Docket No. 50-220
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
631 PARK AVENUE
KING OF PRUSSIA, PENNSYI VANIA 19406
JUN 2 5
1981
K Qj.E COPY.
Niagara
Nohawk Power Corporation
ATTN:
Nr. T.
E.
Lempges
Vice President
Nuclear Generation
300 Erie Boulevard Hest Syracuse,
Gentlemen:
Subject:
Inspection
50-220/81-12
13202
JUL 091981'~
IN~/,R~
1 t
ppgMISSQR
/pj
This refers to the routine safety inspection
conducted
by Hr. S.
Hudson of this
office on April
1 to Nay 1,
1981,. at Nine Nile Point, Unit 1, Scriba,
of activities authorized
by
NRC No.
DPR-63 and to the discussions
of our findings
held by Hr. Hudson with Hr. T.
Roman of your staff at. the conclusion of the
inspection.
Areas
examined during this inspection
are described
in the Office of Inspection
and Enforcement Inspection
Report which is enclosed with this letter.
Within
these
areas,
the inspecI',ion consisted
of selective
examinations of procedures
and representative
records,
interviews with personnel,
measurements
made
by the
inspector,
and observations
by the inspector.
Based
on the results of this inspection, it appears
that certain of your activi-
ties were not conducted in full compliance with NRC requirements,
as set forth
in the Notice of Violation, enclosed
herewith as Appendix A.
These
items of
noncompliance
have
been categorized
into the levels described in the Federal
Register Notice (45 FR 66754)
dated October 7, 1980.
This notice is sent to you
pursuant to the provisions of Section
2.201 of the
NRC's "Rules of Practice,"
Part 2, Title 10,
Code of Federal
Regulations.
Although Section
2.201 requires
you to submit to this office, within 25 days of your. receipt of'his notice,
a
written statement of explanation,
we note that these
items of noncompliance
were
corrected prior to the completion of our inspection
and therefore,
no response
with respect to these matters is required.
In accordance with 10 CFR 2.790 of the Commission's
regulations,
a copy of this
letter and the enclosures will be placed in the NRC's Public Document
Room.
If
this report contains
any information that you (or your contractors} believe to
be exempt from disclosure
under
10 CFR 9. 5(a}(4}, it is necessary
that you (a)
notify this office by telephone within ten
(10) days
from the date of this
letter of your intention to file a request for withholding; and (b) submit
within 25 days from the date of this letter
a written application to this office
to withhold such information.
Consistent with section 2.790(b}(l}, any such
application must be accompanied
by an affidavit executed
by the owner of the
8107100171
810625
ADOCK 05000220
8
)f, >])
l)
Niagara
Hohawk Power Corporation
""M 2 5 'f981
information which identifies the document or part sought to be withheld, and
which contains
a full statement of the reasons
on the basis
which it is. claimed
that the information should
be withheld from public disclosure.
This section
further requires
the statement
to address
with specificity the considerations
listed in 10 CFR 2.790(b)(4).
The 'information sought to be withheld shall
be
incorporated
as far as possible into a separate
part of the affidavit. If we do
not hear from you'n this regard within the specified periods
noted above,
the
report will be placed in the Public,.Document
Room.
The telephone notification
of your intent to request withholding, or any request for an extension of the
10
day period which you believe. necessary,
should
be made to the Supervisor,
Files,
Nail and Records,
USNRC Region I, at (215) 337-5223.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
Enclosures:
El
. Brunner, Chief, Projects
Br nch 81, Division of Resident
and Project Inspection
l.
Appendix,A, Notice of Yiolation
2.
Office of Inspection
and Enforcement
Inspection
Report Number 50-220/81-12
cc w/encls:
T. Perkins,
General
Superintendent,
Nuclear Generation
T.
Roman, Station Superintendent
R. Abbott, Operations
Supervisor
E.B. Thomas, Dr., Esquire