ML17053C672

From kanterella
Jump to navigation Jump to search
Forwards IE Safety Insp Rept 50-410/81-03 on 810421-23.No Noncompliance Noted
ML17053C672
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/02/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rhode G
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17053C673 List:
References
NUDOCS 8106160582
Download: ML17053C672 (4)


See also: IR 05000410/1981003

Text

I

~R,R poo,

C+

Npo

Cip

~c

o'g

YJ+

~O

+w*w+

(Eyi(.F, Cppy

mi( ll I'9t

i'-'<5Jfh "

>IIIII 8 $81~

u.S taaEAII +erJCQN

..l2

ooMMI%I0II

JUN 0 2

1S81

Docket No; 50-410

Niagara

Mohawk Power Corporation

ATTN:

Mr. Gerald

K.

Rhode

Yice President

System Project

Management

,c/o Miss Catherine

R. Seibert

,'00 Erie 8oulevard,

West

Syracuse,

New York

13202

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

631 PARK AVENUE

KING OF PRUSSIA, PENNSYLVANIA19406

Gentlemen:

Subject:

Inspection

No. 81-03

This refers to the routine safety

i nspection

conducted

by Mr.

R. Feil of

this office on April 21-23,

1981 at Nine Mile Point Nuclear

Power Station,

Unit 2 of activities authorized

by

NRC License

No.

CPPR-112

and to the

discussions

of our findings held by Mr. Feil with J.L. Dillon of your staff

at the conclusion of the inspection.

Areas

examined during this inspection

are described

in the Office of Inspection

and Enforcement Inspection

Report which is enclosed with this letter.

Within these

areas,

the inspection

consisted of selective

examinations

of

procedures

and representative

records,

interviews with personnel,

and

observations

by the inspector.

Within the

scope of this inspection,

no'items of noncompliance

were observed.

In accordance

with 10 CFR 2.790 of the Commissions's

regulations,

a copy of

this letter and the enclosed

inspection report will be placed in the

NRC's

Public Document

Room.

If this report contains

any information that you (or

your contractors)

believe to be exempt

from disclosure

under

10 CFR 9.5(a)

(4), it is necessary

that you (a) notify this office by telephone within

ten (10) days

from the date of this letter of your intention to file a

request

for. withholding; and (b) submit within 25 days

from the date of

this letter

a written application to this office to withhold such information.

Consistent with Section 2.790(b)(1),

any such application must be accompanied

by an affidavit executed

by the owner of the information which identifies

the document or part sought to be withheld and which contains

a full statement

+Col

S

(/(

plpszpp gyp,.

~

~

Niagara

Mohawk Power Corporation

JUN 0 8 881

of the reasons

on the basis

which it is claimed that the information should

be withheld from public disclosure.

- This section further requires

the

statement

to address

with specificity the considerations

listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall

be incorporated

as far as possible into a separate

part of the affidavit. If we do not

hear

from you in this regard within the specified periods

noted above,

the

report will be placed in the Public Document

Room.

The telephone notification

of your intent to request withholding, or any request for an extension of

the

10 day period which you believe necessary,

should

be

made to the Supervisor,

Files, Mail and Records,

USNRC Region I, at (215) 337-5223.

No reply to this letter is required;

however,

should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

d

n

, Brunner, Chief,

R

ctor Projects

Branch

1,

D>vision of Resident

and Project

Inspection

Enclosure:

Office of Inspection

and Enforcement

Inspection

Report

Number 50-410/81-03

cc w/encl:

Eugene

B. Thomas, Jr.,

Esquire

Niagara

Mohawk Power Corporation,

gA

0

~

A