ML17053C827

From kanterella
Jump to navigation Jump to search
Immediate Action Ltr 81-28 Re Telcon Concerning Occurrence in Which Both Emergency Diesel Generators Were Found Inoperable on 810818.Details Deleted (Ref 10CFR2.790)
ML17053C827
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 08/18/1981
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lempges T
NIAGARA MOHAWK POWER CORP.
References
IAL-81-28, NUDOCS 8109150488
Download: ML17053C827 (20)


Text

~fl REOII, C+

Np0 4~

il

~+

0

/f +>>*++

NUCLEAR REGULATORY COMMISSION REGION I 661 PARK AVENUE KING OF PRUSSIA, PENNSYLVANIA19406 3.S AUG 198l Docket No. 50-220 IAL No. 81"28 Niagara Mohawk Power Corporation ATTN:

Mr. T.

E.

Lempges Yice President Nuclear Generation 300 Erie Boulevard West

Syracuse, New York 13202 Gentlemen:

This refers to the telephone conversation be'tween Mr. T. Perkins, General Superintendent, Nuclear Generation and Mr. E. Brunner, Acting Director, Division of Resident and Project Inspection relative to the occur~ence in which'both emergency diesel generators were found to be inoperable on August 18, 1981.

The specific actions you have taken and which are the subject of this correspondence are contained in the enclosure to this letter.

In accordance with Section 2;790(d) of the NRC's "Rules of Practice,"

Part 2, Title. 10, Cod'e of Federal. Regulations, documentation of findings of your control and accounting.procecQres for safeguarding special nuclear materials and your facility security measures for physical protection are deemed to be commercial or financial information within the meaning of 10 CFR 9.5(a)(4) and shall be subject to disclosure only in accordance with the provisions of 10 CFR 9. 12; therefore, enclosure to this letter will not be placed in the Public Document Room and will receive limited distribution.

We further understand that you will maintain these measures in effect until further notification from this office.

Additionally, if any further instance(s),

such as occurred on August 18,

1981, are indicated, notify the NRC immediately as additional actions may be deemed warranted.

Si neer ely,

/

Enclosure:

As Stated 8

e H. Grier rector

s I

~ ~

Niagara Mohawk Power Carna~ioz cc w/encl:

T. Perkins, General Superintendent, Nuclear Generation T.

Roman, Station Superintendent R. Abbott, Operations Supervisor E.

B. Thomas, Jr.,

Esquire Public Document Room (POR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of New York

~

l I

I>

This page contains Safeguards Information, and is not for public disclosure.

It is intentionally 1 eft blank.

This page contains Safeguards Information, and is not for public disclosure.

It is intentionally left blank.

I I

EXHIBIT 9 Individuals Interviewed This page is intentionally left blank, as it contains the names of persons interviewed as part of this investigation.

Individual s Interviewed (Con't)

This page is intentionally left blank, as it contains the names of persons interviewed as part of this investigation.

I J

t p Individuals Interviewed (Con't)

This page is intentionally left blank, as it contains the names of persons interviewed as part of this investigation.

~

I l

This page contains Commercial or Financial Information, in accordance with 10 CFR 2.790(d),

and is not for public disclosure.

It is intentionally left blank.

(

l

This page contains Commercial or Financial Information, in accordance with 10 CFR 2.790(d),

and is not for public disclosure.

It is intentionally left blank.

t l

This page contains Commercial or Financial Information, in accordance with 10 CFR 2.790(d),

and is not for public disclosure.

It is intentionally left blank.

~

~