Category:Inservice/Preservice Inspection and Test Report
MONTHYEARML23229A5262023-08-17017 August 2023 Inservice Inspection Summary Report - 1 RE24, ML23221A3002023-08-0909 August 2023 RE22 Inspection Summary Report for Steam Generator Tubinq, Rev. 1 (Epld L-2023-LRO-0029) ML23044A6192023-02-13013 February 2023 Summary Report for Inservice Inspection (2RE22) Completed in November 2022 ML22033A5442022-02-0202 February 2022 Inservice Inspection Summary Report -1RE23 NOC-AE-21003819, Inservice Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 ML21196A4922021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003806, Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval2021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval ML21144A1092021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval NOC-AE-20003765, Inservice Testing Program Description for the Fourth Ten-Year Interval2020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval ML20303A2602020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval NOC-AE-20003764, 1 RE22 Inspection Summary Report for Steam Generator Tubing2020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing ML20281A8542020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing ML20191A2702020-07-0909 July 2020 Inservice Inspection Summary Report -1RE22 NOC-AE-20003700, Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-01)2020-01-22022 January 2020 Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-01) NOC-AE-20003703, Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-04)2020-01-22022 January 2020 Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-04) NOC-AE-19003696, Supplemental Information for Proposed Alternative to ASME Code Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) EPID: L 2019-LLR-0096)2019-11-26026 November 2019 Supplemental Information for Proposed Alternative to ASME Code Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) EPID: L 2019-LLR-0096) NOC-AE-19003620, Proposed Alternative for Extension of Volumetric Examination Interval for Reactor Vessel Closure Head with Alloy 690 Nozzles in Accordance with 10 CFR 50.55a(z)(1) (Relief Request RR-ENG-3-23)2019-02-28028 February 2019 Proposed Alternative for Extension of Volumetric Examination Interval for Reactor Vessel Closure Head with Alloy 690 Nozzles in Accordance with 10 CFR 50.55a(z)(1) (Relief Request RR-ENG-3-23) NOC-AE-19003624, Inservice Inspection Summary Report- 1RE212019-02-0707 February 2019 Inservice Inspection Summary Report- 1RE21 NOC-AE-18003603, Transmittal of 2RE19 Inspection Summary Report for Steam Generator Tubing2018-10-18018 October 2018 Transmittal of 2RE19 Inspection Summary Report for Steam Generator Tubing NOC-AE-18003587, Inservice Inspection Summary Report -2RE192018-07-25025 July 2018 Inservice Inspection Summary Report -2RE19 NOC-AE-17003503, Inservice Inspection Summary Report - 1 RE202017-07-20020 July 2017 Inservice Inspection Summary Report - 1 RE20 NOC-AE-17003440, Inservice Inspection Summary Report -2RE18 Completed in November 20162017-02-0808 February 2017 Inservice Inspection Summary Report -2RE18 Completed in November 2016 NOC-AE-16003364, 1RE19 Inspection Summary Report for Steam Generator Tubing2016-04-25025 April 2016 1RE19 Inspection Summary Report for Steam Generator Tubing NOC-AE-16003355, Inservice Inspection Summary Report, 1RE192016-03-24024 March 2016 Inservice Inspection Summary Report, 1RE19 NOC-AE-15003282, Inservice Inspection Summary Report -2E172015-08-0606 August 2015 Inservice Inspection Summary Report -2E17 NOC-AE-14003170, Inservice Inspection Summary Report - 1 RE182014-08-26026 August 2014 Inservice Inspection Summary Report - 1 RE18 NOC-AE-14003139, RE16 Inspection Summary Report for Steam Generator Tubing2014-05-22022 May 2014 RE16 Inspection Summary Report for Steam Generator Tubing NOC-AE-14003112, Inservice Inspection Summary Report - 2RE162014-03-24024 March 2014 Inservice Inspection Summary Report - 2RE16 NOC-AE-13002968, Inservice Inspection Summary Report - 1RE172013-02-21021 February 2013 Inservice Inspection Summary Report - 1RE17 NOC-AE-12002803, Inservice Inspection Summary Report - 2RE152012-02-20020 February 2012 Inservice Inspection Summary Report - 2RE15 NOC-AE-11002722, RE16 Inspection Summary Report for Steam Generator Tubing2011-09-21021 September 2011 RE16 Inspection Summary Report for Steam Generator Tubing NOC-AE-11002706, Inservice Inspection Summary Report - 1RE162011-07-28028 July 2011 Inservice Inspection Summary Report - 1RE16 NOC-AE-11002651, Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval2011-03-14014 March 2011 Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval