ML17053A605
| ML17053A605 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 03/27/1979 |
| From: | Ippolito T Office of Nuclear Reactor Regulation |
| To: | Dise D NIAGARA MOHAWK POWER CORP. |
| References | |
| NUDOCS 7904170435 | |
| Download: ML17053A605 (5) | |
Text
(4I.
Distribution
+ocket ORB ¹3 NRR Reading Local PDR NRC PDR HDenton VStello DEisenhut BGrimes RVollmer
-, TJCarter
'HRussell OIGE (3)
TIppol ito PPol k SShepard TERA JRBuchanan ACRS (16)
GLainas VNoonan HOldstead, OELD RAchitzel, Reg.
1 MARCH 2 7 1979 Docket No. 50-220 Hr. Donald P. Disc Vice President - Engineering Niagara Hohawk Power Corporation 300 Erie Boulevard i<est
- Syracuse, New York 13202
Dear Hr. Disc:
~~
r By communications with both the NRC Office of Inspection and Enforcement and with Niagara Hohawk licensing personnel it has come to the staff's attention that you plan to modify, without NRC review and approval, two Nine Hile Point Unit 1 s'afety related systems.
The proposed'odifi-cations affect:
(1) the Core Spr ay System by the installation of-bypass lines around HOV's IV 40.01, 40.09, 40.10 and 40.11 and (2) the Reactor Protection System by the installation of the'Analog Transmitter/Trip Unit System (ATTUS).
At this time you are advised that the aforementioned activities are being initiated at your own financial, risk.
Installation should'ot commence unless these activities are fully in compliance with the rules and regu-lations of the Commission, particularly 10 CFR ~0.59 and the Nine Hile Point Unit 1 Operating License.
In order that we may be kept fully informed of the exact nature of 'these deter1ninations, we request that you send us copies of your written safety evaluations which provide the basis, for, your conclusion that such activities are permissible without prior NRC authorization.
These safety evaluations should be forwarded to us in advance of your commencement of any installation activity.
llith respect to the Core Spray System modifications, your safety evaluatio
, should include, but not be limited to, the following items:
(1) piping
-stress
- analyses, (2) pipe break/pipe i>hip analysis, (3)'ystem flow balance with bypass both open and Hosed, (4) 'water hammer analysis, (5) revised drawings and valve line-up lists, (6) revised Technical Specifications, (7)
ASHE B5PV Code requirements, (8) most recent re'suits for tests conducted in accordance with Technical Specification 4.1.4, and (9) results of the Core Spray Sparger leakage test.
7 904 1.70 43'ith respect to the ATTUS instal 1 ation, your safety evaluations should include, but not be limited to;- the following items:
(1) interface information as delineated in Section 5.4 of NEDO-21617-1 dated January
'978, (2) environmental qualification for normal, abnormal and accident orrIce~
OIIRNAI4IC~
OATRW i
~I ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~
OI ~ ~
~
~ ~ ~
~
~
~
~ ~ ~
~ ~ ~ \\ ~
~
~
~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~
NRC PORM 516 (9.76) NRCM 0240 0 U Oe OOVONNMONT rNINTINO OrrICOI I ~ 7 ~
tOI TO ~
0 f +
h bt I
Mr. Donald P. Disc tNRCH conditions as defined by Standard Review Plan 3.11 (Rev. 1), (3) effe'ct on the capability to assess plant conditions during and follow>ing an
- accident, (4) effect on the Reactor Protection
- System, (5) sepal ation criterion, (6) Fire Protection criteria and (7) Revised Technical Specifications.
Please be advised that the Office of Inspection and Enforcement has been requested to monitor installation activities at Nine Mile Point Unit 1.
In addition, please advise us, at the earliest possibl'e date, of your intentions in"order to assure the timely approval of your Reload 7
application submitted November 20, 1978.
If we can be of further assistance, please advise.
Sincerely, Th<QN %. fppolffo, Chief Operating Reactors Branch P3 Division of Operating Reactors cc:
See next page OPPICC~
CURIIAMC~
DATC~
ORB 83
...;.P.P.Q3. k:.N3.f.
3+ /79 3/JI7/79 EB VNoona 3~/79 r'~
3/~79 0
~
~
~ ~ ~ ~
p ito
'""3f""f79"'
0 D
lmstead
""'3%'j779'""
N'ORbf 91$ (976) NRCbK 0240 0 V 0 OOVCRRMCHT tRIIITIIIOOtRICCI Iep ~
ee ~
1 ~ e
~ ~
0 I
e e
h h
~
h j I
r I
II I
I
~ 1
/
'll Ii I'i w ~ 4
~
h t
% r I
)
I'gf E I
I Ii
Niagara Nohawk Power Corporation'larch 27 1979 cc:
Eugene B. Thomas, Jr.,
Esquire
- LeBoeuf, Lamb, Leiby h NacRae 1757 N Street, N.
W.
Washington, 0;
C.
20036 Anthony Z. Roisman Natural Resources Defense Council 917 15th Street, N.
W.
'Washington, D.
C.
20005 Oswego County Office Building 46 E. Bridge Street
- Oswego, New York 13126