UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011 8064
August 16,
1996
Gregory
M. Rueger.
Senior Vice President
and General
Manager
Nuclear Power Generation
Bus. Unit
Pacific Gas
and Electric Company
Nuclear
Power Generation,
B14A
77 Beale Street,
Room 1451
P.O.
Box 770000
San Francisco.
Cali fornia
94177
SUBJECT:
NRC
INSPECTION REPORT 50-275/96-13:
50-323/96-13
AND NOTICE OF
ViOLATION
Dear Mr. Rueger:
On May 28 through June
28,
1996, the
NRC completed
an inspection at your
Diablo Canyon Nuclear
Power Plant,
Units
1 and 2, reactor facilities.
The
enclosed
report presents
the scope
and results of that inspection.
Areas
examined during the inspection
are identified in the report.
Withi'n
these
areas.
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with personnel'nd
observation of
activities in progress.
The purpose of the inspection
was to determine the
effectiveness
of your controls
in identifying, resolving.
and preventing
problems.
The overall results of the inspection are discussed
in the executive
summary
of the enclosed
report.
The inspectors
found, in general,
that your
corrective action program was well structured,
provided
an effective process
for identifying, resolving and preventing plant problems,
and was properly
implemented.
Based
on the results of this inspections
certain licensee activities appeared
to be in violation of NRC requirements
as specified in the enclosed
Notice of
Violation (Notice).. The circumstances
surrounding the violation are described
in detail in the enclosed
report.
Please
note that you are required to
respond to this letter
and should follow the instructions specified in the
enclosed
Notice when preparing your response.
The
NRC will use your response,
in part. to determine whether further enforcement action is necessary
to
ensure
compliance with regulatory requirements.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy 'of
this letter. its enclosures.
and your response will be placed in the
NRC
Public Document
Room (PDR).
To the extent possible,
your
response
should not
include any personal
privacy, proprietary. or safeguards
information so that
it can
be placed in the
PDR without redaction.
96082i 002i 9608i6
ADCICK 05000275
8
Pacific Gas
and Electric Company
-2-
Should you have
any questions
concerning this inspection.
we will be pleased
to discuss
them with you.
Sincerely,
Dockets:
50-275
~
50-323
Licenses:
DPR-82
Enclosures:
1.
2.
NRC Inspection Report
50-275/96-13:
50-323/96-13
cc w/enclosures:
Dr. Richard Ferguson
Energy Chair
Sierra
Club CalifoJnia
1100 11th Street,
Suite 311
Sacramento,
Cali fornia
95814
Ms.
Nancy Culver
San Luis Obispo Mothers for Peace
P.O.
Box 164
Pismo Beach, California
93448
Chairman
San Luis Obispo County Board of
Supervisors
Room 370
County Government
Center
San Luis Obispo, California
93408
Kenneth
E.
Brockman, Acting Director
Division of R: actor Safety
Mr. Truman BurnsNMr. Robert Kinosian
California Public Utilities Commission
505 Van Ness,
Rm.
4102
San Francisco.
Cali fornia
94102
Pacific Gas
and Electric Company
-3-
Robert
R. Wellington;-Esq.
Legal
Counsel
Diablo Canyon
Independent
Safety Committee
857 Cass Street,
Suite
D
Monterey, California
93940
Mr. Steve
Hsu
Radiologic Health Branch
State
Department of Health Services
P.O.
Box 942732
Sacramento,
94234
Christopher
J.
Warner.
Esq.
Pacific Gas
and Electric Company
P.O.
Box 744Z
San Francisco,
94120
Robert
P.
Powers,
Vice President
and Plant Manager
Diablo Canyon
Power Plant
P.O.
Box 56
Avila Beach, California
93424
Pacific Gas
and Electric Company
E-Hail report to D. Nelson
(DJN)
E-Hail report to
NRR Event Tracking System
( IPAS)
bcc to
DMB (IE01)
>
bcc distrib.
by RIV:
L. J. Callan
DRP Director
Branch Chief (DRP/E.
WCFO)
Senior Project Inspector
(DRP/E.
WCFO)
Branch Chief (DRP/TSS)
Leah Tremper
(OC/LFDCB,
HS:
TWFN 9E10)
DRS AI 96-G-00'V8
Resident
Inspector
DRS-PSB
HIS System
RIV File
H.
Hammond
(PAO,
WCFO)
DOCUMENT NAME~I)C613RP. WW
To receive copy of document,
indicate in box: "C" = Copy without enclosures
"E" = Copy with enclosures
"N" = No copy
RI: EB
DBPEREIRA
RI: EB
PMOUALL
SRI: DRP
WCWALKE
C:EB
CAVANDENB
AD:DRS
KEBROCKMA
08/i%96
To receive copy of documen
08/ w/96
t, indicate in box: "C"
08/pJ96
= Copy without
08/ t&96
08//
96
enclosu res
"E" = Copy with enclosures
"N" = No copy
PBE:DRP
HWONG'8/'. / 6"
r) ygftog
AD:DRS
KEBROCKHAN
08/
/96
08/
/96
ALR
R
Y
08/
/96
08/
/96
Paci fic Gas
and Electri c Company
E-Hail report to D. Nelson
(DJN)
E-Hail report to
NRR Event Tracking System
(IPAS)
bcc to
DHB (IE01)
bcc distrib.
by RIV:
L. J. Callan
DRP Director
Branch Chief (DRP/E,
WCFO)
Senior Project Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
Leah Tremper
(OC/LFDCB.
MS:
TWFN 9E10)
DRS AI 96-G-0098
Resident
Inspector
DRS-PSB
HIS System
RIV File
H.
Hammond
(PAO,
WCFO)
DOCUHENT NAHE~ tlC613RP. WW
To receive copy of document,
indicate in box: "C" = Copy without enclosures
"E" = Copy with enclosures
"N" = No copy
RI: EB
DBPEREIRA
08/ %%96
RI: EB
PMQUALL
08/ w/96
SRI: DRP
WCWALKE
08/<&96
C:EB
CAVANDENB
08/ t&96
AD:DRS
KEBROCKHA
08//
96
To receive copy
f documen t, indicate in box: "C" = Copy without enciosu res
"E" = Copy with enclosures
"N" = No copy
PBE:DRP
r
AD:DRS
HWONG
KEBROCKHAN
08/< /
08/
/96
08/
/96
08/
/96
D
Y
08/
/96