NOC-AE-10002585, Inservice Inspection Summary Report - 2RE142010-08-0202 August 2010 Inservice Inspection Summary Report - 2RE14 NOC-AE-10002577, Notification of Upgrading of the Inservice Inspection Program for the Third Inspection Interval2010-07-29029 July 2010 Notification of Upgrading of the Inservice Inspection Program for the Third Inspection Interval NOC-AE-10002565, Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval2010-07-13013 July 2010 Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval NOC-AE-11002684, Categorization of Risk-Informed Piping2010-06-20020 June 2010 Categorization of Risk-Informed Piping ML1006401202010-02-22022 February 2010 Inservice Testing Program Description for the Third 10-Year Interval NOC-AE-10002522, Inservice Inspection Summary Report - 1RE152010-02-16016 February 2010 Inservice Inspection Summary Report - 1RE15 NOC-AE-09002408, Transmittal of 2RE13 Inspection Summary Report for Steam Generator Tubing2009-03-24024 March 2009 Transmittal of 2RE13 Inspection Summary Report for Steam Generator Tubing NOC-AE-09002381, Inservice Inspection Summary Report - 2RE132009-01-20020 January 2009 Inservice Inspection Summary Report - 2RE13 NOC-AE-08002318, Inservice Inspection Summary Report - 1RE142008-06-23023 June 2008 Inservice Inspection Summary Report - 1RE14 NOC-AE-07002195, Inservice Inspection Summary Report - 2RE122007-07-25025 July 2007 Inservice Inspection Summary Report - 2RE12 NOC-AE-07002143, 1RE13 Inservice Inspection Summary Report for Steam Generator Tubing2007-04-16016 April 2007 1RE13 Inservice Inspection Summary Report for Steam Generator Tubing ML0701602012007-01-0808 January 2007 Inservice Inspection Summary Report - IRE13 NOC-AE-06001960, Inservice Inspection Summary Report2006-01-19019 January 2006 Inservice Inspection Summary Report NOC-AE-05001938, Refueling Outage Inservice Inspection Results for Steam Generator Tubing2005-10-12012 October 2005 Refueling Outage Inservice Inspection Results for Steam Generator Tubing NOC-AE-05001910, Inservice Inspection Summary Report - 1RE122005-07-15015 July 2005 Inservice Inspection Summary Report - 1RE12 NOC-AE-05001853, Revised Steam Generator Tube Inservice Inspection Plan for the Second Inspection Interval at Plant2005-03-0303 March 2005 Revised Steam Generator Tube Inservice Inspection Plan for the Second Inspection Interval at Plant NOC-AE-04001763, Inservice Inspection Summary Report for Welds and Component Supports - 2RE102004-07-22022 July 2004 Inservice Inspection Summary Report for Welds and Component Supports - 2RE10 2023-08-09
[Table view] Category:Letter type:NOC
MONTHYEARNOC-AE-240040, Nuclear Liability Certificates of Insurance2024-03-19019 March 2024 Nuclear Liability Certificates of Insurance NOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) NOC-AE-220039, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 252023-02-0606 February 2023 Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 25 NOC-AE-220038, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2022-06-23023 June 2022 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask NOC-AE-210038, Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 252022-01-0404 January 2022 Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 25 NOC-AE-21003858, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes2021-12-0606 December 2021 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes NOC-AE-21003853, Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-12-0303 December 2021 Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003848, Unit 1 Cycle 24 Core Operating Limits Report2021-11-18018 November 2021 Unit 1 Cycle 24 Core Operating Limits Report NOC-AE-21003846, Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-11-0404 November 2021 Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003842, 10 CFR 50.59 Summary Report2021-09-23023 September 2021 10 CFR 50.59 Summary Report NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25)2021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) NOC-AE-21003832, Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-0909 September 2021 Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003812, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-08-10010 August 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003825, Update of Foreign Ownership, Control, or Influence Information (FOCI)2021-08-0505 August 2021 Update of Foreign Ownership, Control, or Influence Information (FOCI) NOC-AE-21003824, Update Foreign Ownership, Control, or Influence (FOCI)2021-07-29029 July 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003823, Update Foreign Ownership Control or Influence (FOCI)2021-07-28028 July 2021 Update Foreign Ownership Control or Influence (FOCI) NOC-AE-21003820, Nuclear Insurance Protection2021-07-20020 July 2021 Nuclear Insurance Protection NOC-AE-21003819, Inservice Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003816, Commitment Change Summary Report2021-06-30030 June 2021 Commitment Change Summary Report NOC-AE-21003814, Technical Specification Bases Control Program2021-06-24024 June 2021 Technical Specification Bases Control Program NOC-AE-21003810, Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy NOC-AE-21003811, Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy NOC-AE-21003806, Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval2021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval NOC-AE-21003801, Annual Dose Report for 20202021-04-26026 April 2021 Annual Dose Report for 2020 NOC-AE-21003802, 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report2021-04-26026 April 2021 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003800, Radioactive Effluent Release Report2021-04-19019 April 2021 Radioactive Effluent Release Report NOC-AE-21003799, Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2021-04-15015 April 2021 Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan NOC-AE-21003795, Cycle 22 Core Operating Limits Report2021-04-15015 April 2021 Cycle 22 Core Operating Limits Report NOC-AE-21003796, Update Foreign Ownership, Control, or Influence (FOCI)2021-04-15015 April 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003790, Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter)2021-03-31031 March 2021 Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter) NOC-AE-21003791, Financial Assurance for Decommissioning - 2021 Update2021-03-31031 March 2021 Financial Assurance for Decommissioning - 2021 Update NOC-AE-210037, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-21003792, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-200037, License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications2021-03-11011 March 2021 License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications NOC-AE-21003784, Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing2021-03-0808 March 2021 Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-21003786, Annual Fitness for Duty Performance Report for 20202021-03-0101 March 2021 Annual Fitness for Duty Performance Report for 2020 NOC-AE-21003785, Evidence of Financial Protection2021-02-23023 February 2021 Evidence of Financial Protection NOC-AE-21003781, Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts2021-01-27027 January 2021 Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts NOC-AE-21003780, Submittal of Update Foreign Ownership, Control, or Influence (FOCI)2021-01-0707 January 2021 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-20003778, Changes to South Texas Project Electric Generating Station Emergency Plan2020-12-17017 December 2020 Changes to South Texas Project Electric Generating Station Emergency Plan NOC-AE-20003777, STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency2020-12-10010 December 2020 STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency NOC-AE-20003766, Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan2020-12-0202 December 2020 Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan NOC-AE-20003767, Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-16016 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic NOC-AE-20003765, Inservice Testing Program Description for the Fourth Ten-Year Interval2020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval NOC-AE-20003764, 1 RE22 Inspection Summary Report for Steam Generator Tubing2020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-20003762, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen2020-09-22022 September 2020 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen NOC-AE-20003761, Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic2020-09-10010 September 2020 Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic 2024-03-19
[Table view] |
Text
South Texas Project Electric Ge11erati11g Station P.O Bar 28JJ Wadsworth. Texas 77481 February 8, 2017 NOC-AE-17003440 10 CFR 50.55(a)
U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 South Texas Project Unit 2 Docket No. STN 50-499 lnservice Inspection Summary Report - 2RE18 Attached is the South Texas Project Electric Generating Station Unit 2 summary report for inservice inspections performed prior to and during scheduled refueling outage 2RE18 completed in November 2016. This summary report satisfies the reporting requirements of ASME Code Section XI, Article IWA-6230.
