that in-

adequate

licensee

management

attention

had

been

focused

on the

site problems.

The

inspection

resulted

in the

issuance

of

an

Enforcement Action comprised of a Notice of Violation, an 0~der

and, a Civil Penalty.

Following the

CAT inspection

an

Augmented

Inspection

Program

was initiated at

the site

by

Region I.

As

part

of

this

program,

other

Region

I

senior

construction

resident

inspectors

were

detailed

to

the

site

for one

month

tours

to

gain

additional

perspectives

regarding

the

project

quality status.

As

a

followup to

the

CAT,

a Nondestructive

Examination

(NOE)

Region

I inspection

was

performed

in April -

Hay,

1984,

The

inspection

detected

further

problems

with the site

review of

radiographic film.

In order

to

gain

additional

perspective

regarding

the effec-

tiveness of licensee corrective actions following implementation

of

- CAT corrective

actions,

a

Region

I Construction

Team

In-

'pection

(CTI) was

conducted

in December

1984.

The inspection

examined

prospect

management,

quality assurance/control

programs,

and installed

hardware.

In general,

the

inspection

found the

hardware installations to be in accordance

with design

require-

ments

and

detected

improved levels .of management

involvement.

In early

1985,

an

inspection

reviewed

the

preoperational

test

staffing

and

procedural

controls.

They were

found to be ade-

quate

to

support

the

forthcoming

preoperational

test effort.

Tables

3 and 4 provide a synopsis of enforcement

data

and inspec-

tion activities conducted during the appraisal

period.

II'

~

~

2

{ \\I

d. ~

I

~

~'o%~,

~

2

II.

CRITERIA

'icenseeperformance

i s assessed

in selected

functional

areas,

depending

on whether the facility is in a construction,

preoperational,

or operating

phase.

Each

functional

area

normally

represents

areas

significant

to

nuclear

safety

and

the

environment,

and

are

normal

programmatic

areas.

Special

areas

may be added to highlight significant observations.

One or more of the following evaluation criteria were used to assess

each

functional area.

1.

Hanagement

involvement and control in assuring quality

2.

Approach to resolution of'echnical

issues

From

a safety standpoint

3.

Responsiveness

to

NRC initiatives

4.

Enforcement history

5.

Reporting

and analysis of reportable

events

6.

Staffing (including management)

7..

Training effectiveness

and qualification

Based

.upon

the

SALP

Board

assessment

each

functional

area

evaluated

is

classified into one of three

performance

categories.

The definitions of

these

performance

categories

are:

~dl. Rd

dRRC

I

2

I

.

U

attention

and

involvement

are

aggressive

and

oriented

toward

nuclear

safety;

licensee

resources

are

ample

and effectively used

so that

a high

level of performance with respect to operational

safety or construction is

being achieved.

2~2.

IIRC

U

h

Idh

I

I

d

11

1.

U

management

attention

and

involvement

are

evident

and

are

concerned

with

nuclear

safety;

licensee

resources

are

adequate

and

reasonably

effective

so that satisfactory

performance

with respect

to operational

safety

or

construction is being achieved.

~CR.

2

h

IIC

d<> .

cate installations correctly- rather

than relying on gA/gC to detect

deficiencies.

Because o'ifficulties experienced

in retaining qualified personnel,

it is necessary

for the site

to

implement

measures

to offset high

levels of personnel

turn'over.

Increased

supervisory oversight of job

performance

and

augmented

training to quality requirements

appear to

be needed.

Project management

attention is necessary

to ensure

that

trained,

qualified craft

and quality

inspectors

are

available

to

support project schedules

without impacting hardware quality.

~

Hardware reinspection

programs

have been established

to determine

the

adequacy

of in situ installations.

The

NRC has

been

presented

with

the interim findings of those efforts,

and the engineering

analysis

associated

with the noted deficiencies.

While the licensee

analysis

shows thai

most

concerns

are

acceptable-as-is,

the

impact

of

the

findings

on

a determination

of overall

hardware quality remains

to

be provided.

Def)ciencies

have

been

detected

which involve primarily electrical

equipment

supplied

by

numerous

vendors.

The'roblems

indicate that

the

source

inspection activity was

not properly

performed

and

has

allowed

sub-standard

equipment

onsite.

Measures

are

required

to

assure

the

acceptability

of

these

components

and

to

address

the

extent of vendor equipment deficiencies.

In

some

instances

site initiated corrective action programs

have not

been totally implemented,

in that

long term actions

have

not always

been effective. This may result

from the lack of a comprehensive

site

commitment tracking

system

to monitor

and

assess

corrective

action

effectiveness.

'

Review of design

change

documents

indicates

that greater

attention

needs

to be paid to assuring

the clarity and technical acceptability

of the design

changes.

Further attention is required to verify that

licensing

comaitments

relative to component

gA level classification

are accurately translated to the site design

documents.

Better

com-

munication is needed

between engineering

and quality personnel

during

the development of inspection plans.

~

A high level of'anagement

attention is nov required to resolve the

outstanding

HRC deficiencies

and to assure

complete

licensee verif-

ication

and timely closeout.

To support

the

licensee

schedule

for

plant licensing,

the

pace of deficiency closeout

must rapidly accel-

erate.

t j

B.

Facilit

Performance

Functional

Area

Category

Last

Period

Category

This

Recent

Periad

Tren4

(10"1-82 - 9"30-83) (10-1"83 - '1"31"85)

A.

Containment

and other Safety

Related Structures

B.

Piping Systems

and Supports

C.

Safety Related

Components-

Hechanical

0.

Support Systems

E.

Electrical

Equipment

and Cables

F.

Instrumentation

and Control

. Systems

G.

Licensing Activities

H.

Project Hanagement/quality

Assurance

I.

Nondestructive

Examination

J.

Engineering

3

2

Not Assessed

2

2

Not Assessed

Not Assessed

Consistent

Improving

Consistent

Consistent

Consistent

Consistent

Consistent

Improving

Improving

Improving

10

IV.

PERFORMANCE ANALYSIS

A.

Containment

and Other Safet

Related Structures

(15%)

1.

A~naI

sss

The

1 fcensee

has

essentially

completed

the

fnstal 1 atfon

of

structural

steel

and structural

concrete.

Inspection activity has

examined structural

steel installations;

hfgh strength

bolting;

concrete

placement;

structural

welding

and 'welder qualifications;

revetment

ditch installation;

con-

crete anchor bolts; and the reactor building enclosure.

Ourfng the previous

SALP period,

AISC high strength bolting crf-

teria were not properly implemented onsfte.

Inspections

have

fdentfffed

additional

examples

involving

Quality

Control

(QC)

acceptance

of structural

steel

bolted

connections

that violate

AISC acceptance

criteria.

Overall

QC

adherence

to

inspection

procedures

has

not

assured

the

com-

pliance of installed

beam connections vfth AISC criteria.

NRC

examination of connections

accepted

by

SWEC

QC within primary

containment

indicated

the presence

of oversized

hole geometries

for which hardened plate washers

were not appropriately

pro'vfded.

Further,

NRC examination of the Control

Rod Orfve Restraint

Beam

identified that

Reactor

Controls

Inc.

(RCI) personnel.

had not

erected

and

inspected

the

beam

connections

consistent

with

guiding AISC criteria since

requested

hardened

vashers

were not

used.

While the specific

hardware

installations

questioned

by

the

NRC

have,

been

addressed,

further

licensee

verification

measures

are

necessary

to establish

the

adequacy

of structural

steel

'connectfons.

More vigorous final

QC turnover inspections

are necessary

to address

the problem.

Vendor

QC and

SWEC Procurement

Quality Assurance

(PQA) programs

for structural

veld

inspections

have

not

been

appropriately

implemented

since

the

NRC

identified

undersized

Gives

shop

welds.

