ML17053C493

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-220/80-19 on 801102-1215.No Noncompliance Noted
ML17053C493
Person / Time
Site: Nine Mile Point 
Issue date: 02/11/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lempges T
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17053C494 List:
References
NUDOCS 8104060167
Download: ML17053C493 (4)


See also: IR 05000220/1980019

Text

~ 6p,8 IIECCg

o

o

+**++

Docket No. 50-220

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

63I PARK AVENUE

KING OF PRUSSIA. PENNSYLVANIA 10406

FEB 11

1981

Niagara

Mohawk Power Corporation

ATTN:

Mr. T.

E.

Lempges

Vice President

Electric Operations

300 Erie, Boulevard

West

Syracuse,

New York

13202

Gentlemen:

Subject:

Inspection

50-220/80-19

This refers to the routine inspection

conducted

by Mr. S.

Hudson of this office

on Nove'mber 2-December

15,

1980 at Nine Mile Point, Unit I, Scriba,

New York of

activities authorized

by

NRC License

No.

DPR-63 and to the discussions

of our

findings held by Mr. Hudson with Mr. T.

Roman of your staff at the conclusion of

the inspection.

The inspection

was

an examination of activities conducted

under your license

as

they relate to radiation safety

and to compliance with the ComIission's rules

and regulations

and the conditions of your license.

The inspection consisted of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

measurements

made by the inspector,

and observations

by the inspector.

~Our inspector also verified the steps

you have taken to correct the item of

noncompliance

brought to your attention in the enclosure. to our letter dated

June 5, 1980.

We have

no further questions

regarding your action at this time.

Within the scope

of. this inspection,

no items of noncompliance

were observed.

In accordance

with Section 2.790 of the

NRC'-s "Rules of Practice,"

Part 2, Title

10,

Code of Federal

Regulations,

a copy of this letter and the enclosed

inspection

report will be placed in the

NRC's Public Document

Room.

If this report contains

any information that'ou

(or your contractor) believe to be proprietary, it is

necessary

that you make

a written application within 20 days to this office to

withhold such information from public disclosure.

Any suc'h application mist be

accompanied

by an affidavit executed

by the owner of the information, which

'dentifies

the document

or part sought to be withheld, .and which contains

a

statement of reasons

which addresses

with specificity the items which will be

considered

by the Commission

as listed in subparagraph

(b) (4) of Section 2.790.

The information sought to be withheld shall

be incorporated

as far as possible

into a separate

part of the affidavit. If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document

Room.

e

5

' r

r

<<q

~1 gJ

-

P'

~ /

r

k I

Niagara

Mohawk Power Corpora tion

FF-81 1 )gst

No reply to this letter is required;

however, if you have

any questions

concerning

this inspection,

we will be pleased

to discuss

them with you.

'incerely,

o

. Brunner, Chief

Re

tor Operations

and Nuclear

S pport Branch

Enclosure:

Office of Inspection

and Enforcement

Inspection

Report

Number 50-220/80-19

cc w/encl:

M. Silliman, Acting General

Superintendent,

Nuclear Generation

T.

Roman, Station Superintendent

R. Abbott, Operations

Supervisor

E.

B. Thomas, Jr.,

Esquire