Forwards IE Insp Rept 50-410/80-11 on 801021-23 & 1104-06 & Notice of Violation
ML17053C478
Person / Time
Site: Nine Mile Point 
Issue date: 12/17/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rhode G
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17053C476 List:
References
NUDOCS 8103300011
Download: ML17053C478 (4)


See also: IR 05000410/1980011

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

631 PARK AVENUE

KING OF PRUSSIA PENNSYLVANIA19406

Docket No.

50-410

SEC

-"

~ 'ii~

Niagara

Mohawk Power Corporation

ATTN:

Hr. Gerald

K.

Rhode

Vice President

System Project

Management

c/o Miss Catherine

R. Seibert

300 Erie Boulevard, Hest

Syracuse,

New York

13202

Gentlemen:

Subject:

Inspection

No. 50-410/80-11

This refers to the routine inspection

conducted

by Hr.

R. Feil of this office on

October 21-23 and

November 4-6,

1980, at Nine Mile Point Nuclear

Power Station,

Unit 2, Scriba,

New York of actiyiti.es authorized

by

NRC License

No.

CPPR-112

and to the discussions. of'ur findings held

by Mr.

R. Feil with Hr. J. Dillon of

your staff at the conclusion of the inspection,

and to

a subsequent

telephone

di.scussion

between

Hr.

R.

Fei.l. and Hr. J. Dillon on November 17,. 1980.

~

~

~

~

~

~

~

~

~

~

~

Areas examined during this inspection

are described in the Office of Inspection

and Enforcement

Inspection

Report i~hich is enclosed with this letter.

Within

these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interyi.ews with personnel,

and observations

by the

inspectot.

Based

on the results of thi,s inspection, it appears

that one of your activities

was not conducted in full compliance with

NRC requirements,

as set forth in the

Notice of Violation,'nclosed

herewith

as

Appendix A.

This item of noncom-

pliance

has

been categori,zed

into the levels

as described

in ogr correspondence

to you dated

December

31,

1974.

This notice is sent to you pursuant

to the

proyisions of Section

2.201 of the

NRC's

"Rules of Practice," Part 2, Title 10,

Code of Federal

Regulations.

Section

2. 201 requires

you to submit to this

office, within thirty (30} days of your receipt of this noti.ce,

a written state-

ment or explanation in reply including:

('1} corrective

steps. which have

been

taken

by you and the. results

achi.eyed;

(2) corrective steps

whi ch wi11

be taken

to avoid further i'tems of noncompliance;

and (3) the date

when full compliance

will be achieyed.

In addi tion to the

need for cot.rective action regarding this specific item of

noncompliance,

we are concerned

about the implementation of your quality assur-

ance

program that permitted it to occur.

The apparent

breakdown

i'n quality

assurance

appears

to be in youp contractors

system;

howeyer,

we are a)so

Concerned with the interface

between your gA organization

and the contractor

which did not detect

the breakdown in the contractors

system.

Consequently,

8108300 Oz x

~ .

0

Niagara

Hohawk Power Corporati'on

in your reply, you should describe in particular,

those actions

taken or planned

to improve the effectiveness

of your quality assurance

program.

In accordance

with Section

2.790 of the

NRC's "Rules of Practice,"

Part 2, Title

1 0,

Code of Federal

Regulations-,

a copy of thi s letter .and the enclosures will

be placed in the NRC's Public Document

Room.

If this report contains

any

information that you (or your contractor)

believe to be proprietary, it is

necessary

that you make

a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must

be

accompanied

by an affidavit executed

by the owner of the information, which

identifies the document or part sought to be withheld,

and which contains

a

statement of reasons

which addresses

with specificity the items which will be

considered

by the Commission

as listed in subparagraph,(b)

(4) of Sectio'n

2.790.

The i.nformation sought to be withheld shall

be incorporated

as far as possible

i.nto a separate

part of the affidavi.t. If we do not hear

from you in this

regard within the specified period, the report will be placed in the Public

Document

Room.-

Should you have

any questi:ops-

concerni'ng this inspection,

we will be pleased

to

discuss

them wi.th you.

Si.ncerely,

Enclosures:

1.

Appendix A, Notice of violation

2.

Office of Inspection

and Enforcement

Inspection Report

No.

50410/8011

cc w/encl:

Eugene

B. Thomas, Jr.,

Esqui.'re

Robert T. Carlson,

Chief

Reactor Construction

and Engineeri.ng