The

licensee

has instituted

a sampling

reinspection

of

Cives

veldments

to identify the

extent

of

the

deficiencies.

Engineering

has

analyzed

the identified deficiencies

and

found

them to be acceptable,

however,

the third party

assessment

has

recommended

further re-inspection

efforts to resolve this

con-'ern.

Further

examples

of

inadequate

source

inspection

are

discussed

fn functional areas

C and

E.

Licensee

activities

during

inspections

of concrete

pours

and

structural

steel

welds

made

onsite

were

observed

to

be

acceptable.

I

11

2.

Conclusion

Category 2, Consistent.

3.

Board Recommendation

NRC

'

~

Reduce

level of inspection

consistent

with level of licen-

see work'ctivities.

~

Monitor licensee

resolution

of AISC bolting deficiencies

(85-99-01).

~

Monitor licensee

resolution of inadequate

Cives

shop welds

(85-99-02).

Ucensee

~

Investigate

necessity

to perform

more vigorous structural

steel final

(}C turnover inspections.

~

Determine acceptability of Cives

shop weldments.

12

B.

Pi in

S stems

and

Su

orts (2')

1.'Ana'l sls

During the previous

SALP period,

concerns

were identified re-

garding

inadequate

review of ITT-Grinnel1

(ITT) work planner

packages.

The

licensee

has

implemented

effective measures'n

response

to those

concerns

as

no further

problems

have

been

detected with deficient planner packages.

Major activity has

proceeded

on the installation of large

and

small

bore piping and the associated

supports.

Safety related,

flushing

and hydrostatic tests

have

been performed

on completed

piping.

ITT gC inspectors

have

not performed

pipe

support

inspections

in

accordance

with their

documented

procedures.

The

NRC

has

identified instances

in which attributes like clearances,

gaps,

~ hanger

hardware

and welding

have

not

been

properly

inspected.

The

specific deficiencies

nave

been

documented

and

reworked.

In addition,

ITT has instituted

a program to reinspect

welding

and mechanical

attributes

on pipe

supports

that

were

accepted

'y

gC prior to December

1984.

Since inspection

plans

were not

followed, it appears that the inspectors

were not familiar with

the

inspection

requirements.

Given the high rate of,personnel

turnover,

augmented

training and supervisory oversight

programs

are necessary

to ensure

proper inspection conduct.

Of greater

concern

in two instances,

was that the pipe support

inspection plan was deficient since essential

inspection attrib-

utes

were not explicitly identified.

The complexity and length

of typical

engineering

specifications

necessitates

that

all

pertinent inspection attributes

be extracted

such that they are

clearly defined for inspection

personnel.

It is essential

that

gC and engineering

personnel

review the installation specifica-

tion to ensure that all critical attributes

are captured within

the

associated

inspection

plans.

The presence

of an excessive

gap

was identified by

HRC examination of an accepted

pipe

sup-

port

baseplate.

Shims

were

added

behind

the

baseplate,

the-

inspection

plan

was

modified to incorporate

the

necessary

in-

spection attribute,

and

a sampling reinspection

was performed to

insure

compliance 'with

the

engineering

requirements

for

gap

dimensions.

A second

instance

was identified by the

HRC involv-

ing the thread

engagement

of a sp~ing

support

bar which was not

verified by gC.

The inspection

plan

was

amended

to include the

requisite attribute

and

a number of supports

were reinspected

to

ensure

compliance.

'k

'13

Construction

personnel

have not adhered

to quality requirements

during installation activities.

Such deviations

represent

the

potential for adverse

impact upon the quality of installed hard-

ware.

Examinations

of fn-process

work activities

by

the

NRC

identified

an instance

where

a Tee-quencher

base

stand

was not

installed

fn accordance

with engineering directives

and

a hold

point was bypassed

during the erection of pipe whip restraints.

The

lack of process

control

fs attributable

to insufficient

craft supervfsfon of work activities

and inadequate training of

craft personnel

to ensure

that. quality requirements

are clearly

understood.

The Quality

Performance

Management

Program

{QPMP) has

led to

improved acceptance

rates of pipe

and

support

welds.

However,

the acceptance

goals

have not been achieved,

and the reject rate

on repair

welding

remains

excessive '(approximately

40%).

The

licensee

has dedicated

engfneering

and construction

resources

to

study the problem.

Special

qualification tests

were

performed

- for selected

welders.

These highly trained craft personnel left

the

site

after

they

received

the

additional

trainfng.

The

licensee

efforts

appear

to

be

co~prehensive,

but

a

key ingre-

dient required to achieve

the project goals is the retention of

highly qualified individuals '.n both the construction

and quality

areas..

NRC

examinations

of

SPEC

small

bore piping

and

supports

have

found high quality work.

The site machine welding

program

and

welder qualification programs

have

been

performed fn accordance

with the

ASME code.

2.

Conclusion

Category 2, Improvfng.

3.

Board Recommendatfon

HRC

Continue increased

fnspection

coverage.

Monitor repair

welding

effects

on

piping

base

material

(85"99-03).

Monitor licensee

control of in-process

activfties (~5-99-

04).

Monitor

QC

inspection

training

activities

(85-99-05).

14

Ucen see

~

Review

gC inspection

plans

relative

to

engineering cri-

teria.

Increase

craft

supervision

and

gC

surveillance

of in-

process

work activities.

Perform

enhanced

gC inspector training and increase

super-

visory overview.

Continue

management

attention

to

improve acceptability of

large bore melding.

15

C.

Safet

Related

Com onents-Mechanical

(7Z)

l.

~Anal

sos

Plant

components

such

as

pumps,

motors and heat, exchangers

have

been generally installed fn accordance with design requirements.

NRC examination of installed plant components

indicated satis-

factory

QC fnspectfon

for configuration

and

anchorage

attrfb>>

utes.

Major rework of the

Main Steam Isolation Valves was

mon-

itored and found to be well controlled.

The licensee

has

implemented

a strong internal deficiency iden-

tification and reportability system as indicated

by the four 10 CFR 50.55(e)

reports

that

have

been

made

regarding

inadequate

material certificatfons for valve bodies.

Further deficiencies

in source

inspection activities were iden-

tified by the

NRC involving a Service Vater Strainer shipped to

the site with inadequate

top bolt thread

engagement.

General

Electric

(GE) had

shipped

a motor with an incorrect voltage ra-

ting to the site.

Vendor

QC

and

SPEC

PQA did not detect

the

nonconformances,

and

the site recefpt

inspectfon

is only per

formed to detect

equipment

damage

in transit.

Additional site

overview

of

equipment

source

inspection

characteristics

is

necessary

to provide assurance

of hardware

adequacy.

Ouring the previous

SALP, co .cerns were identified with the Pre-

ventive

Maintenance

(PH)

program

implementation.

Ouring

the

current assessment,

there were continuing concerns

involving the

transfer

of

an

instrument

rack from

SPEC to Johnson

Controls

Inc. (JCI), during which the appropriate

PH requirements

were

not implemented fn a timely manner.

Ineffective coordination of

actions

taken

by the

varfous

groups

fnvolved in the

equfpment

transfer

was

apparent.

Sufficient interface controls

were not

imposed to ensure continuity of PM measures.

The

NRC also

found

that

the

warehouse

Level

A storage

levels were not maintained

and that the

RPV in place

PH requirements

were not met.

A re-

cent

inspection

identfffed

standing

water within

a

heat

ex-

changer

and particulate contamination of various

systems.

Mhfle

the

observed

deficiencies

apparently

have

not resulted

in the

damage

to any equfpment,

the

PH program

has

not

been effectfve.

Greater

management

attention

is required

to

assure

that plant

equipment is properly maintained during the construction

phases.

16

2.

Conclusion

Category 1, Consistent.

3.

