ML17054A259
| ML17054A259 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 12/06/1983 |
| From: | Haughey M Office of Nuclear Reactor Regulation |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8312120173 | |
| Download: ML17054A259 (10) | |
Text
~R RKgy
+
0 Cy "o'5
+~
~O
+p*~4 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 December 6,
1983 Docket No.:
50-410 APPLICANT:
Niagara Mohawk Power Corporation (NMPC)
FACILITY:
Nine Mile Point Unit 2
SUBJECT:
SUMMARY
OF MEETING WITH NMPC TO DISCUSS ADMINISTRATIVE MATTERS RELATED TO NINE MILE POINT UNIT 2 (NMP-2)
On November 22, 1983, the NRC staff met with representatives from NMPC to discuss administrative matters related to NMP-2.
Among the subjects discussed were the bases for a number of requests for additional information that were requested for NMP-2.
Specific examples in Seismology (determination of SSE to be used),
Hydrology (use of standards to determine PMP),
and Structural Engineering (information needed when codes other than those in the SRP are used) were discussed.
The applicant noted that a significant amount of work had been done in the area of seismology that was not accounted for in the requests for information.
The NRC staff stated that detailed evaluations are not performed in the requests for information but are done later in the Safety Evaluation Report (SER).
The applicant stated they considered it sufficient to use Hydrometeorology Report No.
33 for determination of Probable Maximum Precipitation (PMP) as it is specifically mentioned in the Standard Review Plan (SRP)
The NRC staff responded that although this standard is mentioned, the SRP also states that the latest methodology should be used when appropriate in determining PMP.
Hydrometeorology reports 51 and 53 contain updated information and more advanced methodology to determine the PMP.
These later reports are being used for other plants.
The staff has evaluated the use of these later reports with respect to the SRP and have determined it is in conformance with the SRP.
For Category I structures, and interior structures of containment which were designed and built to ACI 318 rather than ACI 349 as referenced in the
- SRP, the applicant was requested to identify and justify, with respect to safety, all deviations of these structures from the applicable requirements of ACI 349 as amended by the Regulatory Guide 1.142.
The NRC staff will then evaluate these deviations and justifications to assure there is no impact to the safety of this plant as a result of these deviations.
83i2i20i73 83i206 PDR ADQCK 05000410 A
The NRC staff noted that the applicant could make use of the appeal process to take discussions to a higher level whenever agreement could not be reached between the NRC staff and the applicant.
The applicant noted that communications between the NRC staff and the NMPC staff should remain open to provide necessary clarifications expeditiously.
A copy of the attendance list is attached.
~9@
'2giQBx ofgnea bp'ttachment:
As stated Mary F. Haughey, Project Manager Licensing Branch No.
2 Division of Licensing cc w/ attachment:
See next page DL:LB82 PM DL'82/BC MFHaughey:pt ASchw~cer 12/5 /83 12/p /83
@)f
~ ih II l
~
'q III 0/",
Ii 1'
II I
f'I>
p,f if h
I III fg
'I rh l
~
I I
II ~
)I i
I
Nine Mile Point 2 Mr. Gerald K. Rhode Senior Vice President Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, New York 13202 CC:
Mr. Troy B. Conner, Jr.,
Esq.
Conner k Wetterhahn Suite 1050 1747 Pennsylvania
- Avenue, N.W.
Washington, D. C.
20006 Mr. Richard Goldsmith Syracuse University College of Law E. I. White Hall Campus
- Syracuse, New York 13210 Mr. Jay Dunkleberger, Director Technological Development Programs New York State Energy Office Agency Building 2 Empire State Plaza
- Albany, New York 12223 Ezra I. Bialik Assistant Attor ney General Environmental Protection Bureau New York State Department of Law 2 World Trade Center New York, New York 10047 Resident Inspector Nine Mile Point Nuclear Power Station P. 0.
Box 99
- Lycoming, New York 13093 Mr. John W. Keib, Esq.
Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, New York 13202 Jay M. Gutierrez, Esq.
U. S. Nuclear Regulatory Coomission Region I 631 Park Avenue
~
~
King of Prussia, Pennsylvania 19406
r I
Attachment ATTENDANCE 11 3
Name C.
Mangan A. Zallnick N. Rademacher A. Schwencer M. Haughey G. Lear R. Bal lard M. Fliegel S.
Brocum Or anization NMPC NMPC NMPC NRC NRC NRC NRC NRC NRC Title Vice President, Nuclear Engineering 8 Licensing Licensing Manager Licensing Engineer Licensing Branch Chief Licensing Project manager Chief, Structural 8 Geotechnical Engineering Branch Chief, Environmental and Hydrol ogical Engineering Branch Section
- Leader, Hydrology Section
- Leader, Geology
~p 7
DATED:
December 6
1983 MEETING
SUMMARY
DISTRIBUTION:
~Document Control 50-410 NRC PDR L
PDR NSIC PRC LB82 File MHaughey EHylton Bordenick, OELD GLear RBallard MFliegel SBrocum Rllescott RRothman LYang
p i