Forwards IE Insp Rept 50-410/81-13 on 811130-1211 & 17-18, App A,Notice of Violation & App B,Significant Observations
ML17053D109
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 03/17/1982
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rhode G
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17053D110 List:
References
NUDOCS 8204200452
Download: ML17053D109 (6)


See also: IR 05000410/1981013

Text

Docket No. 50-410

MAR yv 1982

Niagara

Mohawk Power Corporation

ATTN:

Mr. Gerald

K. Rhode

Vice President

System Project

Management

c/o Miss Catherine

R. Seibert

300 Erie Boulevard,

West

Syracuse,

New York

13202

Gentlemen:

Subject:

Inspection

50-410/81-13

O

I

Q+

gQ

Cup

L>

This refers to the special

Construction

Assessment

Team inspection

conducted

by

a team

headed

by Mr. L. Tripp of this office on November

30-December

18,

1981 at

Nine Mile Point Station,= Unit 2,

and corporate offices at Scriba

and Syracuse,

New York respectively of activities authorized

by

NRC License

No.

CPPR-112

and

to discussions

of our findings held by Mr. Tripp with Mr., Bartlett and other

members of the

NMPC and

S&W staff at the conclusion of the inspection.

Areas examined during this inspection

are described

in the Office of Inspection

and Enforcement

Inspection

Report which is enclosed with this letter.

Within

these

areas,

the inspection consisted

of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observations

by the

inspector.

Based

on the results of this inspection, it appears

that certain of your activities

were not conducted

in full compliance with NRC requirements,

as set forth in the

Notice of Violation, enclosed

herewith

as Appendix A. These

items of noncompliance

have

been categorized

into the levels described

in the Federal

Register Notice

(45 FR 66754) dated October 7,

1980.

You are required to respond to this letter

and in preparing your response,

you should follow the instructions in Appendix

A.

In addition to the apparent

items of noncompliance

discussed

above

and in Appendix

A, "Notice of Violation", findings of this inspection also indicate that

a

significant weakness

exists in your design

and construction

program.

This area

is discussed

in Appendix B, Significant Observations.

You are requested

to inform this office within thirty (30) days of the date of

this letter of the results of actions you have taken or plan to take to improve

your design

and construction

program in the area of significant weakness

identified

in Appendix B.

, I:DETP

r'/pja

3/ /82'I:

DETP

$bpnter

OFFICIAL RECORD

COPY

S204200452

8203<

PDR

ADOCK 05000410

8

PDR

~

)s

f

l

Niagara

Mohawk Power Corporation

2

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of this

letter and the enclosed

inspection report will be placed in the NRC's Public

Document

Room.

If this report contains

any information that you (or your contra-

ctors) believe to be exempt

from disclosure

under

10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone within ten (10) days from the date

of this letter of your intention to file a request

for withholding; and (b)

submit within 30 days

from the date of this letter

a written application to this

office to withhold such information.

Consistent with section 2.790(b)(1),

any

such application

must

be accompanied

by an affidavit executed

by the

owner of

the information which identifies the document or part sought to be withheld,

and

which contains

a full statement

of the reasons

on the basis which it is claimed

that the information should

be withheld from public disclosure.

This section

further requires

the statement

to address

with specificity the considerations

listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall

be

incorporated

as far as possible into a separate

part of the affidavit. If we do

not hear from you in this regard within the specified periods

noted above,

the

report will be placed in the Public Document

Room.

The telephone notification

of your intent to request withholding, or any request for an extension of the

10

day period which you believe necessary,

should

be

made to the Supervisor,

Files,

Mail and Records,

USNRC Region I, at (215) 337-5223.

The responses

directed

by this Notice are not subject to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork

Reduction

Act of 1980,

PL 96-511.

Should you have

any questions

concerning this inspection,

we will be pleased

to

discuss

them with you.

Sincerely,

Origiro~ S

Thomas

T. Martin, Director

Division of Engineering

and

Technical

Programs

Enclosures:

l.

Appendix A, Notice of Violation

2.

Appendix B, Significant Observations

2.

NRC Region I Inspection

Report

No. 50-410/81-13

OFFICIAL RECORD

COPY

y

f

Niagara

Mohawk Power Corporation

3

cc w/encls:

Leonard

M. Trosten,Esquire

Carl

D. Hobelman,

Esquire

NMPC QA

Public Document

Room (PDR)

Local Public Document

Room

Nuclear Safety Information

State of New York

NRC Resident

Inspector

(LPDR)

Center

(NSIC)

bcc w/encls:

Region I Docket

Room (with concurrences)

Chief, Operational

Support Section

(w/o encls)

OFFICIAL RECORD

COPY

v

I