There are no commitments in this letter.
If there are any questions regarding this report, please contact Wendy Brost at (361) 972-8516 or me at (361) 972-4997.
- y A. Atkins nager, Systems Engineering web
Attachment:
Summary Report for the 2RE18 lnservice Inspection of Unit 2 South Texas Project Electric Generating Station STI: 34438303
NOC-AE-17003440 Page 2 of 2 cc:
(paper copy) (electronic copy)
Regional Administrator, Region IV Morgan. Lewis & Beckius LLP U.S. Nuclear Regulatory Commission Steve Frantz, Esquire 1600 East Lamar Boulevard Paul Bessette Arlington, TX 76011-4511 U.S. Nuclear Regulatory Commission Lisa M. Regner Lisa M. Regner Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North (08H04) NRG South Texas LP 11555 Rockville Pike Chris O'Hara Rockville, MD 20852 Jim von Suski!
Skip Zahn*
NRC Resident Inspector U.S. Nuclear Regulatory Commission CPS Energy P. 0. Box 289, Mail Code: MN116 Kevin Pollo Wadsworth, TX 77483 Cris Eugster L.D. Blaylock City of Austin Elaina Ball John Wester Texas Dept. of State Health Services Richard A Ratliff Robert Free
. . NOC-AE-17003440 .*
SUMMARY
REPORT
2RE18 . ' . .
INSERVICE INSPECTION ...
TEXAS PROJECT ELECTRIC . GENERATING STATION: .
Nuclear Operating Company STP NUCLEAR OPERATING COMPANY October-November 2016
I
NOC-AE-17003440 Page 2 of10 COVER SHEET * * .
I : ._:* .*.
- = :*
I . :::
>2~E18 INSERVICE INSPECTION
SUMMARY
REPORT ..
I I
I I! . SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT 2
. P.O. BOX 289 I,,...
WADSWORTH,.TEXAS77483 USNRC DOCKET NO: 50-499 I!.
I OPERATING LICENSE. NO: NPF.-80 COMMERCIAL O~ERATION DATE: June 19, 1989 Date February 01, 2017 Date February,01, 2017 . . .
ervisor EngineeringTesting/Programs
Attachment
. NOC-AE-17003440
. Page 3 of 10 SCOPE.*
COMPONENTSUPPORTS (IWF), CONTAINMENT METAL LIN.E.R (IWE), REPAIR AND REPLACEMENT, AND WELD INSPECTION PROGRAMS (IWB, IWC, IWD)
Th~ e~aminatlons ~ummarized in this report were performed in accordance withthe 2004 ~dition of the ASME Code,.Section XI that is appiicable. to* the South Texas .Project,
- Uhit 2, third ten~year interval (10/19/2010-10/18/2020), second period (01/01/2014-12/18/2016): Tt;iis report covers selected ASME *
Examinations and tests required by the Code are scheduled in accordance with "Inspection Program B" as defined in IWB-2412 for ASME Code Class 1 Systems/Components, IWC-2412 for ASME Code Class 2 Systems/Components and IWQ-2412 for ASME Code Class 3 Systems/Components and IWF-2410, component supports.. * *
- ASME Code Class 1 components were examined as prescribed by Table IWB-2500-1 and the applicable .
.. Examination Categories, which establish the examination method and frequency. Likewise, the ASME .
Code Class 2, 3, and Component Supports were examined in accordance with Tables IWC-2500-1, IWD-
~500-1, and IWF-2500-1, respectively.
The Containment Metal Liner examinations. summarized in this report were performed in accordance with the 2004 Edition of the ASME Code,Section XI, which is applicable to the South Texas Project, Unit 2, .
second ten-year interval (09/09/2009-09/08/2019), third period (09/09/2016-09/08/2019). This report covers selected ASME Code Class CC liner & MC Components.
- Examinations. and tests required by the Cod.e are scheduled in accordance with. "Inspection Program B" as defined in IWE-2412 for ASME Code Class CC liner & MC Components. The Containment Metal Liner
- Components were examined in accordance with Table IWE-2500-1, and applicable Examination Categories.
