ML17053C485

From kanterella
Jump to navigation Jump to search
Responds to Submitting Guard Training & Qualification Plan.Review Indicates Need for Revisions & Addl Info.Comments Encl.Response Requested within 30 Days of Receipt of Ltr
ML17053C485
Person / Time
Site: Nine Mile Point 
Issue date: 03/24/1981
From: Ippolito T
Office of Nuclear Reactor Regulation
To: Dise D
NIAGARA MOHAWK POWER CORP.
References
NUDOCS 8103310155
Download: ML17053C485 (10)


Text

't1 g

I'ocket No.60-220 lt ~-

Mr. Donald P. Disc Vice President - Engineering Niagara Mohawk Power Corporation 300 Erie Boulevard West

Syracuse, New York 13202

Dear Mr. Disc:

Distribution:. -;-': '"

Docket File NRC PDR Local PDR ORB ¹2 Rdg D. Eisenhut OELD OISE (3)

T. Ippolito P.

Polk S. Norris NSIC TERA ACRS (10)

By letter dated August 17, 1979, Niagara Mohawk Power Corporation submitted the Nine Mile Point Nuclear Station Guard Training and gualification Plan.

Our initial review of this plan has indicated the need for revisions and additional information.

Our coiiments on the plan are identified in the enclosure.

Please provide'our response within 30 days of receipt of this letter.

Sincerely, Original Signed bg X. A. lppoiito Thomas A. Ippolito, Chief Operating Reactors Branch ¹2 Division of Licensing

Enclosure:

Coments cc w/encl:

See next page oi g$

Spying)g 3

ulflteaa 00Atrr,~~~egg 81033 y OFFICEI

,SURNAME/

0AVEf>

'L:ORB¹2

..ppo.lk;Itive.....

3/g8,/81

~

OV1 0 ~ K ~ ~ ~ ~ ~ ~ ~ ~ \\ ~

DL:

R ¹

..TA?Qp9.13 o...

37).

/81

~ ~ ~

'W 0

~

~

~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~

NRC FORM 318 00180) NRCM 0240 OFFICIAL RECORD COPY

  • USGPO'9~29424

f 0

'E

/< ws s

v

~ ~M

'1 I

I h

/

e

i QpR REGII

~c,"

0

~g 1~

+~

~0

~>>*w +

Docket No. 50-220 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 March 24, 1981 Mr. Donald P. Disc Yice President Engineering Niagara Mohawk Power Corporation 300 Erie Boulevard Hest

Syracuse, New York 13202

Dear Mr. Disc:

By letter dated August 17, 1979, Niagara Mohawk Power Corporation submitted the Nine Ilile Point Nuclear Station Guard Training and gualification Plan.

Our initial review of this plan has indicated the need for revisions and additional information.

Our comments on the plan are identified in the enclosure.

Please provide your response within 30 days of recei pt of this letter.

Sincerely, I

~If<~ ~

>/cv'-'

homas A. Ippolito, Chief Operating Reactors Branch k'2 Division of Licensing

Enclosure:

Comments cc w/encl:

See next page

Mr. Donald P. Disc CC:

Eugene B. Thomas, Jr., Esquire

LeBoeuf, Lamb, Leiby 8 MacRae 1333 New Hampshire
Avenue, N.

W.

Suite 1100 Washington, D. C.

20036 State University College at Oswego Penfield Library - Documents

Oswego, New York 13126 Mr. Joseph J.
Sunser, Manager System Security Niagara Mohawk Power Corporation 300 Erie Boulevard West
Syracuse, New York 13202 Resident Inspector c/o U.S.

NRC P. 0.

Box 126

Lycoming, New York 13093 (Security matters only)

~

~

Coiii!ENTS ON NINE iirLE POINT GUARD TRAINING PLAN Our review of the plan indicates that several revisions are required before the plan can be accepted.

1. ".. 1. 3. 2 Delete the sentence, "Plastic lenses will be considered acceptable."

1.2.1.7 Add to this section a commitment that the demonstration of performance will reflect both normal and emergency operations.

1.2. 1.8 Add to this section a commitment that resumption of duties is also based

.o!i the individual's ability to perform security job duti es.

1.3.1 1.3.2 Revise these sections to commit to the requirements of Part 73, Appendix B.I.C.

Add to this sectioi a commitment that all documentation will be retained on site for a period of at least 2 years.

2.1.1 Add to this section a commitment that the qualification records for each individual shall be documented and attested to by a licensee security supervisor.

2.2.4 Add to this section a commitment that all records will be retained on site for a period of at least 2 years.

2.3 Revise the third paragraph to reference section 2.2.4 of'he plan.

2.4 3.1.1.1 Revise the second paragraph to reference section 2.2.4 and 2.2.5 of the plan.

Commit to firing the NRA National Police Course or the NRA 25 yard course.

In addition, provide a chart indicating distances, positions, number of rounds and stage times.

3.1.2.1 Commit to using the B-27 target for qualification.

Additional Information Add to Chapter 3

a commitment to include the information required in Part 73 Appendix B.V.A.4 and 5.

Performance Obiectives Task 01 Commit to having the guard adjust and test the metal detector prior to conducting the search to ensure that it is working properly.

In addition, include a statement upon the action the guard takes if unauthorized materials are found.

ENCLOSURE

~

a n

Task 03 Include a statement upon the action that the guard takes if unauthorized ma teri al s are found.

Task 04 Commit to having the Access Contro'I Officer maintain access logs in accordance with 10 CFR 73.55(d)(6) and site procedures.

.In addition, coliimit to having the Access Control Officer ensure that an authorized escort is provided for visitors and that the visitor is briefed on emergency procedures.

Task 03 Corimit to having the escort guard ensure that access to only authorized areas are permitted and that the CAS/SAS are notified if unauthorized activities occur.

lask 10 Commit to having the vehicle escort guard ensure that access routes are not violated and that unauthorized materials are not loaded or unloaded.

Task 13 Commit to having the CAS/SRS operators ensure that access logs are annotated and that Security System malfunct'ions are recognized.

Task 17 I

Commit to having the response guard ensure that any barrier or security door found unlocked or breached is secured.

In addition, commit to having the response guard inspect v.'t<al equipment for indications of tampering or sabotage.

Additional Tasks Add a task to describe the training w)iich guards receive on searching packages being brought into the protected area, relative to the require-ments of 10 CFR 73.55(d)(3) and (4).

MAR 2 6 1981