ML17053C906
| ML17053C906 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 10/19/1981 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Rhode G NIAGARA MOHAWK POWER CORP. |
| Shared Package | |
| ML17053C907 | List: |
| References | |
| NUDOCS 8111050345 | |
| Download: ML17053C906 (4) | |
See also: IR 05000410/1981011
Text
Ot,T 1 9'l981
Docket No. 50-410
Niagara
Mohawk Power Corporation
ATTN:
Mr. Gerald
K.
Rhode
Vice President
System Project
Management
c/o Miss Catherine
R. Seibert
300 Erie Boulevard,
West
Syracuse,
13202
XEHQZ~CP+
NOVO< ]gg]g
Gentlemen:
Subject:
Inspection
No. 81-11
This refers to the routine inspection
conducted
by Mr.
R. Feil of this
office on September
29-30,
1981 at Niagara
Mohawk Power Corporation
Corporate offices in Syracuse,
New York and Nine Mile Point Nuclear
Power Station; Scriba,
New York of activities authorized
by
NRC License
No.
CPPR-112
and to the discussions
of our findings held by Mr. Feil
with W.
B. Bryant of your staff at the conclusion of the inspection.
Areas
examined during this inspection
are described
in the Office of
Inspection
and Enforcement
Inspection
Report which is enclosed with thi s
letter.
Within these
areas,
the inspection consisted
of selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
Within the
scope of this inspection,
no items of noncompliance
were
observed.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy
of this letter
and the enclosed
inspection report will be placed in the
NRC's Public Document
Room.
If this report contains
any information
that you (or your contractors)
believe to be exempt
from disclosure
under
10 CFR 9.5(a)(4), it is necessary
that you (a) notify this office
by telephone within ten
( 10) days
from the date of this letter of your
intention to file a request for withholding; and (b) submit within 25
days
from the date of this letter
a written application to this office
to withhold such information.
Consistent with section 2.790(b)(1),
any
such application
must be accompanied
by an affidavit executed
by the
owner of the information which identifies the document or part sought to
be withheld,
and which contains
a full statement
of the reasons
on the
basis
which it is claimed that the information should
be withheld from
public disclosure.
This section further requires
the statement
to
address
with specificity the considerations
listed in 10 CFR 2.790(b)(4).
R1: DRPI
Rl: DRPI
R:
Feil/lb
Kister
Bru ner
(i)1(10/13/81
10/IY81
10(g/81
OFFICIAL RECORD
COPY
8iii050345 8iiOi9
ADOCK 050004iO
9
((Ill
s(~
M
4
ilr
~4
I
II
M
ll
1
I'I
I
-4r
I'
4
II
Niagara 9)obaHk." power Corp.I
OCT 19
)981
The information sought to be withheld shall
be incorporated
as far as
possible into a separate
part of the affidavit. If we do not hear
from
you in this regard within the specified periods
noted above,
the report
will be placed in the Public Document
Room.
The telephone notification
of your intent to request withholding, or any request for an extension
of the
10 day period which you believe necessary,
should
be
made to the
Supervisor,
Files Mail and Records,
USNRC Region I, at (215) 337-5223.
No reply to this letter is required;
however, if you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
Origiaal Signs 6 Bt
'ldon
J.
Brunner, Chief, Projects
Branch
No.
1, Division of Resident
and Project Inspection
Enclosure:
Office of Inspection
and Enforcement
Inspection
Report
Number 50-410/81-11
cc w/encl:
Eugene
B. Thomas, Jr.,
Esquire
Public Document
Room
(PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
State of New York
bcc w/encl:
Region I Docket
Room (with concurrences)
R. A. Feil, Reactor
Inspector
Chief, Operational
Support Section
(w/o encls)
OFFICIAL RECORD
COPY
'1
","$b '39
PWCA
<>>"
~
p'<<