Owner'S Activity Report Submittal; Fifth 10-Year Interval 2016 Refueling Outage Activities
ML17045A540
Person / Time
Site: Dresden Constellation icon.png
Issue date: 02/09/2017
From: Karaba P
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
17-0009
Download: ML17045A540 (11)


Text

Exelon Generation Dresden Nuclear Power Station 6500 North Dresden Road Morris, IL 60450 February 9, 2017 SVPLTR: #17-0009 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Dresden Nuclear Power Station, Unit 3 Facility Operating License No. DPR-25 NRC Docket No. 50-249

Subject:

Owner's Activity Report Submittal; Fifth 10-Year Interval 2016 Refueling Outage Activities This letter submits the Owner's Activity Report (i.e., Form OAR-1) for repair/replacement activities performed during the previous cycle D3C24 and In-vessel Visual Inspection (IVVI)

. Report for the Dresden Nuclear Power Station (DNPS) Unit 3 refueling outage (D3R24) which began on October 31, 2016, and was completed on November 16, 2016. This is the first refueling outage conducted in the second inspection period of the fifth 10-year inservice inspection interval for DNPS Unit 3. A copy of the Owner's Activity Report and IVVI Report are provided as attachments to this letter.

This Owner's Activity Report is submitted in accordance with American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, "Repair/Replacement Activity Documentation Requirements and lnservice Summary Report Preparation and Submission," and USN RC Safety Evaluation In Support of Request for Relief Associated With the Fifth 10-Year lnservice Inspection Interval Program dated September 30, 2013. Code Case N-532-4 requires an Owner's Activity Report Form OAR-1 to be prepared and certified upon completion of each refueling outage. In accordance with the conditions of Code Case N-532-4, this OAR-1 form is being *submitted within ninety days of the completion of the refueling outage.

The IVVI results are provided to report vessel internal inspections and to support B-N-1 anc;I B-N-2 relief request exam completion. Should you have any questions concerning this letter, please contact Mr. Bruce Franzen, Regulatory Assurance Manager at (815) 416-2800.

Respectfully, Peter J. Karaba Site Vice President Dresden Nuclear Power Station Enclosures

FORM OAR-1 OWNER'S ACTIVITY REPORT.

Report Number Refueling Outage D3R24 OAR-1 Plant Dresden Nuclear Power Station, 6500 N. Dresden Road, Morris, IL 60450 Unit No. 3 Commercial Service Date 11/16/1971 Refueling Outage Number D3R24 (if applicable)

Current Inspection Interval 5th Ins~ection Interval (1st, 2 I 3rd, 4th, Other)

Current Inspection Period 2nd Inspection Period (l", 2nd, 3rd)

Edition and Addenda of Section XI applicable to the Inspection Plans 2007 Edition with 2008 Addenda Date / Revision of Inspection Plans 10/31/16/Revision 3 Edition *and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used: N-649 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests, meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of D3R24 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois The Hartford Steam Boiler of Hartford , Connecticut and employed by Inspection and Insurance Company have inspected the items described in this Owner's Activity Report, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI By signing this certificate neither the Inspector nor his employer makes any warranty expressed or implied concerning the repair/

replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection

__*:::--dZ--:::::::~::::===-==......-=-=::::>====------

(Inspector's Signature)

Commissions IL 1546j NB10972 A, N, I National Board, State, Province, and Endorsements Date 2/~ /17 D3R24 OAR-1 Page 3 of 6

TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number Item Description Evaluation Description None None None D3R24 OAR-1 Page 4 of 6

TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Description Date Repair/

Class Description Of Work Completed Replacement Plan Number 3 Pinhole Leak Identified on Unit 3 CCSW Division 1 Drilled out flaw and encapsulated leak. 5/8/15 RRP 3-15-012 Piping 3 Leak Identified Coming from Unit 3 Division 1 Drilled out flaw and installed branch connection. 9/19/15 RRP 3-15-015 CCSW Discharge Piping 2/3 Indications on 3A LPCI Heat Exchanger Support Ground out indications and welded up between 11/8/16 RRP 3-16-040 heat exchanaer and support plate.

2/3 Indications on 3B LPCI Heat Exchanger Support Ground out indications and welded up between 11/16/16 RRP 3-16-041 heat exchanaer and suooort olate.

3 Reoair Pit on CCSW Pioe Removed oit and weld build back up. 11/10/16 RRP 3-16-060 D3R24 OAR-1 Page 5 of 6

Dresden Unit 3 Reactor Internals Inspection Report Refueling Outage D3R24 The ASME Section XI inspections credited during D3R24 includes the once-per-period B-N-1 inspection of the reactor vessel interior and B-N-2 inspections of reactor vessel interior attachments. Credit is being taken for the Boiling Water Reactor Vessel and Internals Project (BWRVIP) examinations in place of the B-N-1 and B-N-2 examinations as allowed in Dresden Station Relief Request I5R-07, "Request for Relief for the Use of BWRVIP Guidelines in lieu of Specific ASME Code Requirements on Reactor Vessel Internals and Component Inspection In Accordance with 10CFR50.55a(a)(3)(i) Alternative Provides Acceptable Level of Quality and Safety".

