Docket No. 50-220
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
6SI PARK AVENUE
KING OF PRVSSIA, PKNNSYI VANIA 19406
OCT 01 1980
~gi~( ftCKL
Niagara
Mohawk Power Corporation
ATTN:
Mr. T.
E.
Lempges
Yice President
Electric Operations
300 Erie Boulevard West
Syracuse,
13202
Gentlemen:
Subject:
Inspection
No. 50-220/80-09
A
i.j<
1
C)
This refers to the routine inspection
conducted
by Mr.
R. A. McBrearty of this
office on September
8-11,
1980, at Nine Mile Point Unit 1 Nuclear Generating
Station, Scriba,
New York of activities authorized
by
NRC License
No.
and to the discussions
of our findings held by Mr. McBrearty with Mr. T.
Roman
of your staff at the conclusion of the inspection.
Areas
examined during this inspection
are described
in the Office of Inspection
and Enforcement Inspection
Report which is enclosed with this letter.
Within
these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observations
by the
inspector.
Within the scope of this inspection,
no items of noncompliance
were observed.
In accordance
with Section 2.790 of the
NRC's "Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document
Room.
If this
report contains
any information that you (or your contractor)
believe to be
proprietary, it is necessary
that you make
a written application within 20 days
to this office to withhold such information from public disclosure.
Any such
application must
be accompanied
by an affidavit executed
by the owner of the
information, which identifies the document or part sought to be withheld, and
which contains
a statement of reasons
which addresses
with specificity the items
which will be considered
by the Commission
as listed in subparagraph
(b} (4} of
Section 2.790.
The information sought to be withheld shall
be incorporated
as
far as possible into a separate
part of the affidavit. If we do not hear from
you in this regard within the specified period,
the report will be placed in the
Public Document
Room.
Ik
Niagara
Mohawk Power Corporation
No reply to this letter is required;
however,
should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
Enclosure
Robert T. Garison,
Chief
Reactor Construction
and Engineering
Support
Branch
cc w/encl:
T. J. Perkins,
General
Superintendent,
Nuclear Generation
T.
Roman, Station Superintendent
R. Abbott, Operations
Supervisor
E.
B.
Thomas, Jr., Esquire