LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Section 13.5, Table 13.5-1, Administrative Procedure Topics

From kanterella
(Redirected from ML17046A544)
Jump to navigation Jump to search
Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Section 13.5, Table 13.5-1, Administrative Procedure Topics
ML17046A544
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/30/2017
From:
Public Service Enterprise Group
To:
Office of Nuclear Reactor Regulation
Shared Package
ML17046A230 List: ... further results
References
LR-N17-0034
Download: ML17046A544 (5)


Text

TABLE 13.5-1 ADMINISTRATIVE PROCEDURE TOPICS

  • Administration Program Description
  • Supplemental Workforce Program Description
  • Business Planning Process Description
  • Management Process
  • Project Evaluation and Authorization Process
  • Budgeting Process Description
  • Forecasting Process Description
  • Salem/Peach Bottom Co-Owner Relationship
  • Configuration Control Process Description
  • Nonconforming Materials, Parts, Components
  • Outsourcing Engineering Work Authorization Process
  • Margin Management
  • Configuration Management
  • Chemistry Process Description
  • Environmental Program
  • Environmental Management System Process
  • Chemical Management Process
  • Equipment Reliability Process Description
  • PSEG New Hire Engineer Mentoring Program
  • Equipment Reliability Program Description Note: This list consists of all of the active "description documents" (which correspond to the prior Nuclear Administrative Procedures (NAPs) which were the top-level procedures from our prior procedure system). It is a full-scale listing of the change from the old program to the new O.E.M. Program. This list represents all of the documents in alpha-numeric order without using the document numbers themselves, since the list is by TOPICS.
  • Integrated Equipment Reliability Long Planning Process Description
  • Material Degradation Program (MDMP)
  • Regulatory Medical Testing Human Resources and Administration
  • Exempt Overtime Human Resources and Administration 1 of 3 SGS-UFSAR Revision 25 October 26, 2010 TABLE 13-5-1 (Continued)
  • Protected Activities and Selection Processes Human Resources Md Administration
  • Change Management Human Performance Policy
  • Technical Human Performance Process Description
  • Nuclear Wireless Regulatory Compliance Program Description
  • Licensing Process Descriptions
  • Process Description = Interface with Other Outside Agencies
  • Reload Control Process Description
  • Quality Assurance Topical Report (QATR)
  • Nuclear Oversight Audit Process Description
  • Nuclear Oversight Performance Assessment Process Description
  • Nuclear Oversight Vendor Audit (NOVA) Process Description
  • Independent Inspection Process Description
  • Independent Safety Engineering Function Process
  • Conduct of Qperations Process Description
  • Project Management
  • Contractor Utilization
  • Contractor Alliance Process
  • Records Management (RM) Process Description
  • Radiation Protection Process Description
  • External Dose Control Program Description
  • Internal Dose Control Program Description
  • Respiratory Protection Program Description
  • Radioactive Material Control Program Description 2 of 3 SGS-UFSAR Revision 25 October 26, 2010 TABLE 13-5-1 (Continued)
  • Radioactive Material/Waste Transportation/Disposal Program Description
  • Radwaste Process Description
  • Radioactive Contamination Control Program Description
  • Program Description
  • Radiological Instrumentation Program Description
  • Radiological Posting and Labeling Program Description
  • Access Authorization Process Description
  • Training System Development Process Description
  • Work Management Process Description 3 of 3 SGS-UFSAR Revision 25 October 26, 2010 TABLE 13.5-2 ABNORMAL OPERATING PROCEDURES
  • Loss of Protective System Channels
  • Acts of Nature
  • Fire Protection System Activation -Plant Fires
  • Abnormal Release of Radioactivity ** Turbine Trip .,. Generator Load Reject ** Plant Chemistry Out-of Specification ** Condenser Tube Leakage ** Dropped Control Rod
  • Failed Open Safety/Pressure Relief Valve ** Control Room Evacuation ** Loss Of Electrical Power {Blackout) -* Loss of Primary Containment Integrity .. Loss of Secondary Containment Integrity -* Loss of Circulating Water
  • Loss of Recirculation Pump or Flow (Hope Creek}
  • Loss of Generator Stator Water Cooling ** Loss of Generator Seal Oil ** Loss of Service Air 1 of 2 SGS-UFSAR Revision 22 May 5, 2006 I I TABLE 13-5-2 (Continued)
  • Loss of Instrument Air
  • l10SS of Reactor Auxiliary Cooling Water {Hope Creek)
  • Loss of Safety and Turbine Auxiliary Cooling Water (Hope Creek)
  • Reactor Pressure Control System Malfunction ** Reactor Vesse1 Level Control System Malfunction (Hope Creek} -* Neutron Monitoring System Malfunction -** Fuel Pool Cooling *** Fuel Pool Cleanup System Malfunction (Hope Creek) ,. Standby Liguid Control System Initiation (Hope Creek) 2 of 2 SGS-UFSAR Revision 22 May 5, 2006 I I