Board Recommendatfons

HRC

~

Monitor Preventive Maintenance

Program {85-99-06).

Licensee

Mafntafn high level of management

attention for Preventive

Mafntenance

Program.

Increase

site verfffcation of vendor

fnspected

equipment

characteristics.

I

17

D. ~SS

taRt

l.

~Ana1

sos

The

Support

Systems

area

includes

Heating Ventilation

and Afr

Conditionfng (HVAC), fire protection,

radvaste

and fuel storage

and handling.

Ho vfolatfons vere identified during

NRC inspec-

tions.

The

HRC inspection

program

has

found that installed, HVAC hard-

vare fs fn conformance vfth the design

requirements.

Satisfac-

tory licensee overvfev has ensured

high quality results

from the

HVAC Contractor,

Schnefder

Pover Corporatfon

(SPC).

inspection

further shoved that

FSAR commitments for fire protection

system

pfpfng and supports

vas satisfactorily

implemented at the sfte.

SPEC

gC inspectors

devfated

from th'efr gA program by 'using hand

sketches

to conduct

some

gC

inspections.

The

inspectors

had

,transcribed

data from design documents to a hand sketch

fn order

to carry a single piece of paper to the field.

That process

can

result

fn improper

gC acceptance

of field hardware.

Mhfle the

practice

vas

smmedfately

halted,

the

extent

to vhich ft vas

employed remains

under licensee investigation.

2.

Conclusion

Category

1, Consistent.

3.

Board Recomeendatfon

NRC

~

Continue Routine Inspection.

~

Schedule timely Appendix

R plant revfev (85-99-07).

Licensee

~

Determine

extent

to which

hand

sketches

were relied

upon

to perform inspections.

~

peg

~'l

~

E.

Electrfcal

E uf ment and Cables (11")

l.

Annal

sos

Construction actfvity has

remafned

high.

Raceway installation

of tray

and

conduit

continued.

Large

amounts

of cable

were

pulled and terminated.

Equipment

has

been

energized

to support

the test program efforts.

Early fn the assessment

perfod, deficiencies

were identified fn

electrical

gC

inspection

plans.

Functional

area

8 describes

other

NRC identified concerns relative to inspection

plan ade-

quacy.

Cable separation crfterfa were

not met

and

the

gC in-

spection

plans

dfd not provide sufficient guidance

for items

such as equipment bolting and raceway identification.

The spec-

ific deficiencies

were re-inspected

and

reworked as appropriate

and the inspection

plans were

amended to incorporate

the

missing'ttrfbutes.

Hore recently,

an additional electrical

separation

problem vas

fdentfffed involving conduit

runs that

violated

the

one

inch

separation criteria of Regulatory Guide 1.75.

Fourteen

of fifteen

10 CFR 50.55{e) reports

in this area

were

caused

by off-site deficiencies.

Several

pieces

of electrical

equipment

contafned deficient vendor internal wfrfng.

The scope

of the vendor w'ring deficiencies

appears

to be generic

to all

site electrical

equipment.

The

SPEC

Procurement

gualfty Assur

ance function dfd not effectively ensure

proper

vendor

perform-

ance.

Additional

source

inspection

deficiencies

are discussed

fn functfonal

areas

A and

C.

All of the

equipment

has

been

delivered

making ft a site

problem to resolve.

A program

has

yet to be developed to guide the refnspectfon

of vendor wiring.

It should

be noted that a'arge

number of these

problems

arose

prfor to this assessment

period as

a result of previous

manage-

ment programs.

Interviews of sfte

gC personnel

have

indicated

thaa

a typical

work week is

on the order of

70 to

80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />.

Given that

the

electrical

inspection

function uses

a relatively complex set of

inspectfon criterfa, the excessive

hours could impair inspector

performance.

Supervisory

overview

of

inspection

conduct

is

encouraged

to assure

acceptable

inspection.

2.

Conclusion

Category 3, Consistent,

19

3.

.Board Recommendations

. NRC

~

Honitor inspection

to

ensure

schedular

pressures

do not

degrade

inspection effort (85-99-08).

~

Review licensee

remedial

actions to rectify vendor defic-

iencies (85-99-09).

Licensee

Assess quality levels of vendor supplied equipment internal

siring.

Assure

adequate

gC staffing

to

accoaeodate

construction

schedules.

'I

(ia(

'

~

J

al ~

,'

~

I

h'

C, ~ g

I

I

~

p

~ ~

20

'L"

~

~

F.

Instrumentatfon

and Control

S stems

(5X)

l. 'Anal sls

The

pace

of construction

activity

has been'igh.

Instrument

tubing and supports installation are complete at many locations.

Instrument

racks

and

transducers

have

been

installed

fn

the

plant;

Early fn the assessment,

viring separation

problems

were

iden"

tiffed throughout the

PGCC panels.

The entire

Power Generation

Control

Complex

(PGCC)

vas

inspected

by

GE and

SPEC personnel

to identify all locations

of electrical

separation

problems.

The

inspection

plans

have

been modified to require clear docu-

mentation that the wiring complies with Regulatory Guide 1.75 or

that the compliance vill be obtained at a later date through the

installation

of barriers.

Additional

concerns

regarding

the

acceptability

of

the

PGCC

internal

viring. with

respect

to

terminations

and

harness

supports,

and lack-of as-built veri-

fication were identified during

NRC inspections.

The

equipment

release

for the

PGCC vas

reviewed.

The release

was allowed to proceed

even though it was deficfent with respect

to 'attributes

which gA had previously documented

as problems

on

an earlier

release.

The

PGCC

release

involved

an

extensive

number of open

work items,

for which construction efforts are

continuing. It appeared that the

PGCC milestone completion date

was the motivating force behind the release

in lieu of quality

and work control considerations.

Conscious

licensee

management

decisions

allowed the

PGCC instal"

lations activities to proceed

fn a manner that vas not compat-

ible with the

achievement

.of quality goals.

These'ecisions

vere

made prior to or early in the assessment

period and further

evidence

of these

types of decision

making

processes

have

not

been

observed

during

the

remainder

of the

assessment

period.

Oamage to installed

and .accepted

instrument

tubing

was detected

by the NRC,at

numerous

locations.

Physical barriers

have since

been

erected

to protect the tubing

and instrument

racks.

Site

warnings

have

been transmitted

to the craftsmen

regarding

pre"

cautions

required to protect

the installed tubing.

The licensee

efforts to address

this

problem originally were

inadequate

to

fully correct the observed

problems

until

NRC fi'ndings prompted

more extensive corrective actions,

Increased

management

oversfght

'is

required

to

ensure

that

adequate

corrective

act'~ns

are

implemented in response

to

NRC identified concerns.

'1

21

HgC review of licensee

performance of instrument tubing instal-

lation,

support

material traceability,.review of JCl

QA proce-

dures,

and

mounting of two instrument

racks

was satisfactory.

2.

Conclusion

Category 2, Consistent.

3.

Board Recommendation

HRC

Arrange for management

meeting to discuss

actions taken to

resolve

PGCC problems (85-99-10).

Licensee

Prepare

summary

of

actions

implemented

to

resolve

PGCC

wiring deficiencies.

Continue

to monitor

tubing

damage

and institute further

controls as necessary

to preclude additional

damage.

'r

~

~ ~

p

22

G.

Lfcensfn

Activftfes

I.

~Anal sls

The applfcant's

performance

was

assessed

wfth regards

to the

responses

to staff requests

for information during safety

and

envfronmental

revfews,

responses

to outstanding

and confirmatory

issues

fn the Draft Safety Evaluation Report {DSER), comments to

the Draft Environmental

Statement

(OES),

and

assessment

of the

Safeguards

licensing area.

Ourfng

the

assessment

perfod,

the

management

of

NMPC

was in-

volved

fn

many

phases

of licensing activity.

