ML17053C844

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-410/81-07 on 810727-31 & Notice of Violation
ML17053C844
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/01/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rhode G
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17053C845 List:
References
NUDOCS 8109240539
Download: ML17053C844 (4)


See also: IR 05000410/1981007

Text

SfP 0 ~ 1981

Docket No. 50-410

Niagara

Mohawk Power Corporation

"ATTN:

Mr. Gerald

K.

Rhode

Vice President

System Project

Management

c/o Miss Catherine

R. Seibert

300 Erie Boulevard,

West

Syracuse,

New York

13202

<>~gp CO~

Gentlemen:

cPu't A

w~/j ./ -)iiu

~@o J

5

i/(

Subject:

Inspection

50-410/81-07

This refers to the routine safety inspection

conducted

by Mr. R.J.

Paolino

of this office on July 27-31,

1981 at Nine Mile Point Nuclear Station, Unit

2, Scriba,

New York of activities authorized

by

NRC License

No.

CPPR-112

and to the discussions

of our findings held by Mr. Paolino with Mr. J.

Dillon and other

members of your staff at the conclusion of the inspection.

Areas

examined during this inspection

are described

in the Office of Inspection

d

E f

nt Ins ection Report which is enclosed with this letter.

Within these

areas,

the inspection consisted of selectivee examinations of

proce

rocedures

and representative

records,

interviews with personnel,

and

observations

by the inspector.

Based

on the results of this inspection, it appears

that one of your activities

d t d 'ull compliance with NRC requirements,

as set forth in

This item of

the Notice of Violation, enclosed

herewith as Appendix A.

is i

noncompliance

has

been categorized

into the levels described

in the Federal

Register Notice (45 FR 66754) dated October 7,

1980.

You are required to

respond to this letter and in preparing your response,

you should follow

the instructions

in Appendix A.

In accor

ance

wi

d

'th

10 CFR 2.790 of the Commission's

regulations,

a copy of

ic Document

t is

e

er

an

e

h'

tt

d th

enclosures will be placed in the

NRC

s Public

R

If this report contains

any information that you (or your

our contractors )

b

ieve to be exempt

from

isclosure

under

10

CFR

. (a)( ),

oom.

is re

.5(a)(4) it is necessary

aolino/wb

la

Tripp

~bneter

T. Martin Kister

Brupner

8/p4/81

8/25/81

8/p5/81 ~ 8/pf/81

8/~p/81

8~81

8/1 Y'8l

27

g't

OFFICIAL RECORD

COPY

I~8i09240539 81090iI

PDR

ADOCK 050004i0

I,G

PDR /

~, ~

l

0-

Niagara

Mohawk Power Corporation

2

that you (a) notify this office by telephone within ten (10) days

from the

date of this letter of your intention to file a request for withholding;

and (b) submit within 25 days

from the date of this letter

a written application

to this office to withhold such information.

Consistent with section

2.790(b)(1),

any such application

must be accompanied

by an affidavit

executed

by the owner of the information which identifies the document or

part sought to be wi.thheld,

and which contains

a full statement

of the

reasons

on the basis which it is claimed that the information should

be

withheld from public disclosure.

This section further requires

the statement

to address

with specificity the considerations

listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall

be incorporated

as far as

possible into a separate

part of the affidavit. If we do not hear from you

in this regard within the specified periods

noted above,

the report will be

placed in the Public Document

Room.

The telephone notification of your

intent to request withholding, or any request for an extension of the

10

day period which you believe necessary,

should

be

made to the Supervisor,

Files, Mail and Records,

USNRC Region I, at (215) 337-5223.

Should you have

any questions

concerning this inspection,

we wi 11

be pleased

to discuss

them with you.

Sincerely,

E.J.

Brunner, Chief

Projects

Branch ¹I, Division of

Resident

and Project Inspection

Enclosures:

l.

Appendix A, Notice of Violation

2

~

Office of Inspection

and Enforcement

Inspection

Repor t Number 50-410/81-07

cc w/encls:

Eugene

B. Thomas, Jr.,

Esquire

NMPC QA

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

State of New York

bcc w/encls:

Region I Docket

Room (with concurrences)

R. A. Feil, Reactor Inspector

Chief, Operational

Support Section

(w/o encls)

OFFICIAL RECORD

COPY

~

~

A

\\

Ji