ENCLOSURE 1
NOTICE OF VIOLATION Pacific Gas and Electric Company Diablo Canyon Nuclear Power Plant Dockets:
50-275 50-323 Licenses:
DPR-80 DPR-82 During an NRC inspection conducted on June 12-16,
- 1995, one violation of NRC requirements was identified.
In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions,"
10 CFR Part 2, Appendix C, the violation is listed below:
Section (q) of 10 CFR Part 50.54 requires licensees to follow and maintain in effect emergency plans which meet the standards in 50.47(b).
Section b(14) of 10 CFR 50.47 requires, in part, that periodic drills to develop and maintain key skills related to emergency response capabilities will be conducted.
Section
- 8. 1. 1.4 of the Emergency
- Plan, Revision 3, Change 13, states, in part, that fire brigade team members are required to participate in at least two quarterly fire drills per year.
Contrary to the above, the licensee failed to conducted quarterly fire drills which ensured that all fire brigade team members participated in at least two quarterly drills during 1994.
This is a Severity Level IV Violation (Supplement VIII) 50-275/9509-02; 50-323/9509-02.
Pursuant to the provisions of 10 CFR 2.201, Pacific Gas and Electric Company is hereby required to submit a written statement or explanation to the U.S.
Nuclear Regulatory Commission, ATTN:
Document Control
- Desk, Washington, D.C.
20555 with a copy to the Regional Administrator, Region IV, 611 Ryan Plaza Drive, Suite 400, Arlington, Texas
- 76011, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice).
This reply should be clearly marked as a "Reply to a Notice of Violation" and should include for each violation:
(1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results
- achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.
Your response may reference or include previous docketed correspondence, if the correspondence adequately addresses the required response.
If an adequate reply is not.received within the time specified in this Notice, an order or a
Demand for Information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken.
Where good cause is shown, consideration will be given to extending the response time.
Dated at Arlington, Texas this 7th day of July 1995 9507i30iii 950707 PDR ADOCK 05000275 8