Decision

making

was usually at

a level that insured adequate

management

review.

However, there were

some areas,

as

noted

below,

where

increased

management

attention

was considered

necessary

during the assess-

ment period.

The applicant

was

requested

to resolve design differences

detected

during the review of the lnstrumentatfon

and Con-

trol (IEC) area

where the

FSAR did not agree

to the plant

drawings.

The applicant

was requested

to verify the verbatim incor-

poration of staff

revfewed

technfcal

responses

into

the

FSAR following NRC detection of an instance

fn which this

had not been

done

as agreed.

Based

on applicant

responses

to the

DSER

and

DES it was

determfned

that the

FSAR and

ihe Environmental

Report

(ER)

dfd not adequately reflect the correct situation, requiring

resolution;

The applicant's

management

and staff

have

demonstrated

sound

technical

understandfng

of issues

involving licensing

actions.

Technical

expertise

has

been

evident.

The applicant's

commit-

ments

have

reflected

a conservatfve

approach,

particularly

in

the

ffre protection

area,

to

provide

for adequate

level

of

safety.

When the applicant

has

deviated

from staff guidance,

sufficient

technical

Justification

has

generally

been

provided to support

such deviations.

Within the

area

of geology,

the applicant's

technical

approaches

were not always complete,

and extensive

NRC

staff effort was requfred to elicit the licensee's

relevant data

and analysis

needed

to reach resolution of problem areas.

a'

23

~

Ws

The applicant

has extended. the break exclusion

zone for the Re-

actor Mater. Cleanup

(RWCU) lines to a valve located over 50 feet

from .the containment boundary.

The HRC staff has fndfcated that

the break exc1usfon extension is not consistent with the intent

'of. the Standard

Review Plan

(SRP).

The HRC staff has requested

that the applicant review the effects of a postulated

break at

the Junction of the iMU line for pipe vhfp and get impingement

considerations.

The

HRC staff has detected discrepancies

betveen

the applicant's

response

to separation criteria concerns

resulting from HRR in-

quiries and to the Construction Appraisal

Team (CAT) inspection.

NRR ts presently coordinating with the Region I inspection per

sonnel

to ensure

a consistent

review of electrical

separatfon

commitments

and fmplementatfon of those

commitments at the site.

The applicant

has

taken

the initiative fn the correction of a

number of technical

problems.

The Hain

Steam

Isolation

Valve

(NSIV) body interior surfaces.

have

been

clad with a corrosion

resistant alloy.

The modfficatfon vas fnitfated fn response

to

corrosion

concerns

identiffed at

the

Lfebstadt,

Svftzerland

plant during preoperational

testing.

There

has

been

a high level of licensing activity to support,

issuance

of responses

to the

HRC staff as

a result of FSAR and

ER docketfng;

responses

to open

and conffrmatory issues

of the

DSER; and comments to the OES.

The

ma)or licensing activity has

been

fn the safety

area.

A

number of responses

vere not received

fn

a timely manner which

adversely

impacted

the

lfcensfng

schedu1e.

The

responses

to

OSER outstanding

issues

in the

Containment

Systems

area

were

particularly late.

A number

of the

formal

responses

fn the

areas of Power Systems,

Geology,

and Procedures

vere lacking fn

thoroughness,

depth,

or vere significantly different from the

proposed

responses

dfscussed

during

meetings

or

conference

calls.

Compared vith experience

on other'cases,

these

submit"

tais required more than the normally expected

number of re-sub>>

missions

to obtain

acceptable

resolutions.

The applicant

vas

additionally not responsive

to

NRC requests

to perform,a

review

of the

OSER,

FSAR and the actual

p1ant design for the Instrumen-

tation

and Control area.

Follovfng management

discussions

be-

tween

the

NRC and applicant,

the responsiveness

vas

improved in

the latter stages

of the assessment

period.

The staff conducted

several

audits at the plant site,

the appli-

cant'

corporate

offices

or

the Archftect/Eng

1 neer '

offfees.

The applicant provided sufficient support for the audits.

The

information provided by the applicant at the audits

was gener-

ally complete

and thorough.

h

Pt

The

NRR evaluation of plant staffing is still fn process.

The

Security

Organfzatfon

positions

and responsibilities

are veil

defined.

The planned

security staff fs considered

to

be

more

than ample to fmplement the facility protection program.

The 'safeguards

licensing

reviev indicated

consistent

evidence

of management

planning.

Responses

from the applicant vere tech-

nfcally sound.

Tfmely resolution

vas

obtained

to staff con-

cerns.

The

guard qualification

and training

program,

as

pro-

posed,

vas satisfactory.

The

HRR evaluation of the description of the applicant's train-

ing

program

discussed

fn

the

FSAR

indicated

no

outstanding

shortcomings.

2.

Conclusion

Category 2, Consistent.

3.

Board Recommendatfon

NRC

~

Give partfcula; attention to timely issuance

of the Tech-

nfcal Speckifcatfons.

Licensee

~

Prior to fnftfal lfcensfng,

the

applicant

should

assure

full consistency

and completeness

among the as-built plant,

the

FSAR, the

SERs and the Technical Specifications.

25

H.

Pro ect Mana ement/ ualit

Assurance

(16%)

l.

~Aaa1 sls

Extensive

changes

have

been

implemented

to improve the licensee

management

control

of site

activities.

Hanagement

Analysts

Company (NC) has

been

retained

to provide

experienced

manag-

erial

personnel

for NHPC.

Site Quality Assurance

programs

have

been

upgraded.

The project does not currently have

an effective site commitment

list to track prior coaxaitments

for periodic auditing to ensure

that the corrective

actions

are .,indeed

ongoing.

This

has re-

sulted in the identification of several

problems

by the

HRC in

which quality comaitments or corrective actions

have

had inade-

quate

long

term implementation.

Examples

which indicate this

.include recurring excessive

QC reject rates,

inadequate

measures

to preclude further

damage to instrument tubing, and the failure

to train the craft to adhere

to

engineering

directives.

The

third party assessment

found further evidence that the'roject

has difficulty implementing effective corrective actions

in re-

sponse

to deficiencies

identified

by external

organizations,

such as the

HRC.

There

appears

to be

a problem controlling craft personnel

which

is also

discussed

in functional

area

B.

The particular

NRC

identified problems

involved inadequate

control of issued

weld

filler material;

poor primary containment houseclear.ing

and fire

prevention measures;

and unauthorized

construction

rework with-

out

QC .notification.

In these

cases,

prompt steps

were imple-

mented by licensee

management

to correct the problems.

Several

unresolved

concerns

deal

with problems

that resulted

from inadequate

communications

between site organizations.

Poor

feedback

was iCentified between

SPEC

QC supervision

and

the

QC

inspectors.

The

inspectors

requested

clarification of proper

implementation of the

QA procedures,

and the supervisors

did not

properly respond

to the inspector questions.

A lack of control

was observed

between

organizations

making attachments

to struc-

tural

steel

members.

The inspection

status

of the steel is not

always readily available.

The

licensee

organizations,

QA

and

engineering,

have

not yet

reached

agreement

on

the inspection

required

to comply with Regulatory

Guide

1.29.

The

items

in

question

are non-safety

related

items

suspended

over safety ri-

littd equipment.

At this time, only

a

surveillance

inspection

which does

not

appear

to fulfill the licensing

commitments

is

performed

.

k

26

';The

licensee

has

instituted

a

hardware

reinspection

effort.

'ue

to the problems identified with previously

QC accepted

in-

. stallations not in compliance with the engineering design,

sample

. reinspections

were performed to ascertain

the acceptability

of

the field hardware.

Licensee

engineering

has

reviewed the data

and determined the majority of the problems

are not detrimental

with the exception of mechanical

fastener

problems.

