Forwards Insp Repts 50-275/98-07 & 50-323/98-07 on 980215-0328 & Nov.First Violation Involved Failure to Provide Procedure That Assured Proper Storage of Nonseismic Hoist
ML16342E074
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/22/1998
From: Wong H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342E075 List:
References
50-275-98-07, 50-275-98-7, 50-323-98-07, 50-323-98-7, NUDOCS 9804280093
Download: ML16342E074 (10)


See also: IR 05000275/1998007

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

I

ACCESSION NBR:9804280093

DOC.DATE: 98/04/22

NOTARIZED: NO

FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific

Ga

50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific

Ga

AUTH.NAME

AUTHOR AFFILIATION

ONG, H. J.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

RUEGER,G.M.

Pacific Gas

6 Electric Co.

SUBJECT:

Forwards insp repts 50-275/98-07

& 50-323/98-07

on

980215-0328

&. NOV.First violation involved failure to

provide procedure that assured

proper storage of nonseismic

hoist.,

DOCKET

05000275

05000323

DISTRIBUTION CODE: IE01F

COPI)S RECEIVED:LTR g ENCL

l

SIZE:

TITLE: General

(50 Dkt) -Insp Rept/Notice of Vi&oation Response

NOTES:

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

AEOD/T

E CENTER

M PECB

NUDOCS-ABSTRACT

OGC/HDS3

ERNAL: LITCO BRYCE,J H

NRC PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

BLOOM,S

AEOD/SPD/RAB

DEDRO

NRR/DRCH/HHFB

NRR/DRPM/PERB

OE DIR

RGN4

FILE

01

NOAC

NUDOCS FULLTEXT

COPIES

LTTR ENCL

1

1

1

1

1

1

1

'1

1

1

1

1

1

1

1

1

1

1

LQAiopp@go~

AfRCPgoppy

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION

LIS'R

REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTR(

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

19

ENCL

19

gp,g RECT

(4

0

oj

A

+0

+4*4+

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZAORIVE, SUITE 400

ARLINGTON,TEXAS 76011.8064

'April 22,

1998

Gregory M. Rueger, Senior Vice President

and General Manager

Nuclear Power Generation Bus. Unit

Pacific Gas and Electric Company

Nuclear Power Generation, B14A

77 Beale Street, Room 1451

P.O. Box 770000

San Francisco, California 94177

SUBJECT: NRC INSPECTION REPORT 50-275I98-007; 50-323/98-007 AND NOTICE OF

VIOLATION

Dear Mr. Rueger:

From February 15 through March 28, 1998, a routine NRC inspection was conducted at your

Diablo Canyon Nuclear Power Plant, Units 1 and 2 reactor facilities. The enclosed report

presents the scope and results of that inspection.

During the 6-week period covered by this inspection period, your conduct of activities at the

Diablo Canyon Nuclear Power Plant facilitywas generally characterized by safety-conscious

operations, sound engineering and maintenance practices, and good radiation protection

support.

Based on the results of this inspection, violations of NRC requirements were identified. The first

violation involved failure to provide a procedure that assured proper stowage of a nonseismic

hoist. This violation was discovered while Unit 2 was conducting midloop operations, and the

hoist was over the operating residual heat removal pump. The second violation involved a

failure to implement refueling procedures

in that the source range monitor high flux alarm was

not restored when the required number of fuel assemblies were placed in the core. The third

violation involved multiple failures to properly implement the clearance procedure.

Clearance

errors have been a previous concern.

The fourth violation involved a failure to translate the

design of the reactor vessel refueling level indicating system into procedures

in that the

shutdown abnormal operating procedures allowed, for several years, the system to be

pressurized to 400 psig when the design pressure of the system was 50 psig. The initial

corrective actions did not address the procedure change process deficiencies that allowed this

'rror

to occur.

These violations are cited in the enclosed Notice of Violation (Notice) and the circumstances

surrounding the violations are described in detail in the enclosed report.

Please note that you

are required to respond to this letter and should followthe instructions specified in the enclosed

9804280093

980422

PDR

ADQCK 05000275

8

PDR

Pacific Gas and Electric Company

-2-

Notice when preparing your response.

The NRC will use your response,

in part, to determine

whether further enforcement action is necessary

to ensure compliance with regulatory

requirements.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its

enclosures,

and your response will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

Reactor Projects Branch E

Docket Nos.:

50-275

50-323

License Nos.: DPR-80

DPR-82

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

50-275/98-07; 50-323/98-07

cc w/enclosures:

Dr. Richard Ferguson

Energy Chair

Sierra Club California

1100 lith Street, Suite 311

Sacramento,

California 95814

Ms. Nancy Culver

San Luis Obispo Mothers for Peace

P.O. Box 164

Pismo Beach, California 93448

Pacific Gas and Electric Company

-3-

Chairman

San Luis Obispo County Board of

Supervisors

Room 370

County Government Center

San Luis Obispo, California 93408

Mr. Truman Burns>Mr. Robert Kinosian

California Public Utilities Commission

505 Van Ness, Rm. 4102

San Francisco,=California

94102

Robert R. Wellington, Esq.

Legal Counsel

Diablo Canyon Independent Safety Committee

857 Cass Street, Suite D

Monterey, California 93940

Mr. Steve Hsu

Radiologic Health Branch

State Department of Health Services

P.O. Box 942732

Sacramento,

California 94234

Christopher J. Warner, Esq.

Pacific Gas and Electric Company

P.O. Box 7442

San Francisco, California 94120

Robert P. Powers, Vice President

and Plant Manager

Diablo Canyon Power Plant

P.O. Box 56

Avila Beach, California 93424

Managing Editor

Telegram-Tribune

1321 Johnson Avenue

P.O. Box 112

San Luis Obispo, California 93406

J

Pacific Gas and Electric Company

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

'-Mail

report to Document Control Desk (DOCDESK)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File

Resident Inspector

DRS-PSB

MIS System

RIV File

DOCUMENT NAME: R:t DCiDC807RP.DLP

To receive copy of document, indicate In box: "C" = Copy without enclosures

"E" = Copy with enclosures "N"= No copy

RIV:SRI:DRP/E

PE:DRP/E

DRS

SPE:DRP

DRS

C:DRP/E

DLProulx

04/

98

BJOlson;--

TRMeadowsy-

DGAcker

04/g /98 ~

04/~8

04/L/98

OFFICIAL RECORD COPY

MMCNeil+.: HJWong 8'~

04/i/98

~

04/ /98

0