Ack Receipt of Re Evaluation of Core Spray Sys Sparger Cracking.Concurs W/Evaluation of Sparger Insp. Requests Info Re Nozzle Coverage,Discussed at 810415 Meeting in Bethesda,Md.Safety Evaluation Encl
ML17053C667
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/02/1981
From: Ippolito R, Ippolito T
Office of Nuclear Reactor Regulation
To: Dise D
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17053C668 List:
References
NUDOCS 8106120397
Download: ML17053C667 (6)


Text

Docket No. 50-220

!JUN 2

1981 Hr. Donald P. Disc Vfce President - Engineering c/o f1fss Catherine R. Sefbert Niagara Mohawk Power Corporation 300 Erie Boulevard West

Syracuse, New York 13202

Dear Hr. Disc:

Dis ibution cket File NRC PDR Local PDR ORB¹2 Reading D. Eisenhut J. Heltemes, AEOD T. Ippolito S. Norris P ~

Pol k OELD

.IE(3)

K.'Wichman NSIC TERA ACRS (10)

E. Jordan, IE By letter dated flay 13, 1981 you submitted an evaluation of Core Spray System sparger cracking for Nine Mile Point (Unit 1).

In essence,;you con-cluded that the two minor cracks found dfd not warrant corrective action at this time.

We have reviewed your evaluation of the sparger inspection and concur fn your findings, i.e., operation of Nine Mile Point for another fuel cycle will not endanger'public health and safety.

The basis for this approval fs descrfbed fn the enclosed Safety Evaluation.

As you know,-the reliability of the Core Spray System has been questioned fn several other areas, the most salient being spray coverage fn a steam environment.

During a meeting fn Bethesda on April 15, 1981 this question of nozzle coverage was discussed.

By letter dated Hay 22, 1981 you indicated that a program which resolves 'this generic issue would be submitted fn September 1981.

Your timely submittal of this information

-fs requested.

If we can be of further assistance, please advise.

Sincerely, Or1ginal Signed II@

To A JPPDQg)

Encl osur e:

1. Safety Evaluation 81063.301 1

cc w/enclosure See next page P

(Idd Thomas A. Ippolfto, Chief Operating Reactors Branch ¹2

>,],c:.

Division of Licensing ef.

9 Unos Bet~ >>

OFFICE/

SURNAME)

DATE0 ORB¹2 ORB¹2

~

~ ~ ~

~ ~ I ~ ~ ~

\\ ~

SNorri s PPol k: abc "5//'")81"""""P'("/h't'""'2

~ ~ ~

~

~ ~ ~ ~ ~ ~ ~ ~

~

~ ~ ~

K.>(ichman

"'4)i'/81-'-'- "~)W/

"'"'RC FORM 318 110/801 NRCM 0240 OFF I CIA L R EGO R 0 COPY A USGPO; 198~29 824

, ~ h 1

1

~ ~ 1 Phf

~ h hh

~ lh I

~ ~

1

~

~4f !

4 t,

~

I

~

1 FV ~

~

~

~

~ lh I

~

~ VF~ 1

~f f

1 f Ig

'h

~

1 F

1 h

~,

11 11

~

Y

pe REGII (4

0 Cy

~c ClO

(!

Vip

~O

+**++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 June 2, 1981 Docket No. 50-220 Hr. Donald P.

Disc Vice President - Engineering c/o Hiss Catherine R. Seibert Niagara Hohawk Power Corporation 300 Erie Boulevard West

'yracuse, New York 13202

Dear Hr. Disc:

By letter dated Hay 13, 1981 you submitted an evaluation of Core Spray System sparger cracking for Nine Hile Point (Unit 1).

In essence, you co@-

-eluded that the two minor cracks found did not warrant corrective action at this time.

We have reviewed your evaluation of the sparger inspection and concur in your findings, i.e., operation of Nine Hile Point for ariother fuel cycle will. not endanger public health and safety.

The basis for this approval is described in the enclosed Safety Evaluation.

As you know, the reliability of the Core Spray System has been questioned in several other areas, the most salient being spray coverage in a steam-environment.

During a meeting in Bethesda on April 15, 1981 this question of nozzle coverage was discussed.

By letter dated

Hag22, 1981 you indicated that a program which resolves this generic issue would be submitted in September 1981.

Your timely submittal of this information is requested.

If we can be of further assistance, please advise.

Sincerely,

Enclosure:

1. Safety Evaluation Thomas ppols ief Operating Reactors Branch 82 Division of Licensing cc w/enclosure See next,.page

~

r

Nr. Donald P. Disc CC:

Eugene B. Thomas, Jr.,

Esquire

LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire
Avenue, N.

W.

Suite 1100 Washington, D.

C.

20036 State University College at Oswego Penfield Library - Documents

Oswego, New York 13126 Mr. Joseph J.
Sunser, Manager System Security Niagara Mohawk Power Corporation 300 Erie Boulevard West
Syracuse, New York 13202 Resident Inspector c/o U.S.

NRC P. 0.

Box 126 L'ycoming, New York 13093 (Securi ty matters only)