Forwards Insp Repts 50-275/95-09 & 50-323/95-09 on 950612-16 & Notice of Violation.Violation of Concern Because Represents Weakness in CAP
ML16342C979
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/07/1995
From: Scarano R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342C980 List:
References
NUDOCS 9507130109
Download: ML16342C979 (12)


See also: IR 05000275/1995009

Text

pe RECT

(4

Wp

gy

~

) '~"'(

I

o

+**~>>

UNIT E O STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PlAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

July 7,

1995

Pacific

Gas

and Electric Company

Nu'clear

Power Generation,

B14A

ATTN:

Gregory

M. Rueger,

Senior Vice

President

and General

Manager

Nuclear

Power Generation

Bus. Unit

77 Beale Street,

Room

1451

P.O.

Box 770000

San Francisco,

California

94177

SUBJECT:

NRC

INSPECTION

REPORT 50-275/95-09;

50-323/95-09

AND NOTICE OF

VIOLATION

i

This refers to the inspection

conducted

by Messrs.

A. Mcgueen

and T. McKernon

of this office on June

12-16,

1995.

The inspection

included

a review of

activities authorized for your Diablo Canyon Nuclear

Power Plant,

Units

1

and

2, facility.

At the conclusion of the inspection,

the findings were

discussed

with those

members of your staff identified in the enclosed

report.

This also refers to a telephone

discussion of the inspection

between

the

inspectors

and Mr, C. Harbor

and other

members of the Diablo Canyon staff on

June

22,

1995.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted

of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

The purpose of the inspection

was to determine

whether activities authorized

by the license

were conducted

safely

and in

accordance

with NRC requirements.

Based

on the results of this inspection,

certain licensed activities appeared

to be in'iolation of NRC requirements,

as specified in the enclosed

Notice of

Violation (Notice).

The violation is of concern

because it represents

a

weakness

in your corrective action program.

While your staff identified

1993

deficiencies

through your fire protection audit of 1994, corrective actions

taken

were ineffective in precluding recurrence of similar deficiencies during

1994.

Therefore,

while corrective actions

taken

by your staff during

1995

appear effective, the violation is being cited because it was

a condition that

could have

been

prevented

by previous corrective actions

taken

by your staff.

You are requ'ired to respond to this letter

and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your

response,

you should

document

the specific actions

taken

and

any additional

actions

you plan to prevent recurrence.

Your response

may reference

or

include previous

docketed

correspondence, if the correspondence

adequately

addresses

the required

response.

After reviewing your response

to this

Notice, including your proposed corrective actions

and the results of future

inspections,

the

NRC will determine

whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

9507%30109

950707

PDR

ADQCK 05000275

6

PDR

0

0

Pacific

Gas

and Electric Company

In accordance

with 10 CFR 2.790 of the

NRC's "Rules of Practice,"

a copy of

this letter, its enclosures,

and your response will be placed

in the

NRC

Public Document

Room

(PDR).

To the extent possible,

your response

should not

include

any personal

privacy, proprietary,

or safeguards

information so that

it can

be placed

in the

PDR without redaction.

However, if you find it

necessary

to include

such information, you should clearly indicate the

specific information that you desire not to be placed in the

PDR,

and provide

the legal basis

to support your request for withholding the information from

the public.

The responses

directed

by this letter and the enclosed

Notice are not subject

to the clearance

procedures

of the Office of Management

and

Budget

as required

by the Paperwork

Reduction Act of 1980,

Pub.

L. No. 96.511.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Dockets:

50-275

50-323

Licenses:

DPR-80

OPR-82

Ross

A. Scarano,

Acting Director

Division of Radiation Safety

and Safeguards

Enclosures:

I.

Notice of Vio']ation

2.

NRC Inspection

Report

50-275/95-09;

50-323/95-09

cc w/enclosures:

Sierra

Club California

ATTN:

Or. Richard

Ferguson

Energy Chair

6715 Rocky Canyon

Creston,

California

93432

Pacific

Gas

and Electric Company

San Luis Obispo

Mothers for Peace

ATTN:

Ms.

