Forwards Insp Repts 50-275/96-13 & 50-323/96-13 on 960528- 0628 & Notice of Violation
ML16343A427
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/16/1996
From: Brockman K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342D415 List:
References
NUDOCS 9608210021
Download: ML16343A427 (10)


See also: IR 05000275/1996013

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

August 16,

1996

Gregory

M. Rueger.

Senior Vice President

and General

Manager

Nuclear Power Generation

Bus. Unit

Pacific Gas

and Electric Company

Nuclear

Power Generation,

B14A

77 Beale Street,

Room 1451

P.O.

Box 770000

San Francisco.

Cali fornia

94177

SUBJECT:

NRC

INSPECTION REPORT 50-275/96-13:

50-323/96-13

AND NOTICE OF

ViOLATION

Dear Mr. Rueger:

On May 28 through June

28,

1996, the

NRC completed

an inspection at your

Diablo Canyon Nuclear

Power Plant,

Units

1 and 2, reactor facilities.

The

enclosed

report presents

the scope

and results of that inspection.

Areas

examined during the inspection

are identified in the report.

Withi'n

these

areas.

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel'nd

observation of

activities in progress.

The purpose of the inspection

was to determine the

effectiveness

of your controls

in identifying, resolving.

and preventing

problems.

The overall results of the inspection are discussed

in the executive

summary

of the enclosed

report.

The inspectors

found, in general,

that your

corrective action program was well structured,

provided

an effective process

for identifying, resolving and preventing plant problems,

and was properly

implemented.

Based

on the results of this inspections

certain licensee activities appeared

to be in violation of NRC requirements

as specified in the enclosed

Notice of

Violation (Notice).. The circumstances

surrounding the violation are described

in detail in the enclosed

report.

Please

note that you are required to

respond to this letter

and should follow the instructions specified in the

enclosed

Notice when preparing your response.

The

NRC will use your response,

in part. to determine whether further enforcement action is necessary

to

ensure

compliance with regulatory requirements.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy 'of

this letter. its enclosures.

and your response will be placed in the

NRC

Public Document

Room (PDR).

To the extent possible,

your

response

should not

include any personal

privacy, proprietary. or safeguards

information so that

it can

be placed in the

PDR without redaction.

96082i 002i 9608i6

PDR

ADCICK 05000275

8

PDR

Pacific Gas

and Electric Company

-2-

Should you have

any questions

concerning this inspection.

we will be pleased

to discuss

them with you.

Sincerely,

Dockets:

50-275

~

50-323

Licenses:

DPR-80

DPR-82

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

50-275/96-13:

50-323/96-13

cc w/enclosures:

Dr. Richard Ferguson

Energy Chair

Sierra

Club CalifoJnia

1100 11th Street,

Suite 311

Sacramento,

Cali fornia

95814

Ms.

Nancy Culver

San Luis Obispo Mothers for Peace

P.O.

Box 164

Pismo Beach, California

93448

Chairman

San Luis Obispo County Board of

Supervisors

Room 370

County Government

Center

San Luis Obispo, California

93408

Kenneth

E.

Brockman, Acting Director

Division of R: actor Safety

Mr. Truman BurnsNMr. Robert Kinosian

California Public Utilities Commission

505 Van Ness,

Rm.

4102

San Francisco.

Cali fornia

94102

Pacific Gas

and Electric Company

-3-

Robert

R. Wellington;-Esq.

Legal

Counsel

Diablo Canyon

Independent

Safety Committee

857 Cass Street,

Suite

D

Monterey, California

93940

Mr. Steve

Hsu

Radiologic Health Branch

State

Department of Health Services

P.O.

Box 942732

Sacramento,

California

94234

Christopher

J.

Warner.

Esq.

Pacific Gas

and Electric Company

P.O.

Box 744Z

San Francisco,

California

94120

Robert

P.

Powers,

Vice President

and Plant Manager

Diablo Canyon

Power Plant

P.O.

Box 56

Avila Beach, California

93424

Pacific Gas

and Electric Company

E-Hail report to D. Nelson

(DJN)

E-Hail report to

NRR Event Tracking System

( IPAS)

bcc to

DMB (IE01)

>

bcc distrib.

by RIV:

L. J. Callan

DRP Director

Branch Chief (DRP/E.

WCFO)

Senior Project Inspector

(DRP/E.

WCFO)

Branch Chief (DRP/TSS)

Leah Tremper

(OC/LFDCB,

HS:

TWFN 9E10)

DRS AI 96-G-00'V8

Resident

Inspector

DRS-PSB

HIS System

RIV File

H.

Hammond

(PAO,

WCFO)

DOCUMENT NAME~I)C613RP. WW

To receive copy of document,

indicate in box: "C" = Copy without enclosures

"E" = Copy with enclosures

"N" = No copy

RI: EB

DBPEREIRA

RI: EB

PMOUALL

SRI: DRP

WCWALKE

C:EB

CAVANDENB

AD:DRS

KEBROCKMA

08/i%96

To receive copy of documen

08/ w/96

t, indicate in box: "C"

08/pJ96

= Copy without

08/ t&96

08//

96

enclosu res

"E" = Copy with enclosures

"N" = No copy

PBE:DRP

HWONG'8/'. / 6"

r) ygftog

AD:DRS

KEBROCKHAN

08/

/96

08/

/96

ALR

R

Y

08/

/96

08/

/96

Paci fic Gas

and Electri c Company

E-Hail report to D. Nelson

(DJN)

E-Hail report to

NRR Event Tracking System

(IPAS)

bcc to

DHB (IE01)

bcc distrib.

by RIV:

L. J. Callan

DRP Director

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

Leah Tremper

(OC/LFDCB.

MS:

TWFN 9E10)

DRS AI 96-G-0098

Resident

Inspector

DRS-PSB

HIS System

RIV File

H.

Hammond

(PAO,

WCFO)

DOCUHENT NAHE~ tlC613RP. WW

To receive copy of document,

indicate in box: "C" = Copy without enclosures

"E" = Copy with enclosures

"N" = No copy

RI: EB

DBPEREIRA

08/ %%96

RI: EB

PMQUALL

08/ w/96

SRI: DRP

WCWALKE

08/<&96

C:EB

CAVANDENB

08/ t&96

AD:DRS

KEBROCKHA

08//

96

To receive copy

f documen t, indicate in box: "C" = Copy without enciosu res

"E" = Copy with enclosures

"N" = No copy

PBE:DRP

r

AD:DRS

HWONG

KEBROCKHAN

08/< /

08/

/96

08/

/96

08/

/96

D

Y

08/

/96