The assur-

ance

must be gained

by the

HRC that sufficient licensee

rein-

spection activity has

been

performed to detect the worst case

deficiencies,

that

proper

analysis

has

been

performed

on

the

'esultant

data,

and that the current first line inspections

are

properly performed.

Satisfactory

licensee

performance

was observed

during re'view of

the

implementation of the Quality First program,

document

con-

trol activities in the

PGCC area

involving

GE

and

SWEC design

changes,

development

of

HMPC surveillance

program

and detailed

surveillance checklists,

resolution of nonconformance

reports

by

~ engineering,

development of the

new construction

QA program and

infusion of new QA management

personnel.

As noted in section I.C, the licensee

has instituted

a major manage"

ment

reorganization

and

has

implemented

numerous

actions

to

assess

the quality of prev'ously

performed

work'and to ensure

that current installations

meet the quality requirements.

The

licensee

has

developed

a Quality

Performance

Management

Program

(QPMP) which monitors

the quality status

of the site.

Key parameters

such

as quantity installed,

quantity

inspected,

and

QC acceptance

rates

are monitored for construction

hardware

commodities.

The

program

monitors

outstanding

design

changes

and

open

QA deficiency documents.

Trending is performed

on

some

of the documented

nonconforming conditions.

Region l is monit-

oring the utilization of QPMP by the licensee

through management

meetings in conjunction with review of

QPMP data

and attendance

at the licensee

QPMP meetings.

The

QPMP appears

to be function-

ing well as

a management

tool to diagnose

problems

and to assess

the adequacy of corrective actions.

Quality

Control

organizations

have

experienced

a

significant

problem in attracting

and retaining qualified personnel

to keep

pace with the construction effort,

This has resulted

in exten-

sive

use of inspector

overtime which could reduce their effec-

tiveness.

A positive benefit of the

CAT,

?NPO and re-inspection

programs

on the quality staff has

been

that

QC inspectors

indi-

cate

they currently receive

management

support.

Recent

review

indicates that the progect

management

team

appears

to be

func-

tioning well, that significant

program

improvements

have

been

made

and bettor lines of communications

have

been

established.

The

end result

is that

the site

programs

are

able to identify

and resolve pro)oct quality issues.

  • S ~ wW

~

W

I

\\

27

2.

. Conclusion

Category 2, Improving.

Board Recommendation

NRC

A

~

Continue to monitor implementation of gPHP effort (85-99-

11).

~

Evaluate licensee reinspection results (85-99-12).

Monitor adequacy of long term corrective action implementa-

ti'on (85-99-13).

Licensee

~

Use

gPHP as

a dynamic management

tool to identify and trend

quality problems.

Establish

control

over contractor

interfaces

and

develop

confidence

level

of historicai

hardware

in light of

gC

deficienciesi

Ensure

schedular

pressures

do not adversely

impact quality

goal s.

~

Establi sh

effecti ve

site

commi tment

tracking

to

ensure

implementation of long term corrective actions.

Expedite resolution of NRC open

items and provide complete

verification of associated

corrective actions.

~

Resolve'Regulatory

Guide 1.29 inspection issue.

28

I.

Nondestructive

Examination (27K)

A~naI sIs

Nondestructive

fxamination.(HOE) is a new functional area.

Pre-

viously,

NOE was

assessed

in the piping and pipe supports

area.

Ouring the previous

SALP period, there were

concerns

regarding

- ITT, Grinnell (ITT) radiography

operations.

Of particular con-

cern

was that film had

been artificially altered.

Given

the

extensive

inspection effort and significant problems identified

during the current assessment,

NOf vas assigned

a separate

func-

tional category.

In concert with the rapid construction installation pace of pip-

ing and supports,

NOE has

seen .substantial

activity during the

assessment

period.

The first line

HOE is performed

by Reactor

Controls,

Inc. (RCI) on the Recirculation

and

CRO piping.

ITT

performs

NOE on the'emaining safety-related

piping systems.

In

light of the extensive

problems that were previously identified,

this section

covers

the progress

made to date to correct

those

deficiencies.

Early in the assessment,

major deficiencies

were identified in

the

ITT radiography

program.

The deficiencies

included

weld

quality, film quality,

and

inadequate

documentation.

The

over

view of HOE activities by Stone

and webster Engineering Corpora-

tion

(SPEC)

and

Niagara

Hnhavk

Power

Corporation

(HHPC)

vas

inadequate

as

some similar problems

had been identified by site

gA/gC, -yet timely

and effective corrective

actions

were

not

implemented to correct the deficient

HOE programs.

The conclusion

was that

ITT radiographic

interpreters

had not

adequately

evaluated

radiographic

film and

reader

sheets

for

weld quality, film quality and completeness

to assure

compliance

with ASME Section III and

V requirements.

Further problems vere

identified vith unsatisfactory

liquid penetrant

examinations of

stainless

steel piping.

In response

to the identified deficiencies,

numerous corrective

actions

were

implemented

to

enhance

day

to day

NOE operations

and

to

assess

the

adequacy

of previously

examined

hardware:

ITT replaced

their liquid penetrant

technicians

and re-

examined

all

safety

related

liquid

penetrant

inspected

stainless

pressure

boundary weldments.

IP

A"';

Qgg clpt,'

p

~

~

29

g

~

~ P%

~ ~

s

Review of ITT shop

and field radiographic film by ITT/NMPC

HOE personnel

to assure

adequacy of weldments

and

documen-

.tation.

~ ~- " Increased training of ITT radiographers

'-..-. Repair of deficient weldments

Retention of all ITT radiographic film

Assignment of the ITT Level III to the site

Increased

SWEC

and

NMPC surveillance

of

NOE activities

A subsequent

NRC inspection

found that marginal

corrective

ac-

tions

had

been

implemented

by the licensee

in response

to the

radiography

problems.

The

adequacy

of the

ITT and

NMPC file

re-review

was

questioned

as

an unacceptable

transverse

indica-

.tion was found by the

NRC.

A further problem was that Inservice

Inspection

weld preparation

had resulted

.in minimum wall viola-

tions.

The extent of the problem remains under licensee

review.

The. radiographic proble.ns

appear to be attributable,

in part, to

'he fact that there is not a site Level III charged with respon-

sibility for all NOE op~~ations.

The

licensee

subsequently

directed

SPEC

Boston to provide

NOE

personnel

to again

~ e-interpret all ITT film in the vault.

Our

ing the course of the

SPEC film review,

two welds were identi-

fied for which the wrong weld had

been

radiographed

in lieu of

the

designated

weld.

The vault contained

two

sets

of radio-

graphic film marked to indicate two dissimilar weldments

when in

fact only one Joint

had

been

shot twice.

The licensee

identi-

fied a singular radiographer at fault in both cases

but has also

detected

the lack of radiography

procedural

controls.

A sample

re-radiography

program is underway to assess

the

scope of this

construction deficiency.

More recently,

an

inspection

conducted

at the

end of

1984 did

not identify any further problems in the site

NOE programs.

The

inspection identified satisfactory corrective action implementa-

tion for the. outstanding deficiencies,

with the exception of the

duplicate film concern for which licensee

actions

are

underway.

)g +ii~~'(@pi

~

~ e ~, ~

~

+> W

~

~

30

~

~

~

~

2.

3.

Conclusion

I

Category

2,

Improving.

The

licensee,

has

instituted

numerous

program enhancements

over the assessment

period.

\\

Board Recommendation

NRC

~ .

Review corrective actions

in radiography,

particularly the

duplicate film concern (85-99-14).

~ 'valuate

necessity

to schedule

NRC van inspection prior to

OL (85-99"15).,

Licensee

~

Continue aggressive

oversight of NOE activities.

~ ,

Resolve

outstanding

concerns

as ~xpeditiously

as feasible.