To implement the requirements of the BWRVIP, General Electric - Hitachi (GEH) was contacted to perform the inspection activities. The following components and assemblies were examined as directed by BWRVIP documents:

  • Two components on the shroud repair hardware and 28 shroud vertical welds in accordance with BWRVIP-76 Revision 1, "BWR Core Shroud Inspection and Flaw Evaluation Guidelines".
  • Attachment welds for all four steam dryer support lugs and five jet pump riser brace attachment welds in accordance with BWRVIP-48-A, "Vessel ID Attachment Weld Inspection and Flaw Evaluation Guidelines".
  • The top guide rim weld and all four aligner pin/block assemblies in accordance with BWRVIP-26-A, "BWR Top Guide Inspection and Flaw Evaluation Guidelines".

Additionally, one of each of the following cast austenitic stainless steel components were inspected: a control rod guide tube base and a fuel support piece. These exams were performed as augmented ISI as required by a license renewal commitment.

The above BWRVIP examinations resulted in no indications identified in the reactor interior surface as defined by B-N-1 or the reactor interior attachments as defined by B-N-2.

D3R24 OAR-1 Page 6 of 6

OAR-1 Summary Date Submitted: I 2/14/2017 Page: 1 Repair/ Work Request EPN Number Description of Repair/Replacement OAR-1 Replacement Plan No.

Number Code Class Reportable I Dbase Record 2-15-052 01585059-01 2 2-2499-288 Replace valve bonnet bolting if required as a No result of internal inspection.

2-16-001 01534639-01 2 2-2301-39 Replace bolting if required during No maintenance on valve.

2-16-004 01896403-01 SPARE MSIV DISC Perform NOE on MSIV disc machined per No EC 399980.

2-16-005 01896404-01 1 SPARE MSIV DISC Perform NOE on MSIV disc machined per No EC 399980.

2-16-006 01508126-01 SPARE FDWTR CHK Perform repairs to spare feedwater No checkvalve assembly S/N 02467/02464 combo disc/seat.

2-16-014 PO 538779-01 1 S/N 223 Perform repair to Target Rock S/N 223 per No CEAR 15-300 and traveller 15-45.

2-16-018 PO 568495-01 S/N DA39300 Perform repairs to ERV S/N DA39300 per No NWS CEAR 16-192 and 16-129.

2-16-020 PO 538779-01 1 TRGT ACK S/N223 Perform repairs to Target Rock Base S/N No 223 per NWS Traveller 15-45.

2-16-022 1786761-01 1 FDWTR CHK Rebuild spare feedwater check disc that No wasw removed under WO 1404169-01.

3-12-061 01536607-01 3 3-5700-308 Replace standpipes on CCSW room cooler No 3-5700-308.

3-14-025 01612043-01 3 3-5746-A Replace 3A LPCI room cooler coils if No required. Piping unions and cooler bolting may be replaced as necessary.

3-14-056 01391213-01 3-220-62A Replace feedwater checkvalve disc/seat No assembly with refurbished spare.

3-14-071 01206037-01 2 3-1402-28A Replace valve and, if required, bolting No 3-15-001 01428388-02 2 3-2301-76 Replace valve if required. No 3-15-002 01788368-04 2 3-1599-144 Install new four inch line 3-1584-4"-DX and No new valve 3-1599-144 on LPCI line 3-1509-16"-LX for FLEX mod, EC 394206.

OAR-1 Summary Date Submitted: I 2/14/2017 Page: 2 Repair/ Work Request Code EPN Number Description of Repair/Replacement OAR-1 Replacement Plan No.

Number Class Reportable I Dbase Record 3-15-004 01738369-06 2 3-1599-143 Install new four inch line 3-1589-4"-DX and No new valve 3-1599-143 on LPCI line 3-1508-18"-DX for FLEX mod, EC 394206.

3-15-006 01738369-12 2 3-1599-146 Install new four inch line 3-1586-4"-DX and No new valve 3-1599-146 on LPCI line 3-1504-16"-DX for FLEX mod, EC 401240.

3-15-007 01738369-14 2 3-1599-141 Install new four inch line 3-1590-4"-DX and No new valve 3-1599-141 on LPCI line 3-1503-18"-DX for FLEX mod, EC 401239.

