ML17053D973

From kanterella
Jump to navigation Jump to search
Forwards Safety Evaluation Re Motor Starting Voltages During Diesel Generator Load Sequence Testing.Generator Maintains Voltages to Motors within Specified Limits During Load Sequencing to Accelerate to Rated Speed & Torque
ML17053D973
Person / Time
Site: Nine Mile Point 
Issue date: 07/18/1983
From: Vassallo D
Office of Nuclear Reactor Regulation
To: Rhode G
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17053D974 List:
References
NUDOCS 8307290382
Download: ML17053D973 (4)


Text

Docket Ho.60-220 JUL is

>9S3 ter. G. K. Rhode Senior Vice President Niagara Mohawk.Power Corporation 300 Erie Boulevard Hest

Syracuse, New York. 13202-

Dear Hr. Rhode:

SUBJECT:

MOTOR STARTING VOLTAGES DURING DIESEL GENERATOR LOAD SEQUENCE TESTING Hine Nile Point Nuclear Station, Unit Ho.

1 During the review of HPA B-48,":",Adequacy of Station Electric Distribution System Voltages,"

a concern on an a@unctive issue was identified by our contractor.

This concern was rel;ated to the motor starting voltage for a 450 HP core spray pump powered on the 4 KY bus.

We have reviewed the concern and have concluded that the diesel generator maintains voltages within specified limits to motors during load sequenc-ing to accelerate them to rated speed and torque without any adverse effects on safeguard equipment and other Class-'lE equipment.

The basis for our conclusion is provided in the enclosed Safety Evaluation.

Sincerely, Orlalng s)gaed 5R 9 B yamlh Domenic B. Vassallo, Chief Operating Reactors Branch 82 Division of'icensing

Enclosure:

Safety Evaluation cc w/enclosure; See next page DIST:

Docket File OELD ACRS-10 8307290382 8307l8 PDR ADOCK 05QQQ220 P

PDR NRC PDR EJordan Gray LPDR ORB¹2 Reading RHermann SHorri,s JDonohew AGill DEisenhut JTaylor

JSelan, LLNL OFF1 DL:0 B¹2

~ "'SNo 'ts---

SURNAME).oo/%19/+3 o ~ ~ ~ ~ o ~

DATE$

o ~ o ~ ~ ~ ~ ~ ~ o ~ o ~ ~ ~ ~

~

~ ~

~

DL:ORB¹ er"'ann' b

~ oP ego ~ ~ ~ ~ O ~

DL:ORB¹2

~ ~ ~ o No

~ ~

~ ~ ~ ~ E(\\(o

-- j(jP~f88--

~

~ ~ o ~ oo ~ o ~ ~ o ~ ~ o ~ o ~\\oooo

~ o

~ o ~

~ o

~ o ~ ooo ~ ~ ~ ~ ~ o ~

NRG FORM 318 OO-80) NRCM 0240 OFFICtAL RECORD COPY USGPO: 1991~o990

CA

Mr. G. K. Rhode Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station, Unit No.

1 CC:

Troy B. Conner, Jr.. Esq.

Conner 8 Wetterhahn Suite 1050 1747 Pennsylvania Ave.,

NW Washington, D.C.

20006

Director, Technological Development Programs State of New York Energy Office Swan StreetBuilding CORE 1" - Second Floor Empire State Plaza
Albany, New York 12223 Mr. Robert P. Jones',

Supervisor Town of Scriba R.

D.

-..4

Oswego, New York 13126 Niagara Mohawk Power Corporation ATTN:

Mr. Thomas Perkins Plant Superintendent Nine Mile Point Nuclear Station P.O.

Box 32

Lycoming, New York 13093 John W. Keib, Esquire Niagara Mohhwk Power Corporation 300 Erie Boulevard West
Syracuse, New York 13202 Regional Administrator, Region I

U.S. Nuclear Regulatory Comnission 631 Park Avenue King of Prussia, PA 19406 Mr. Jay Dunkleberger Division of Policy Analysis and Planning New York State Energy Office Agency Building 2, Empire State Plaza Albany; New York 12223 U.S.

Environmental Protection Agency Region II Office Regional Radiation Representative 26 Federal Plaza New York, New York 10007 Res ident Inspector c/o U.S.

NRC P. 0. Box 126

Lycoming, New York 13093