~

Evaluate benefits of establishing

site

NOE Level III posi-

tion.-

I

P

>>a ~

I

I! ~

~V <

s

1

a

J.

~EI

I

(5%)

~Ana1

sos

~ .'31

~a

. Engineering

was

not previously assessed

as

a unique functional

'rea.

During the course of both team

and routine resident in-

.'pections,

a substantial effort has

been

expended

in the review

of the design

and design

change

process.

The

SWEC site engineering workforce has greatly expanded to sup-

'port construction efforts;

The rate of design

change

issuance

~

has

remained high.

Engineering activities at the project design

office are tapering off.

Significant areas

of work remain

in

the stress

reconciliation of ASME piping and the resolution of

equipment qualification testing.

Inadequate

control of the

design

change

process

was

a problem

as indicated

by design

change

documents

not completely reviewed

to assure clarity, many design

changes

issued

to revise or cor

rect previously issued

design

documents,

design

changes

not in-

'corporated

into drawings in a ti~ely manner,

and design

change

documents

used

to resolve

nonconformances.

The design

review

process

has

subsequently

been

enhanced.

A trending

process

is

in place to track release

of deficient design

change

documents

.for, correction of root causes.

Site engineers

were retrained

on

the proper use of nonconformance

reports to avoid an inadvertent

bypass

of the

gA program.

Greater

technical

and

management

overview

is

required

of

the

design

change

control

process.

The

NRC has identified plant components

that were not properly

designed

as evidenced

by the identification of the diesel

gener-

ator cranes

and control

room partitions that

had

not

been

de-

signed to seismic standards.

The items were redesigned

to seis-

. mic criteria

and

a total plant

review

has

been

performed

to

assure

that

no further

instances

of that

type

can

exist

in

safety related plant areas.

Fifteen out of sixty-five Construction Deficiency Reports

(CDRs)

were

assessed

to

the

Engineering

area.

The

SPEC

Engineering

Assurance

technical audit identified that the construction

draw-

ings for the

RHR

heat

exchanger

bracing

had

not

been

drawn

according

to the computer analysis

bracing details.

This

i,s

a

significant deficiency

in which the audit process

identified

a

design control

problem which

had direct

hardware

consequences.

Several

of the deficiencies

involved the failure of the design

to accommodate

either hydrodynamic or seismic loadings.

2.

The

HRC has identified'two cases

in which engineering

drawings

have

. not 'roperly

'classi fied

safety-related

structures

as

such.

The engineering misclassification

results

in the lack of

required

gA/gC overview of the

component

during installation.

The particular concerns relate to the Reactor Building roof and

a refueling crane

which was designed

by GE and described

in .the

'SAR

as

a

safety-related

item.

Oue

to

a

design

interface

problem,

SWEC

had

issued

direction

to erect

the

crane

as

a

non-safety

item onsite.

Concerns

were further .identified in the following areas:

ITT

. apparently

did not backfit more stringent

design

requirements

promulgated

in design

cha'nges

against

the

acceptance

criteria

used 'o

previously

accept

hardware

installations;

inadequate

. design control

was enforced over design

interfaces

for

attach-'ents

to structural

steel

to ensure

adequate

beam stiffening;

inadequate

review of field installaQons

was performed

by engi-

neering to assess

the total

scope of the problem prior to issu-

ance

of

a

design

change;

the

licensee

maintained

no

formal

'tracking

mechanism

to ensure

that

the

design

changes

were

in

fact implemented

by

SWEC or GE; design

drawings

had

improperly

incorporated

design

changes;

site engineering

does

no~ correlate

attachment points of small bore support

changes

issued

on ACH's

with the associated

embedment

drawing thus resulting in an inad-

equate

engineering. resolution of a nonconforming condition,

and

some

engineering

personnel

had

not received all

the

required

formal training classes.

In summary, 'the above findings have resulted in a lack of conf)-

dence

in the

design

change

process.

The technical

content of

some design

changes

has

been lacking.

Inconsistencies

have

been

detected

between

FSAR gA requirements

and the site issued design

gA categorization.

Engineering

and

gC personnel

have

not

com-

municated

to ensure

that inspection

plans capture

the requisite

design. verification attributes

as

discussed

within functional

areas.-B

and

E.

To gain confidence

in the engineering

products,

further

design

reviews

in

the

form of Engineering

Assurance

audits,

Technical

FSAR verification,

and

licensee

engineering

overview are necessary.

Conclusion

Category

3, Improving.

3.

Board Recommendation

NRC

~

Honitor

adequacy

of

design

change

documents

(85-99-16).

~

~

i ~

0'

')~g i

" 33

h

~z +

~

.,,,"..

Region I and

IE:.,continue active monitoring of

SWEC Engi-

'..:":'eering Assurance efforts (85-99-17);

Conduct

further inspection

of

FSAR content

versus

design

documents

and monitor FSAR verification process

(85-99-18).

Licensee

.'

P

~

~

~

Examine

implementation

of IE Bulletin requirements

to as-

sure technical resolution of identified problems.

". ~

',

Perform

enhanced verification of drawing incorporation

and

- exercise

greater

technical

oversight of design

change pro-

'-.'.: cess.

.

~

-

Investigate

design

interfaces

to ensure

proper

communica-

tion of component

gA categorization.

.

~ ~ .

Conduct sufficient verification of FSAR commitment transla-

tion to ensure plant is built in accordance vith licensing

commi tments.

~

~

J>>>>>>

~

~

~ I ~

( ed'+>>

p ~

g

" 'o,+g

c

-

~

C'::." V.

P ~

34

~ r

SUPPORTING

DATA 'AND SUMMARIES '

+~.:.

A.

Investf atfons and Alle atfons Revfev

During the assessment

period,

14 allegations

were receIved of which

7 vere unsubstantiated.

The remainder are described belov.

I

~

Three

formal

investigations

vere

conducted

during

the

assessment

period.

The following allegations vere investigated:

Confrontation between

an electrician

and electrical

gC inspector

regarding

PGCC'lectrical

termination

reviews,

remains

under

investigation.'arassment

of

NMPC

gA auditors for identification of quality

concerns,

remains

under investigation.

I

Harassment

of a

gC inspector

by. site engineering,

remains

under

fnvestfgatfon.

Routine

inspection

followuo

was

performed in response

to selected

portions of allegations:

Deficient JCI tubing installations

and other procedural

defic-

iencies.

The licensee

had corrective

actions

fn place in ad-

dress

the

concerns.'MPC

gA lead auditors not properly certified.

Inspection

sub-

stantiated

the validity of the

licensee

audit findings.

The

licensee

reviewed all -lead

auditor

certfffcatfons

and

audit

reports to address deficient certfffcatfons.

Concerns that electrical termination bolting hardware could not

'e verified as silicone bronze.

The hardware

concerns

were not

substantiated.

Hovever,

the

lack of communication

between

gC

supervisors

and

gC inspectors

was apparent.

Alleged

improper electrical

terminations

and bypassed

gC hold-

pofnts.

The licensee fdentfffed instances

fn which terminations

were performed vfthout the requisite

gC inspection

and reported

under

10 CFR 50.55(e).

The licensee

performed reinspections

of

bus

bar

material

to

determine

the

adequacy

of

the

bolting

material.

1

h

\\

I

~

~

\\

4 ~

~

~

'.

~'

j . f

~

I

Audit..findings had

been watered 'down. between

a draft and final

audit report.. The audits in .question

were reviewed

and

a deter-

. mination

made that the;,technical

concerns

had

been fully iden-

. 'tified within the final'report.

In addition the

licensee

sur-,

veillance 'program

had

been totally restructured

to address

the

noted, deficiencies..

-.;" .="-

=:.