Plant South Te)(as Project Electric Generating Station
. Unit No. _ _ _2_ _ _ _Commercial service date
- June 19 1989 Refueling outage no, 2RE18 (lfapplic"able)
Current inspection interval IWB 1\.vc lWD IWF - 3'd ; !WE _znd - - - - - - -
"(l", 2*d, 3n1, 41h, other)
Current inspection period IWB IWC IWD TWF -2nd_; !WE _3n1_ ----.---,-,,.-,--,,------~-----
(1", 2*d, 3'd)
Edition and Addenda of Section XI applicable to the inspection plan . 2004 Date and revision of inspection plan Aprii"<l4. 2614 I Revision 7, Supplement #2 Edition and Addenda of Section XI applicable to repairs/replacement activities, if different than the inspection plan N/A Code Cases used: N-532-4 N578-1 N-722-1 N-770-1 CERTIFICATE OF CONFORMANCE .
. I certify th.at (a) the statements mad.e in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of *
- ---2RE*i*s * --~o~t'~~.;;10*i*h~;~q~i;e~~~-tiois~~1;c;*~-xi:- *** * - . ** ** * * * ---**- -------- - **-
<Reru *ling outage number Date Fdl ];. ,'W*"I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and pressure Vessel Inspectors and the State or Province of Texas and employed by ABS Boiler & Marine Insurance Co. of Houston. Texas have inspected the items described i.n this Owner's Activity Report, and state that, to the. best of my knowledge and belief, the Owner has perfonned all activities represented by this repo1t in accordance with the requirements of Section XL
- By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repairs/
replacements activities :ind evaluation described this report. Furthennore, neither the inspector nor his employer shall be liable in any manner for any personal inju or property damage or a loss of any kind arising from the connected with this inspection.
Commissions.-~~X:--~2-=--s___ d, ____*_.___
National Ifoard, State; Province, and Endorsements Date
Attachment NOC,.AE-17003440 Page 5of10
. TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE.
2RE18
- October-November 2016 Examination Item Item Evaluation Description Cateqorv Number Description
- F-A F1 .20B ISi INSPECTION OF FEEDWATER 16-13429 (FW) SYSTEM VARIABLE SPRING
. ' HANGER FW2031 HL5001
(
SUMMARY
- 222600) IDENTIFIED ONE OF TWO SPRINGS BROKEN. LINE NO.
18"FW-2031-AA2 LOCATED IVC TRAIN C/ROOM 301 47' ELEVATION.
F-A F1 .20B CR 16-13505 ISi INSPECTION OF. COMPONENT IS PART OF.
.. FEEDWATER (FW) SYSTEM EXPANDED ISi SCOPE REF. CR VARIABLE SPRING HANGER 16-13429 FW2029HL5001 (ISi
SUMMARY
222200) IDENTIFIED TWO OF TWO SPRINGS AS BROKEN. LINE NO.
18"FW-2029-AA2 ,LOCATED IN IVC/ A TRAIN I 47' ELEVATION.*
F1 .20B CR 16-13507 ISi INSPECTION OF COMPONENT IS PART OF
.. EEEDWA1EH_(EVV.).SXSTEM. ... ... _EXl?Al'NDED..ISL.SCOP.E REF. CR VARIABLE SPRING HANGER 16-13429 FW2032HL5001 (ISi
SUMMARY
222800) IDENTIFIED ONE OF TWO
$PRINGS BROKEN. LINE NO. 18"FW-2Q32-AA2 LOCATED IN IVC/ D TRAIN I 47' ELEVATION.
F-A . F1 .20B CR 16-13429 ISi INSPECTION OF COMPONENT IS PART OF FEEDWATER(FW)SYSTEM EXPANDED ISi SCOPE REF. CR VARIABLE SPRING HANGER 16-13429 FW2030HL5001 (ISi
SUMMARY
222400), IDENTIFIED ONE OF TWO SPRINGS BROKEN. LINE NO. 18"FW-
- 2030-AA2 LOCATED IN IVC/ B TRAIN I 47' ELEVATION NOTES:
- 1. Surveillance procedure OPSP11-RC-0015 Revision 17, ASME Section XI lnservice Inspection,.
documents lnser-Yice' Inspection activities during 2RE18.
