REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
I
ACCESSION NBR:9804280093
DOC.DATE: 98/04/22
NOTARIZED: NO
FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific
Ga
50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific
Ga
AUTH.NAME
AUTHOR AFFILIATION
ONG, H. J.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
RUEGER,G.M.
Pacific Gas
6 Electric Co.
SUBJECT:
Forwards insp repts 50-275/98-07
& 50-323/98-07
on
980215-0328
&. NOV.First violation involved failure to
provide procedure that assured
proper storage of nonseismic
hoist.,
DOCKET
05000275
05000323
DISTRIBUTION CODE: IE01F
COPI)S RECEIVED:LTR g ENCL
l
SIZE:
TITLE: General
(50 Dkt) -Insp Rept/Notice of Vi&oation Response
NOTES:
RECIPIENT
ID CODE/NAME
PD4-2
INTERNAL: ACRS
AEOD/T
E CENTER
M PECB
NUDOCS-ABSTRACT
OGC/HDS3
ERNAL: LITCO BRYCE,J H
NRC PDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
BLOOM,S
AEOD/SPD/RAB
DEDRO
NRR/DRCH/HHFB
NRR/DRPM/PERB
OE DIR
RGN4
FILE
01
NOAC
NUDOCS FULLTEXT
COPIES
LTTR ENCL
1
1
1
1
1
1
1
'1
1
1
1
1
1
1
1
1
1
1
LQAiopp@go~
AfRCPgoppy
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION
LIS'R
REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTR(
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
19
ENCL
19
gp,g RECT
(4
0
oj
A
+0
+4*4+
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZAORIVE, SUITE 400
ARLINGTON,TEXAS 76011.8064
'April 22,
1998
Gregory M. Rueger, Senior Vice President
and General Manager
Nuclear Power Generation Bus. Unit
Pacific Gas and Electric Company
Nuclear Power Generation, B14A
77 Beale Street, Room 1451
P.O. Box 770000
San Francisco, California 94177
SUBJECT: NRC INSPECTION REPORT 50-275I98-007; 50-323/98-007 AND NOTICE OF
VIOLATION
Dear Mr. Rueger:
From February 15 through March 28, 1998, a routine NRC inspection was conducted at your
Diablo Canyon Nuclear Power Plant, Units 1 and 2 reactor facilities. The enclosed report
presents the scope and results of that inspection.
During the 6-week period covered by this inspection period, your conduct of activities at the
Diablo Canyon Nuclear Power Plant facilitywas generally characterized by safety-conscious
operations, sound engineering and maintenance practices, and good radiation protection
support.
Based on the results of this inspection, violations of NRC requirements were identified. The first
violation involved failure to provide a procedure that assured proper stowage of a nonseismic
hoist. This violation was discovered while Unit 2 was conducting midloop operations, and the
hoist was over the operating residual heat removal pump. The second violation involved a
failure to implement refueling procedures
in that the source range monitor high flux alarm was
not restored when the required number of fuel assemblies were placed in the core. The third
violation involved multiple failures to properly implement the clearance procedure.
Clearance
errors have been a previous concern.
The fourth violation involved a failure to translate the
design of the reactor vessel refueling level indicating system into procedures
in that the
shutdown abnormal operating procedures allowed, for several years, the system to be
pressurized to 400 psig when the design pressure of the system was 50 psig. The initial
corrective actions did not address the procedure change process deficiencies that allowed this
'rror
to occur.
These violations are cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding the violations are described in detail in the enclosed report.
Please note that you
are required to respond to this letter and should followthe instructions specified in the enclosed
9804280093
980422
ADQCK 05000275
8
Pacific Gas and Electric Company
-2-
Notice when preparing your response.
The NRC will use your response,
in part, to determine
whether further enforcement action is necessary
to ensure compliance with regulatory
requirements.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its
enclosures,
and your response will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
Reactor Projects Branch E
Docket Nos.:
50-275
50-323
License Nos.: DPR-80
DPR-82
Enclosures:
1.
2.
NRC Inspection Report
50-275/98-07; 50-323/98-07
cc w/enclosures:
Dr. Richard Ferguson
Energy Chair
1100 lith Street, Suite 311
Sacramento,
California 95814
Ms. Nancy Culver
San Luis Obispo Mothers for Peace
P.O. Box 164
Pismo Beach, California 93448
Pacific Gas and Electric Company
-3-
Chairman
San Luis Obispo County Board of
Supervisors
Room 370
County Government Center
San Luis Obispo, California 93408
Mr. Truman Burns>Mr. Robert Kinosian
California Public Utilities Commission
505 Van Ness, Rm. 4102
San Francisco,=California
94102
Robert R. Wellington, Esq.
Legal Counsel
Diablo Canyon Independent Safety Committee
857 Cass Street, Suite D
Monterey, California 93940
Mr. Steve Hsu
Radiologic Health Branch
State Department of Health Services
P.O. Box 942732
Sacramento,
California 94234
Christopher J. Warner, Esq.
Pacific Gas and Electric Company
P.O. Box 7442
San Francisco, California 94120
Robert P. Powers, Vice President
and Plant Manager
Diablo Canyon Power Plant
P.O. Box 56
Avila Beach, California 93424
Managing Editor
Telegram-Tribune
1321 Johnson Avenue
P.O. Box 112
San Luis Obispo, California 93406
J
Pacific Gas and Electric Company
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
report to Document Control Desk (DOCDESK)
bcc to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
DRP Director
Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
WCFO File
Resident Inspector
DRS-PSB
MIS System
RIV File
DOCUMENT NAME: R:t DCiDC807RP.DLP
To receive copy of document, indicate In box: "C" = Copy without enclosures
"E" = Copy with enclosures "N"= No copy
RIV:SRI:DRP/E
PE:DRP/E
SPE:DRP
C:DRP/E
DLProulx
04/
98
BJOlson;--
TRMeadowsy-
DGAcker
04/g /98 ~
04/~8
04/L/98
OFFICIAL RECORD COPY
MMCNeil+.: HJWong 8'~
04/i/98
~
04/ /98
0