Nancy Culver

P.O.

Box

164

Pismo

Beach, California

93448

Ms. Jacquelyn

C. Wheeler

P.O.

Box 164

Pismo

Beach, California

93448

The County Telegram Tribune

ATTN:

Managing Editor

1321

Johnson

Avenue

P.O.

Box

112

San Luis Obispo, California

93406

San Luis Obispo County Board'of

Supervisors

ATTN:

Chairman

Room 370

County Government

Center

San Luis Obispo, California

93408

California Public Utilities Commission

ATTN:

Mr. Truman Burns)Mr. Robert Kinosian

505

Van Ness,

Rm.

4102

San Francisco,

California

94102

Diablo Canyon

Independent

Safety Committee

Attn:

Robert

R. Wellington,

Esq.

Legal

Counsel

857 Cass Street,

Suite

D

Monterey, California

93940

Radiologic Health Branch

State

Department of Health Services

ATTN:

Mr. Steve

Hsu

P.O.

Box 942732

Sacramento,

California

94234

State of California

ATTN:

Mr. Peter

H. Kaufman

Deputy Attorney General

110 West

A Street,

Suite

700

San Diego, California

92101

0

Pacific

Gas

and Electric Company

Pacific

Gas

and Electric Company

ATTN:

Christopher J.

Warner,

Esq.

P.O.

Box 7442

San Francisco,

California

94120

Diablo Canyon Nuclear

Power Plant

ATTN:

Warren

H. Fujimoto, Vice President

and Plant Manager

P.O.

Box 56

Avila Beach, California

93424

Chief, Technological

Hazards

Branch

FEHA Region

IX

ATTN:

Joe

Dominguez

Building 105

Presidio of San Francisco

San Francisco,

California

94129

Pacific

Gas

and Electric Company

-5-

E-Hail report to D. Sullivan

(DJS)

E-Hail report to

NRR Event Tracking System

( IPAS)

bcc to

DMB ( IE35)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E,

WCFO)

RIV File

Leah Tremper

(OC/LFDCB, HS:

T.

W. Dexter,

DRSS/RIB

T. '0.

McKernon,

DRS/OB

Diablo Canyon Resident

Inspector

HIS System

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

TWFN 9E10)

B. Henderson

(PAO,

WCFO)

A. D. McQueen,

WCFO (DRSS/RIB)

i

DOCUMENT NAME:

0:iRIBiADMiDC509RP.ADH

Nia <<) /Jobas4rt,

e~/

RIV: DRSS: RIB

ADMcQueen:nh

06/@9/95

AD:DRSS

AScarano <~

05/ 7/95

DRS:OB

TOHcKerno

06/~Q/95

AC:RIB

TWDexter

06+( /95

ADD:DRSS

CLCain

06/

/9

D:DRP

BBeach ~

0 /7/95

Pacific

Gas

and Electric Company

-5-

E-Mail report to D. Sullivan

(DJS)

E-Hail report to

NRR Event Tracking System

( IPAS)

bcc to

DMB ( IE35)

bcc distrib.

by RIV:

L. J. Callan

DRSS-F IPB

Branch Chief (DRP/E,

WCFO)

RIV File

Leah Tremper

(OC/LFDCB,

MS:

T.

W. Dexter,

DRSS/RIB

T. 0. McKernon,

DRS/OB

Diablo Canyon Resident

Inspector

HIS System

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

TWFN 9EIO)

B. Henderson

(PAO,

WCFO)

A. D. McQueen,

WCFO (DRSS/RIB)

DOCUMENT NAME:

0:iRIBiADMiDC509RP.ADH

..se~l

RIV:DRSS:RIB

ADMcQueen:nh

06/~9/95

AD:DRSS

AScarano g)-0

07/ 7/95

DRS:OB

TOHcKerno

06/@4/95

AC:RIB

TWDexter

06+( /95

ADD:DRSS

CLCain

06/

/9

D:DRP

BBeach ~

0 /-Z/95

0