ML17053B958

From kanterella
Jump to navigation Jump to search
Forwards Revision 1 to IE Bulletin 79-26, Boron Loss from BWR Control Blades. Written Response Required
ML17053B958
Person / Time
Site: Nine Mile Point 
Issue date: 08/29/1980
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lempges T
NIAGARA MOHAWK POWER CORP.
References
NUDOCS 8009230495
Download: ML17053B958 (4)


Text

~, <gS Argy 0

OO

++*<<+

Docket No. 50-220 NUCLEAR REGULATORY COMMISSION REGION I 631 PARK AVENUE KING OF PRUSSIA, PENNSYLVANIA19406 August 29, 1980 Niagara Mohawk Power Corporation ATTN:

Hr. T.

E.

Lempges Vice President Nuclear Generation 300 Erie Boulevard Mest

Syracuse, New York 13202 Gentlemen:

Enclosed is IE Bulletin No. 79-26, Revision 1, which requires action by you with respect to your nuclear power facility(ies).

The original IE Bulletin No. 79-26 has been revised to adjust the required completion date for reporting the results of examination of an exposed control blade and to correct a typographical error.

The revision is identified by use of "Rl" in the right margin.

In order to assist the NRC in evaluating the value/impact of each Bulletin on licensees, it would be helpful if your would provide an estimate of the manpower expended in conduct of the review and preparation of the report(s) required by the Bulletin.

Please estimate separately the manpower associated with corrective actions following identification of problems through the Bulletin.

Should you have any questions regarding the Bulletin or actions required by you, please contact this office.

Sincerely, yce H. Grier ector

Enclosures:

1.

IE Bulletin No. 79-26, Revision j.

2 ~

List of Recently Issued IE Bulletins CONTACT:

D.

L. 'Caphton (215-337"5266) g5 8009gS 04

Niagara Nohawk Power Corporation 2

cc w/encls:

'T. J. Perkins, General Superintendent, Nuclear Generation T.

Roman, Station Superintendent R. Abbott, Operations Supervisor E.

B. Thomas, Jr.,

Esquire

0 4