NOC-AE-17003440 ..
Page 6of10 TABL$ 2 ABSTRACT OF REPAIRS/REPLACEMENT ACTIVITIES REQUIRED FOR coN;TINUED SERVICE 2RE1;8 October-November 2016 SYSTEM CODE CORRECTIVE . ITEM DATE REPAIR/REPLACEMENT CLASS MEASURE DESCRIPTION DESCRIPTION dF WORK COMPLETED PLAN NUMBER 1
3 REPLACEMENT BOLTING CHILLED REPLACED CORRODED BOLTING FLANGE 05/24/2015 2-12-064
.... WATER FASTENER ON ~INES CH-2300-WA3 AND CH-2343-WA3 3 REPLACEMENT BOLTING CHILLED REPLACED DAMAGE/CORRODED 05/24/2015 2-13-044
- WATER EVAPORATOR WATERBOX COVER 5/8" STUDS AND NUTS ON T'.RAIN C ESSENTIAL CHILLED WATER CHILLER UNIT 22C 3 REPLACEMENT PIPING ESSENTIAL REPLACED PIPING SPOOL EW-2230-A FROM 11/24/2015 2-15-004 COOLING FW0001 TO HFS0917 ON LINE 4"EW-2230WT3 WATER 3 REPLACEMENT VALVE ESSENTIAL REPLACED TEW.1006 ESSENTIAL CHILLER 22C 05/19/2015 2-15-008 COOLING ECW RETURN VALVEWITH A STAINLESS WATER STEEL VALVE PER DCP IN PACKAGE 13-50-218 3 REPLACEMENT PIPING *ESSENTIAL REPLACED AL-EF PIPING DOWNSTREAM OF 07/20/2015 2-15-009 COOLING TRAIN 2C CCW IHX OUTLET THROTTLE VALVE WATER EW0101 WITH SfAINLESS STEEL PER DCP*IN PACKAGE 13-11301-4 --
3 REPLACEMENT _PIPING *ESSENTIAL REPLACED AL-E\Z PIPING DOWNSTREAM OF 07/20/2015 2~15-015
- coOLING TRAIN 2C CCW liJX OUTLET THROTTLE VALVE WATER EW01_01_ WITH STAINLESS STEEL PER DCP IN PACKAGE 13-11301-4 3 REPLACEMENT BOLTING COMPONENT REPLACED U-B(j)LT; DAMAGED DURING 07/20/2015 2-15-017 COOLING DISASSEMBLY PIPE SUPPORT CV2171 HLS009.
3 REPLACEMENT _ SUPPORT ESSENTIAL SHORTEN FIXEG SWAY STRUTEW2305HL5003 07/19/2015
- 2-15-018 COOLING AND ~ENGTHEN FIXED SWAY STRUT -
Page 7of10
. TABLE 2 ABSTRACT OF REPAIRS/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE 2RE1,8.
October-November 2016 SYSTEM ..
CODE CORRECTIVE DATE *.. REPAIR/REPLACEMENT ITEM DESCRIPTION DESCRIPTION OF WORK CLASS MEASURE COMPLETED * *PLAN NUMBER 2 REPLACEMENT PIPING FEEDWATER REPLACED 18" DIAMETER PIPE SPOOL FW- 10/29/2016 2~15-019.
SYSTEM 2026-N ON LINE 18"FW-2016-GA2 WITH FAC *
. FAC RESISTANT MATERIAL OF MINIMUM .
CHROME CONTENT 0.1 %
3 REPLACEMENT PIPING ESSENTIAL REPLACED 4)\2 SWAGE FITTING IN THE CCW 12/01/2015 2-15-020.
COOLING PUMP SUPPLEMENTAL COOLER 2C ECW ..
WATER SUPPLY LINE 2" EW-2313-WT3 .. ...