3-15-010 01738369-02 2 3-1580-6"-LX Install new six inch line 3-1580-6"-LX and No new valve 3-1599-142 on LPCI line 3-15078-14"-LX for FLEX mod, EC 401236.

3-15-011 01738369-10 2 3-1582-6"-LX Install new six inch line 3-1582-6"-LX and No new valve 3-1599-140 on LPCI line 3-15028-14"-LX for FLEX mod, EC 401235.

3-15-012 01829523-01 3 3-1512-24"-0 Repair pinhole leak on Unit 3 CCSW suction Yes line 3-1512-24"-0 in Cribhouse.

3-15-013 01817203-05 2 3-1589-4"-DX Cut line 3-1589-4"-DX and install slip-on No flanges per EC 401870.

3-15-015 01861885-01 3 3-1514-16"-0 Replace Unit 3 line 3-1514-16"-0. Line Yes developed hole during pump run.

3-15-019 01787609-23 1 3-305-14-23 Replace Unit 3 stuck control rod drive D-11. No 3-15-020 01820258-80 1 3-0201 Repair cladding on reactor head flange No 3-15-021 01711473-01 3 3-3930-501 Replace DGCW check valve if required. No 3-15-022 01533149-01 2 2-2301-51 Replace check valve and bolting if required No based on inspection results.

3-15-023 01533150-01 2 2-2301-39 Replace valve bolting if required during No maintenance.

3-16-001 01376368-01 3 3-1501-18 Replace 38 CCSW pump discharge check No valve and bolting if required.

OAR-1 Summary Date Submitted: I 2/14/2017 Page: _3_

Repair/ Work Request Code EPN Number Description of Repair/Replacement OAR-1 Replacement Plan No.

Number Class Reportable I Dbase Record 3-16-002 01478031-01 2 3-1101-438 Remove seal weld to permit dis-assembly No and internal check valve inspection. New bonnet may be installed if damaged during seal weld removal.

3-16-003 01807087-01 1 3-203-3A Replace Unit 3 Target Rock valve. Repair No inlet flange if required and replace inlet bolting if required.

3-16~004 01606234-01 2/3 3-1503-A Replace 3A LPCI heat exchanger cover No bolting if lost or damaged during inspection or cleaning. Heat exchanger tubing will be replaced based on Eddy Current testing results.

3-16-005 01585060-01 MC 3-2499-28A Replace valve bonnet bolting if required. No 3-16-006 01598042-01 1 3-202-A Replace seal flange on 3A Recirc Pump. No 3-16-007 00771000-01 2 3-220-59 Replace feedwater check valve dis/seat No assembly with refurbished spare.

3-16-008 01805351-01 1 3-220-588 Replace seat/disc assembly on feedwater No check valve.

3-16-011 01401491-01 2 3-1501-138 Replace relief valve and flange bolting if No required.

3-16-012 01406222-01 2 3-1501-13A Replace relief valve and flange bolting if No required.

3-16-013 01201116-01 MC 3-4399-915 Replace relief valve and bolting if required. No 3-16-014 01838183-01 2 3-2301-45 Replace HPCI turbine exhaust check valve No and bolting if required.

3-16-015 01790012-01 2 3-1105-8 Replace S8LC relief valve and bolting if No required.

3-16-016 01446934-03 2 3-1501-650 Replace check valve if required based on No inspection results from Task 01.

3-16-018 1800527-14 3 3-1302 Repair splash bracket supports if required. No

OARm1 Summary Date Submitted: I 2/14/2017 Page: 4 Repair/ Work Request EPN Number Description of Repair/Replacement OAR-1 Replacement Plan No.

Number Code Class Reportable I Dbase Record 3-16-019 997303-01 MC 3-2499-48 PM replacement of valve disc. Includes tack No welds.

3-16-022 1806475-05 1 CRDM'S Routine refuel outage replacement of control No rod drive mechanism's and bolting. Replace 20 CRDM's with Tasks 5 thru 24.

3-16-023 1801578-17 3 3-30190-54 Replace snubber. No 3-16-024 1617486-28 SPARE MSIV DISC Perform NOE on MSIV disc modified per EC No 399980.

3-16-026 1387032-01 2 3-1402-28B Rebuild Core Spray relief valve removed in No WO 561080.

3-16-027 1890551-04 2 WEST BANK HCU'S Perform PM's on Unit 3 West Bank HCU's. No 138 check valve ball may be replaced as applicable based on as-found conditions.

Accumulator may be replaced as required.

Applys to Tasks 02, 04, 08, 09, 10, 12 and 25.

3-16-028 1890551-05 EAST BANK HCU'S Perform PM's on Unit 3 East Bank HCU's. No 138 check valve ball may be replaced as applicable based on as-found conditions.

Accumulator may be replaced as required.

