ML17053C672
| ML17053C672 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 06/02/1981 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Rhode G NIAGARA MOHAWK POWER CORP. |
| Shared Package | |
| ML17053C673 | List: |
| References | |
| NUDOCS 8106160582 | |
| Download: ML17053C672 (4) | |
See also: IR 05000410/1981003
Text
I
~R,R poo,
C+
Npo
Cip
~c
o'g
YJ+
~O
+w*w+
(Eyi(.F, Cppy
mi( ll I'9t
i'-'<5Jfh "
>IIIII 8 $81~
u.S taaEAII +erJCQN
..l2
ooMMI%I0II
JUN 0 2
1S81
Docket No; 50-410
Niagara
Mohawk Power Corporation
ATTN:
Mr. Gerald
K.
Rhode
Yice President
System Project
Management
,c/o Miss Catherine
R. Seibert
,'00 Erie 8oulevard,
West
Syracuse,
13202
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
631 PARK AVENUE
KING OF PRUSSIA, PENNSYLVANIA19406
Gentlemen:
Subject:
Inspection
No. 81-03
This refers to the routine safety
i nspection
conducted
by Mr.
R. Feil of
this office on April 21-23,
1981 at Nine Mile Point Nuclear
Power Station,
Unit 2 of activities authorized
by
NRC License
No.
CPPR-112
and to the
discussions
of our findings held by Mr. Feil with J.L. Dillon of your staff
at the conclusion of the inspection.
Areas
examined during this inspection
are described
in the Office of Inspection
and Enforcement Inspection
Report which is enclosed with this letter.
Within these
areas,
the inspection
consisted of selective
examinations
of
procedures
and representative
records,
interviews with personnel,
and
observations
by the inspector.
Within the
scope of this inspection,
no'items of noncompliance
were observed.
In accordance
with 10 CFR 2.790 of the Commissions's
regulations,
a copy of
this letter and the enclosed
inspection report will be placed in the
NRC's
Public Document
Room.
If this report contains
any information that you (or
your contractors)
believe to be exempt
from disclosure
under
(4), it is necessary
that you (a) notify this office by telephone within
ten (10) days
from the date of this letter of your intention to file a
request
for. withholding; and (b) submit within 25 days
from the date of
this letter
a written application to this office to withhold such information.
Consistent with Section 2.790(b)(1),
any such application must be accompanied
by an affidavit executed
by the owner of the information which identifies
the document or part sought to be withheld and which contains
a full statement
+Col
S
(/(
plpszpp gyp,.
~
~
Niagara
Mohawk Power Corporation
JUN 0 8 881
of the reasons
on the basis
which it is claimed that the information should
be withheld from public disclosure.
- This section further requires
the
statement
to address
with specificity the considerations
listed in 10 CFR 2.790(b)(4).
The information sought to be withheld shall
be incorporated
as far as possible into a separate
part of the affidavit. If we do not
hear
from you in this regard within the specified periods
noted above,
the
report will be placed in the Public Document
Room.
The telephone notification
of your intent to request withholding, or any request for an extension of
the
10 day period which you believe necessary,
should
be
made to the Supervisor,
Files, Mail and Records,
USNRC Region I, at (215) 337-5223.
No reply to this letter is required;
however,
should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
d
n
, Brunner, Chief,
R
ctor Projects
Branch
1,
D>vision of Resident
and Project
Inspection
Enclosure:
Office of Inspection
and Enforcement
Inspection
Report
Number 50-410/81-03
cc w/encl:
Eugene
B. Thomas, Jr.,
Esquire
Niagara
Mohawk Power Corporation,
gA
0
~
A