1 REPLACEMENT RCP SEAL REACTOR REPLACED REACTOR COOLANT PUMP 2C 10/31/2016 2-15-021 .
PACKAGE COOLANT CARTRIDGE SEAL PACKAGE AND #1 SEAL 1 REPLACEMENT TEMPERATURE REACTOR REPLACED RT;D D2RC-TE-0420Y (REACTOR 11/08/2016 2-15-022 ..
ELEMENT COOLANT COOLANT SYSTEM LOOP 28 HOT LEG NARROW RANGE TEMPERATURE ELEMENT)
3 REPLACEMENT* PIPING ESSENTIAL REPLACED 8 " FLANGE & 90 DEG ELBOW OF 11/17/2015 . 2-15-024 ..
COOLING SPOOL EW-21~5-C ON ES_SENTIAL CHILLER WATER 22A ECW OUTLET LINE 8"EW-2185-WT3 i
- -~.
3 REPLACEMENT VALVE COMPONENT REPLACED CCW COMMON RETURN l:lEADER 10/12/2016 . 2-15-025 PRESSURE RELIEF VALVE N2CCPSV4492 '
COOLING 1 REPLACEMENT VALVE REACTOR REPLACED PRESSURIZER SAFETY VALVE 10/26/2016. 2-15-026 COOLANT N2RCPSV3450
- Attachment NOC-AE-17003440 Page 8()f10 TABLE 2 ABSTRACT OF REPAIRS/REPLACEMENT ACTIVITIES REQUIRED FOR CON,TINUED SERVICE 2RE1'.8 OC!ober-November 2016 SYSTEM . . .. ..
CODE CORRECTIVE ITEM DATE REPAIR/REPLACEMENT PLAN CLASS. MEASURE DESCRIPTION
.. DESCRIPTION OF WORK COMPLETED NUMBER.
1 REPLACEMENT VALVE. REACTOR REPLACED PRESSURIZER SAFETY VAL VE 10/26/2016 2-15-027 COOLANT N2RCPSV3451
~-~- ****4*-. ....... ..
1 REPLACEMENT VALVE REACTOR REPLACED PRESSURIZER SAFETY VALVE 10/26/2016 2-15-029 COOLANT N2RCPSV3452 3 REPLACEMENT .FLANGE ESSENTIAL .. REPLACED 30': FLAT FACED FLANGE IAWDCP .05/06/2016 2~16-002 COOLING 13-11301-7 ANDA 30'.' FIELD PIPE WELD (.250 .
WATER WALL) AL-BR TO AL-BR. TRAIN 2A ECW RETURN LINEjDOWNSTREAM OF 2-EW-0027. '.
AND 30'.' EW-2105-WT3 PER DCP IN PACKAGE .
1 REPAIR VALVE RESIDUAL INSTALLED SEAL WELD ON RHR PUMP 2C 10/25/2016 .... ................
REMOVAL 2
INSTALLED NEW TRIM PACKAGE. REPACKED 10/26/2016 2-016~004 REPLACEMENT VALVE CHEMICAL&
VOLUME VALVE.REPLACED POSITIONER ON eves CONTROL CHARGING DISCHARGE HEADER FLOW CONTROL VAGVE (A2CVFCV0205l *" v .....
3 REPLACEMENT PIPE ESSENTIAL REPLACED ALrnz PIPING DOWNSTREAM ON 05/06/2016 2-16-006
.... COOLING WATER TRAIN 2A CCW HX OUTLET THOTILE VALVE EW027 WITH STAINLESS STEEL PER DCP IN .
PACKAGE 13-f 1301-7 .....
3* REPLACEMENT PIPE ESSENTIAL REPLACED sp;ooL EW-2114-C-A03 ON LINE 05/04/2016 2-16-007.
COOLING 2"EW-2114-WTr3.
WATER l
- .--.*~-*-**---**-~.,..--.----,.,.*=-_,,----.,...,,,...,.,.
Attachment .