ApplystoTasks5,6, 7, 11, 13, 14, 15, 16, 17, 18, 19,20,21,22,23,24,26,27,31 and 32.

3-16-029 1607330-01 3-203-4C Replace Unit 3 4C SRV. Inlet bolting may be No replaced and inlet flange repaired as required.

3-16-030 1440977-05 2 3-1402-8A Machine valve body. Machine, weld build up No disc. Tack weld disc in place.

3-16-031 1606844-01 1 3-203-3E Replace 3E ERV. Replace inlet bolting. No Repair inlet flange if required.

3-16-032 1606161-01 1 3-203-3C Replace Unit 3 ERV 3C and inlet bolting. No Inlet flange may be repaired if required.

3-16-034 1848795-01 3 3-1512-24 11 Replace degeraded section of Unit 3 CCSW No piping in Cribhouse.

OAR-1 Summary Date Submitted: I 2/14/2017 Page: 5 Repair/

Replacement Plan No.

Work Request Number Code Class EPN Number Description of Repair/Replacement Reportablel OAR-1 Dbase Record 3-16-035 1848795-24 3 3-1501-368 Replace bonnet bolting on 3-1501-368 valve No if required.

3-16-036 1402307-01 1 3-203-4A Replace Unit 3 SRV 4A. Includes bolting No replacement and inlet flange repair if required in Task 5.

3-16-037 1811136-01 MC HARDENED VENT Install new hardened vent piping on Unit 3. No EC 401069.

3-16-038 1607328-01 1 3-203-48 Replace Unit 3 SRV 48. Includes bolting No replacement and inlet flange repair if required in Task 6.

3-16-039 1915321-01 3 3-1501-2A Replace bonnet bolting and valve disc if No required.

3-16-040 1882849-02 2 3-1503-A Repair area's identified in NOE report Yes performed in Task 1. Also repair up to an additional 20" per side of existing weld based on NOE report results.

3-16-041 1882850-02 2 3-1503-B Repair area's identified in NOE report Yes performed in Task 1. Also repair up to an additional 20" per side of existing weld based on NOE report results.

3-16-042 1388392-01 2 3-1105-8 Rebuild S8LC relief valve removed under No WO 998429-01.

3-16-043 1400131-01 2 3-1201-158 Replace valve seat/disc assembly if required. No 3-16-044 1799782-01 MC 3-2001-105 Replace valve diaphragm and perform PM's. No 3-16-045 1799790-01 MC 3-2001-106 Replace valve diaphragm and perform PM's. No 3-16-046 1799792-01 MC 3-2001-6 Replace valve diaphragm and perform PM's. No 3-16-047 1799793-01 MC 3-2001-5 Replace valve diaphragm and perform PM's. No 3-16-049 1811136-27 MC M-1194A-2-H45 Install new support on Class MC piping for No hardened vent mod per EC 401069.

OAR-1 Summary Date Submitted: I 2/14/2017 Page: _6_

Repair/ Work Request Code EPN Number Description of Repair/Replacement OAR-1 Replacement Plan No.

Number Class Reportable I Dbase Record 3-16-050 1848792-01 3 3-1514-16"-0 Replace degraded section of CCSW pipe 3- No 1514-16"-0 off of Unit 3 Torus catwalk.

3-16-051 1848792-10 3 3-1514-16"-0 Replace existing degraded section of CCSW No pipe on Unit 3. Replace pipe from 3-1501-4A valve upstream to elbow inside torus basement. Includes existing pipe repairs at cut lines.

3-16-052 1786694-01 3 3-3933-503 Replace 3-3933-503 valve. Includes No installing slip on flange as a contingency in Task 05.

3-16-053 1955768-01 3-220-58A Reweld nut back to valve disc using a No qualified welder.

3-16-054 1954128-01 3 3-1514-16"-0 Replace section of CCSW pipe 3-1514-16"- No 0 in Unit 3 Turbine Building.

3-16-055 1954128-06 3 M-12000-106 Remove existing and re-attach support lugs No to new pipe for Unit 3 CCSW support M-12000-106.

3-16-056 1617486-30 3-0203-10 Perform in body macining on MSIV 1 0 for No new liner fit up.

3-16-057 1915321-06 3 3-1501-2A Repair disc guide rails in valve body. No 3-16-058 1965266-01 2 X-317 Replace bolting at Unit 3 HPCI exhaust No spectacle flange if required.

3-16-059 1964477-01 1 3-3001 B-45 Repair snubber spherical bearing. No 3-16-060 01848795-08 3 3-1512-24" Repair pit found on CCSW pipe located in Yes the cribhouse during a non-ISi inspection.

Pit shall be ground out and weld repaired.

3-16-061 1803317-19 2 M-11990-61 Replace strut bolting on ISO support m- No 11990-61.