A11eged.that

J-bevel

weld preparations

cannot

be

inspected

by

QC;:-".. Determined -that,

QC . was

not

. provided with radius

gauges,

which were. subsequently

'purchased

by ITT and

issued

for use.

.:The machining operation resulted in an out of tolerance J-bevel,

~

. 'hich was found acceptable

by engineering..

'11eged

that'he project director intimidated

a group of ITT QC

inspectors..

The project director

was

counseled

at length

by

NMPC

QA. on

QA organizational

- freedom.

Site

directives

were

issued with regards

to

QA independence.

The

QC inspectors

were

assured

that

no retributions

were. forthcoming,

and

they

subse-

quently stated their concern

was satisfied.

Escalated

Enforcement Actions

1

~

~

~

~ *

~ ~~C

As

a result of a Construction Appraisal

Team

(CAT) inspection

con-

..'ucted in November - December,

1983, which identified extensible

site

quality problems which are discussed

in Section

IV of this report,

an

Enforcement Action (EA) was issued

on March 20,

1984.

The

EA con-

sisted

. of

a

Notice of Violation,

an

Order,

and

a

proposed

Civil

~ Penalty.:,',

C,

. Mana

ement Conferences

In .addition to the

two formal

management

conferences

listed below,

there

were'umerous

discussions

between

NRC

management

and project

management'uring

the assessment

period.'.

February 22,

1984 " A Management

meeting

was held to discuss

the

management

reviews that, had

been

performed

prio~ to the

CAT

inspection.

The planned

licensee

reorganization

was

presented.

Additional discussions

were held with regards to licensee

imple-

mentation of corrective actions in regards

to

CAT and

SALP con-

cerns.

b'.

November

14,

1984

>> A Management

meeting

was

convened

at

NRC

request to review the corrective actions

implemented in response

to

CAT.

The results of the third party

MAC audit were reviewed.

The development of the site Quality Performance

Management

Pro-

gram

was

reviewed.

The licensee

discussed

QA verification ac-

tivities of previously installed hardware relative to the design

documents.

Licensee

actions

to

address

the

site

radiography

deficiencies

was presented.

l

4WI

~

0

k

~

D.

~ufy.>'4 r&~p+~g

'tpQ$Wle".i4~%%~pjg+g

.",'.. "" ~-'-

.* "-'.,

'.,-.'.'6

~

I

I

~

"

I~

~

~

+

~

~

/ +4

~

Construction Oeficienc

Re orts

CDRs

.

Sixty-five. (65)

COR's:were 'eported

by

the

licensee

during

the

assessment

period. - One was'not reportable

according to the licensee.

Numerou's

COR's we'e evaluated at'ength

by NMPC and found to not pose

,adverse-~consequences

'to eventual .plant operations.

However,

since

extensive;efforts 'were

expended.'to

. reach

those

determinations,

the

. reports'-.are 'still classified

as" 10 CFR 50.55(e)

items.

These defic-

'.- ienciesare .listed in Table;1;- and ..were

selectively

evaluated

and

'iscussed

as part'of the appropriate functional area.

Analysis,.'f the

COR's for 'causal

linkage has resulted in the identi-

fication* of the following linked chains:

CORs 84-00-02,: 84-00-06, 84-00-29,.84-00-39,

84-00-49, 84-00-53.

The

denoted

. COR's" apply to the

conduct

of. deficient weld examinations

through. visual

and

NOE.

The subject welds were

found to'e

not in

compliance with, either the applicable 'codes or design criteria.

The

problems are pervasive in nature and'involve both pipe and structural

welding. 'he

root cause

problem

was

a 'failure

on

tne part of the

personnel

involved in welding

and

inspection

to follow applicable

procedures.

CORs 83-00-22, 84-00-'3, 84-00-40.

85-00-03.

The listed

CORs involve

the failure of engineering to adequately

account for the effects of a

seismic design basis event.

CDRs 84-00-14, 84"00"18, 84-00-25, 84"00-31, 84-00-32, 85-00-31. Site

.inspection, of electrical

equipment

has

identified the .failure

of

equipment vendors to properly install the internal wiring. Electrical

separation

violations

and

workmanship

deficiencies

were

involved.

P

~

~

4 ~

'~a

~ ~

y

C.P~~:

+Q a v'~is

,. '

':'.'

B.

',',.'

D.

F.,

g

~.1

A,"

a~. i

C,

E.

V

+ V ~

TABLE I

'A<

CONSTRUCTION DEFICIENCY REPOR

1 /1 83

1 31/8

~

~

~ S

T e'of Deficiencies

'

'.

Personnel Error.......................'.......20

Design Error.'................................20

External Cause................................7

Defective Procedures..........'...'.............2

Component" Failure..'..........;...........-.....14

$

Fabrication Error................;............1

TS

. 'AREA

Containment'nd

Other Safety-Related

Systems

-

~':

Piping Systems

and Supports

Safety-Related

Components-Mechanical

Support Systems

Electrical

Equipment and Cables

Instrumentation

and Control Systems

Licensing Activities

Prospect'anagement/guality

Assurance

Nondestructive

Examination

Engineering

J ~

1

NUMBER/

CAUSE COOE

~TO AL

1/A, 1/F

5/As 3/Cs

4/A, 2/B,

3/E

7/A, 2/B,

2/A, 1/B,

1/0

1/A, 1/0

15/B

/E

9

1/C, 3/E

10

3

2/C, 4/E

15

1/C, 3/E

7

0

1

2

15

e4

CONSTRUCTION DEFICIENCY REPORTS

CORRELATED BY FUNCTIONAL AREA

c4,

P

'ABLE 2

Hours

788

1103

nical

382

234

574

tees

255

rance

896

913

263

~

Total

.

~408

INSPECTION HOVE SUMNARY

1/18

1

18

~

~

~

4 ~ ~

~

. Functional'Area

A.

Containment'and

other Safety-Related

.I.";;,p;

.

".'. Structures.

':...

B;

Piping Systems

and Supports

., C.

. Safety Related

Components-Mecha

0.

Support Systems

E.

. Electrical Equipment.and

Cables

F. 'nstrumentation

and Control Sys

>'.:,-;,,','.:., Licensing Activities

.

-'.

Progect management/ttuality

Assu

I. ,-'Nondestructive

Examination

J.'.

Engineering .. .; '

~ y

'P

X of

Time

20

7

4Il

5

16

27

5

TR

k

l

'f

~ l

)

I ~

~

~

',

>

~

.

~ 8

~

TABLE 3

.;.:.",'j" -'~>>'.: =. ENFORCEHENT 'OAT

1

1/83

I/31/85

t

~ 4<~ t"

'.. Number "and'everit

Level of Violations'.

~

=

Severity Level I

'

0

Severity Level II -'1

Severity Level III

0

Severity Level IV

16

Severity Leve'I

V

5

Oeviation

- "

-

0

~ I

-".. B.

- Violation correlated

b

Functional Area

Severit

Levels

" Functional'Areas

I

A.

Containment'and

other

~ fety related

4

systems

,". B.

Piping systems

and supports

. C.

Safety Related

Components-Hechanical

0.

Support Systems

E.

Electrical, Equipment and Cables

F.

Instrumentation

and Control Systems

G.

Licensing Activities

H.

Prospect

Hanagement/equality

Assurance

1

.;.;"'::, I.

Nondestructive

Examination

!,:,'.;

.J.

Engineering

TOTALS

1R

c

'~ Violation'composed of deficiencies within Areas A-E, H,I and J

I

I

V

V

4

2

1

1

1

4

3

1

2

    • Two Single violations composed of multiple examples within two areas,

total

of 17 Severity Level IV violations actually issued.

I

~ ~ I

' 64+ f gt'

g 4.

O4

'" )

'iV

'II4 44AL

4

I

I

'

~

4f

~

V

Nonconforming support welding

accepted

by quality. control

Deficiencies with conduct of

inspection activities, deficient

radiography

program, lack of

licensee oversight audits,

document control problems.