NOC-AE-17003440
.Page 9of10 TABLE 2 ABSTRACT OF REPAIRS/REPLACEMENTACTIVITIES REQUIRED FOR CONTINUED SERVICE 2RE1j8 October-Novern ber 2016 SYSTEM . . . ....
CODE CORRECTIVE ITEM DATE *REPAIR/REPLACEMENT DESCRIPTION OF WORK CLASS MEASURE DESCRIPTION COMPLETED .PLAN NUMBER 3 REPLACEMENT PIPING ESSENTIAL RE;PLACED OF AL-BZ 30" AND 2' 06/10/2016 2-16-009 .
COOLING PIPE/FITTINGS WATER ON 30"EW-2476-UB3 AND 2"EW-2452-WB3 PER DC- 13-11301"8 3 REPLACEMENT PIPING ESSENTIAL REPLACED AL-BZ PIPE PUP PIECE AND 06/07/2016 2-16-0.11 COOLING FLANGE ON LINE 30" EW-2205-WT3 ..
WATER I
3 REPLACEMENT PIPING ESSENTIAL REPLACED AL-BZ 2" PIPING ON 2'EW2213WT3 06/10/2016. l 2-16:012 COOLING AND 30"EW2205-WT3 PER DCP 13-11301-8.
WATER '*
3 REPLACEMENT SUPPORT ESSENTIAL REPLACED BROKEN SUPPORT FASTENER ON . 07/27/2016 . 2~16-017 COOLING ECW PUMP 2A LOWER PUMP SEISMIC
... -**** . ... *****' ........ ...... WATER SUPPORT 2 REPLACEMENT VALVE COMPONENT REPLACED Rt-m TRAIN C CCW SUPPLY IRC 09/08/2016 2~16~021 .
COOLING CHECK VALVE (2R202TCC0183)
MC REPLACEMENT BOLTING MECHANICAL REPLACE DAMAGED SWING BOLT 10/19/2016 2-16-024 PENETRATION EQUIPMENT ~ATCH (MECHANICAL ..
PENETRATION EQUIPMENT HATCH
- -* 2C092NPN092A) 2 REPLACEMENT VALVE CHEMICAL & REPLACED eves VOLUME CONTROL TANK 10/19/2016 2-16-025 VOLUME PRESSURE RELIEF 0
VALVE ( N2CVPSV3101)
CONTROL WITH A SPAR E . ... ,._, ....... * ....
2 REPLACEMENT VALVE CHEMICAL & REPLACED R~ PURIFICATION PUMP * .. 10/19/2016 2-16-026 ..
VOLUME DISCHARGE lfRESSURE RELIEF VALVE.
CONTROL PSV3134 WITH A SPARE
Attachment*
NOC-AE-17003440 Page 10of10 TABLE 2 ABSTRACT OF REPAIRS/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE 2RE18 October-November 2016 CODE qORRECTIVE ITEM. SYSTEM . REPAIR/REPLACEMENT DATE CLAss* DESCRIPTION OF WORK l\'.IEASURE *
- DESCRIPTION COMPLETED PLAN NUMBER l
1 REPAIR VALVE SAFETY .SEAL WELDED BODY TO BONNET ON SAFETY 10/29/2016 2-16-029.
INJECTION INJECTION TRAIN B TO LOOP 2B COLD LEG INJECTION CHECK VALVE 1N122XSI0038B I
2 REPLACEMENT SUPPORT FEED WATER .REPLACED SPRING CANS VARIABLE SPRING j
10/30/2016 2-16-030 HANGER FWi2029-HL5001 2 REPLACEMENT SUPPORT FEEDWATER REPLACED SPRING CAN VARIABLE SPRING 11/07/2016 2-16-031 ..
HANGER FWi2032-HL5001 2-16~032
~
2 REPLACEMENT. SUPPORT FEED WATER REPLACED S'.PRING CAN VARIABLE SPRING
HANGER FW~2030-HL5001 2 REPLACEMENT SUPPORT FEED WATER REPLACED SPRING CAN VARIABLE SPRING 10/29/2016 2~'16-033 HANGER FWi2031-HL5001 .