ML17053C816
| ML17053C816 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 08/20/1981 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Rhode G NIAGARA MOHAWK POWER CORP. |
| Shared Package | |
| ML17053C817 | List: |
| References | |
| NUDOCS 8109030094 | |
| Download: ML17053C816 (4) | |
See also: IR 05000410/1981006
Text
g Q AUG l)81
Docket No. 50-410
XEBQZ~
Niagara
Mohawk Power Corporation
ATTN:
Mr. Gerald
K. Rhode
Vice President
System Project
Management
c/o Miss Catherine
R. Seibert
300 Erie Boulevard,
West
Syracuse,
13202
9
SEP 021981~
~~~
M>a ~g~ul
$N
Gentlemen:
Subject:
Inspection
50-410/81-06
This refers to the routine inspection
conducted
by Mr.
R. Feil of this
office on July 14-16,
1981 at your corporate office and Nine Mile Point
Nuclear
Power Station,
Unit 2 of activities authorized
by
NRC License
No.
CPPR-112
and to the discussions
of our findings held by Mr. Feil with N.L.
Rademacher
of your staff at the conclusion of the inspection,
and to
a
subsequent
telephone
discussion
between
Mr. P.
Francisco
and Mr. Feil
on
July 22,
1981.
Areas
examined during this inspection
are described
in the Office of Inspection
and Enforcement
Inspection
Report which is enclosed with this letter.
Within these
areas,
the inspection consisted
of selective
examinations
of
procedures
and representative
records,
interviews with personnel,
and
observations
by the inspector.
Within the
scope of this inspection,
no items of noncompliance
were observed.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of
this letter and the enclosed
inspection report will be placed in the
NRC'
Public Document
Room.
If this report contains
any information that you (or
your contractors)
believe to be exempt
from disclosure
under
it is necessary
that you (a) notify this office by telephone within ten
(10) days
from the date of this letter of your intention to file a request
for withholding; and (b) submit within 25 days from the date of this letter
R1: DRP
R1: DRPI
R1:
I
f
Kister
Brunner
1
8/14/81
8/
/81
I
OFFICIAL RECORD
COPY
8i09030094 8i0820
ADQCK 05000410
. G
g ~
~
,l.pl{
qF
I
Niagara
Mohawk Power Corporation
g p AUG 1S81
a written application to this office to withhold such information.
Consistent
"
with section 2.790(b)(l),
any such application "must be accompanied
by an
affidavit executed
by the owner of the information which identifies the
document or part sought to be withheld,
and which contains
a full statement
of the reasons
on the basis which it is claimed that the information should
be withheld from public disclosure.
This section further requires
the
statement
to address
with specificity the considerations
li'sted in
The information sought to be withheld shall
be incorporated
as far as possible into a separate
part of the affidavit. If we do not
hear from you in this regard within the specified periods
noted above,
the
report will be placed in the Public Document
Room.
The telephone notification
of your intent to request withholding, or any request for an extension of
the
10 day period which you believe necessary,
should
be
made to the Supervisor,
Files, Mail and Records,
USNRC Region I, at (215) 337-5223.
No reply to this letter is required;
however, if you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
Original Signed By-
lE:. g, gR.~+~
Eldon J. Brunner, Chief, Projects
Branch Pl, Division of Resident
and Project Inspection
Enclosure:
Office of Inspection
and Enforcement Inspection
Report
Number 50-410/81-06
cc w/encl:
Eugene*B;-
Thomas, Jr.,
Esquire
Public Document
Room (PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
State of New York
bcc w/encl:
Region I Docket
Room (with concurrences)
R. A. Feil, Reactor Inspector
Chief, Operational
Support Section
(w/o encl)