Final inspected

supports

do

not conform 'to design criteri.a

Inadequate

implementation of

site procedures

for handling of

~ 4I',

4

II

IV

'. po tential construction

deficiency reports

~

~

I

~

~

'r

~

> II ~

~

~

-'C'. "'-~u~arur:.,'.";i';

Inspection,; '. Severity" Functional;.

iolation

3-16

..'V.;

'

8

It

l"

'83-18'I

H

~

7

I

4

I

~ J

~

~

P

84-01'V

B

~ ~

~

~

0

84-02

84-05

'

84-06

4

~

'

~

~

IV

IV

IV

H

Incorrect nonconformance

report

.form is use

. Equipment in Category I plant areas

not, seismically designed.

Veld material not properly

controlled

Post inspection

rework not

controlled for structural

steel

IV

IV

IV

Inadequate

inspection of

structural

steel

connnections

and

of pipe support attachment

thread

engagement

Inadequate

structural

steel

inspection status

system.

Deficient primary containment

housekeeping

and fire prevention

measures

84-08

Radiograph

reader

sheets

did not

document interpretation of linear

indication

Radiograph identified containing

respectable

linear indication

e )3

et

') ~

'

)'

v

o

t

r

)

\\ ~

Inspection

Severity

Functional

'Re art

N'o

.,-

Level:

Area

.

Vlolatloo

3

~

~

~

1 ~": IV

I

I

~

~ .r

Ci

~

\\

C \\~

3)

)

)g~t

~~/

~

~

~

rg<:.'..'.t. '

~~'],

v

L

~

~

'84"09

84-11

84-I3

84-18

'V

IV

IV

IV

IV

V

IV

H

C

B

)

Veld violated minimum wall

thickness

requirements'nadequate

application of

corrective action to lower

trended re3ect rates

Electrical penetration

welds

not properly examined

Nip restraint installation

hold points by-passed

Inadequate

control over

promulgation of design

change

information

Inadequate

thread

engagement

of strainer

top bolts

Failure to maintain control

of field issued weld rod

material

Excessive internal particulate

contamination of piping system

and inadequate

preventive

maintenance

measures

84-19

IV

IV

IV

F

Undersized

welds

on

instrument rack

Excessive

gap behind pipe

support baseplate

Undersized weld on

instrument tubing support

Lack of corrective action

to preclude further damage to

instrument tubing lines

I

e

'Inspectfon .

Severfty 'unctfona1

, '~Re art Mo.

LeveI

Area

= Vfolatfon

Pfpe sUpport fnsta11atfon

not

performed fn accordance

wfth

engfneerfng dfrectfve

r

r

I

e

I

-83-1/31/85

'

"

AREAS

INSPECTED

i ~

Regional:Environmental

protection

program

Regional: Electrical cables,

motor

control centers

and gA records

.-gpg"'-'+ ~$~gQ

I

+

~

~

~ T

43

'

~

~

TABLE 4

'NSPECTIOM

REPORT ACTTVITIES

10-1

N

N

MIL

0

N

UN

'

" " '"INSPECTION:, ~

':,'::;;.",," .'-.;.': REPORT:."

': INSPECTION

.

'UMBER ~ *, 'OURS

-~:. 83-13

14

.

4

83-15 "

28

'I

~

+

~

(

V

~ 83-16

83-17

.

83-18

84-01

84"02

84-03

84-04

84-05

184

166

1920

176

32

28

36

122

Resident:

Equipment turnover,

piping, pipe support, reactor

building enclosure,

CRD piping,

fire protection,

instrumentation

gA program

Resident:

RPV storage,

hydraulic

control unit installation, piping,

. pipe supports,

welder

qualification,. HVAC systems

ICE Hdq CAT inspection: welding,

NOE, electrical, structural/civil,

gA, mechanical

Resident:

pipe supports,

diesel

generator

cranes,

reactor vessel

internals,

gA program

Regional:

Cables,

switchgear

and

gA records

Management

meeting

on licensee

corrective actions for CAT

findings

Regional:

Concrete

anchor bolts

and structural

steel welding

Resident:

Electrical terminations,

piping, pipe supports,

gA

surveillances,

contractor audits,

design control of non-safety

related

items

suspended

over

safety related

equipment

4

V

~

."'-~ -,:.-'; -'... '...:. REPORT

.':-.'f'i>>:;- "':%:!i'NUNBER

84-06

'

~ ~

$

~

~

~

/

84-07

84-08

e

INSPECTION:

HOURS

237

31

662

84-09

179

~ 0

': -":." ':" "'

'

INSPECTION

AREAS

'NSPECTED

Resident: Structural steel,

weld

material control, pipe supports,

housekeeping,

post inspection

.rework control

Regional:

Large and Small bore

pipe supports

Regional:

NDE van inspection of

hSHE and structural veldments

by

independent

examination

Resident:

Corrective action

. programs, electrical penetrations,

pipe whip restraints,

component

supports

kl)~h, ( .

+gal

)j&,.

~ >S:q'.

).

~

~

dr

~ ~

)

~ Y

)

84-10

84-11

84-12

84"13

84-14

84-15

84"16

30

196

Cancelled

114

34

202

Regional: Pre-operational

secur ity

inspection

Resident:

Document control,

containment

supports,

design

change installation,

equipment

preventive maintenance

-'..

- Resident:

Design change control,

revetment ditch, pre-op personnel

.

qualifications, hydrotests,

preventive maintenance,

standby

liquid control system, veld filler

metal control

Regional: welder qualifications,

welding, welding records

Resident:

Electrical cable

separation,

containment

penetrations,

diesel

generator

modifications

Regional:

Radiological Control

staffing

~ a

'

0

4;<%.Table 4"

<<'.-."-',>>;,,"', .... INSPECTION

.

r

-

NUMBER

. ~h,'84

17 c

~

~

(

hr i

84-18

'I

. 84-19

r

h

84-20

\\

~

~yt

t'

~

~r

~ '

t

~

~". "45

r~

INSPECTION

~ HOURS

'30

'07

239

'AREAS

INSPECTED

Regional: Safety related

equipment, installation,

inspection of equipment,

preventive maintenance

Regional: Construction

Team

Inspection,

prospect management,gA,

design control, welding,

NOE,

electrical, mechanical, structural/

, civil

. Resident:

MSIV cladding

operations,

instrument tubing and

support,

small bore pipe supports,

ITT pipe supports,

concrete

expansion

anchors

Management meeting

on licensee

, corrective actions to CAT and site

radiography program

Ih,

~

~

'

J

a /

85-01(draft)'6

Regional: Preoperation

Administra-

tive controls

~ L

'

~

kt

t

~

~ )

46

1018 -1318

I,

r

, ~ +

q \\ ~

,PP

$ q

~

I

TABLE

S'RR

SUPPORTING

DATA

4::-.

1, - HRR-Ucensee'eetin

s

~

~

A large

number. of meetings

were held with the applicant in Bethesda

to

resolve and/or discuss staff concerns.

The meetings

are documented within

meeting summaries.

r'.

NRR Visits and Audits

Structural site visit and audit at Stone 5 webster. design office

Mechanical audit at Stone I Vebster design office

Instrumentation'and

Control visit to General Electric design office

Auxiliary Systems site visit

Reactor

Systems, site visit

Second environmental site visit

i

3.

Licen sin

Document

Issued

)P P

P ~

~ '

I

~ )1

c~

Draft Environmental

Statement

) ~P

Draft Safety Evaluation Report

Safety Evaluation Report

4.

A licant Res onses

Responses

to request for information in the safety

and environmental

areas

Letters and

FSAR updates to respond to OSER concerns

Comments to the

DES

'R

1