Forwards Insp Repts 50-275/94-24 & 50-323/94-24 on 940901- 1015 & Notice of Violation.Violation of Concern Because of Involved Alignment of Vital Power to safety-related Sys
ML16342C745
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 11/18/1994
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342C746 List:
References
NUDOCS 9411280037
Download: ML16342C745 (10)


See also: IR 05000275/1994024

Text

A%AMJXL J. l

4

(4 UDOCS OFFSITE FACILITY)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9411280037

DOC.DATE: 94/ll/18

NOTARIZED:

NO

DOCKET

ACIL:50-275 Diablo Canyon Nuclear

Power Plant, Unit 1, Pacific

Ga

05000275

50-323 Diablo Canyon Nuclear

Power Plant, Unit 2, Pacific

Ga

05000323

AUTH.NAME

AUTHOR AFFILIATION

BEACH,A.B.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

RUEGER,G.M.

Pacific Gas

6 Electric Co.

SUBJECT:

Forwards insp repts

50-275/94-24

& 50-323/94-24

on 940901-

1015

& notice of violation.Violation of concern

because

of involved alignment of vital power to safety-related

sys.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIffED:LTR L ENCL 2

SIZE:

+'ITLE:

General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

C

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

AEOD/SPD/RAB

CO

CEN~RRf

NRR/DRCH/HHFB

NUDOCS-ABSTRACT

OGC/HDS3

,f

ERNAL: LITCO BRYCEPJ

H

NRC PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

PETERSON,S

AEOD/DEIB

AEOD/SPD/RRAB

DEDRO

NRR/DORS/OEAB

NRR/PMAS/IRCB-E

OE DIR

RGN4

FILE

01

NOAC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

2'

0'

E,

N

i4'OTE TO ALL"RlDS" RECIPIEih'TS:

PLEASE HELP US TO REDUCE iVASTE!COYTACTTHE DOCL'!ffIEilCONTROL

DESk, ROOWI PI -37 (EXT. 504-

OS3 ) TO ELI%IIYATEi'OI 'R NAME FROi!

DIS I'RIBI.'TIOYLISTS FOR DOCI.'!i!EATSYOL'Oi "I'EED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

20

ENCL

20

E

I

~P,R AE0I

~6

Wp0

\\

Cw)

O

I

~,

C

C

W~*y4

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARI.INGTON,TEXAS 76011-6064

ROY

I 8 IBM

Dockets:

50-275

50-323

Licenses:

DPR-80

DPR-82

Pacific

Gas

and Electric Company

Nuclear

Power Generation,

B14A

ATTN:

Gregory

M. Rueger,

Senior Vice

President

and General

Manager

Nuclear

Power Generation

Bus. Unit

77 Beale Street,

Room

1451

P.O.

Box 770000

San Francisco,

California

94177

SUBJECT:

NRC

INSPECTION

REPORT 50-275/94-24;

50-323/94-24

(NOTICE OF

VIOLATION)

This refers to the inspection

conducted

by M. Tschiltz,

and the inspectors

identified in the enclosed

report, of this office on September

1 through

October

15,

1994.

The inspection

included

a review of activities authorized

for your Diablo Canyon Nuclear

Power Plant,

Units

1 and 2, facility.

At the

conclusion of the inspection,

the findings were discussed

with members of your

staff identified in the enclosed report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

The purpose of the inspection

was to determine

whether activities authorized

by the license

were conducted

safely

and in

accordance

with NRC requirements.

Based

on the results of this inspection,

certain licensed activities appeared

to be in violation of NRC requirements,

as specified in the enclosed

Notice of

Violation (Notice).

The violation involved

a power panel

switch which was not

in the required position

and is of concern

because it was identified by the

NRC and involved alignment of vital power to

a safety-related

system.

Two violations are not being cited.

The first violahion involving the

centrifugal

charging

pumps is not being cited because

the criteria in

Section VII.B.2 of Appendix

C to

10 CFR Part 2 of the NRC's "Rules of

Practice,"

were satisfied,

The second violation, involving improper alignment

of the residual

heat

removal

system during surveillance testing,

is not being

cited because

the criteria in Section VII.B.1 of Appendix

C to

10 CFR Part 2

of NRC's "Rules of Practice"

were satisfied.

The first involved actions

which

resulted

in both centrifugal

charging

pumps

being

made inoperable

in Mode

4

when Technical

Specifications

required that

a minimum of one

pump remain

25u004

94ii280037.94iii8

PDR

ADOCK 05000275

8

PDR

Z I-0

'4

operational.

The second

involved the failure to properly align the residual

heat

removal

system according to procedure

during

pump testing.

Although

10 CFR 2.201 provides for a written statement

of explanation to this

office within 20 days of your receipt of this Notice,

we note that this

violation had

been corrected

and those actions,

including your root cause

analysis,

were reviewed

and found acceptable

during this inspection.

Therefore,

no response

with respect

to this matter is required.

In accordance

with 10 CFR 2.790 of the

NRC's "Rules of Practice,"

a copy of

this letter

and its enclosures will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Enclosures:

l.

Appendix A - Notice of Violation

2.

Appendix

B NRC Inspection

Report

50-275/94-24;

50-323/94-24

with attachments

A. Bill Beach,

Director

Division of Reactor Projects

cc w/enclosures:

Sierra

Club California

ATTN:

Dr. Richard

Ferguson

Energy Chair

6715 Rocky Canyon

Creston,

California

93432

San Luis Obispo

Nothers for Peace

ATTN:

Hs.

Nancy Culver

P.O.

Box 164

Pismo

Beach, California

93448

Ns. Jacquelyn

C. Wheeler

P.O.

Box 164

Pismo

Beach, California

93448

'I

Pacific

Gas

and Electric Company

The County Telegram Tribune

ATTN:

Hanaging Editor

1321 Johnson

Avenue

P.O.

Box 112

San Luis Obispo, California

93406

San Luis Obispo County Board of

Supervisors

ATTN:

Chairman

Room 370

County Government

Center

San Luis Obispo, California

93408

California Public Utilities Commission

ATTN:

Nr. Truman Burns(Hr.

Robert Kinosian

505

Van Ness,

Rm.

4102

San Francisco,

California

94102

Diablo Canyon

Independent

Safety Committee

Attn:

Robert

R. Wellington,

Esq.

Legal

Counsel

857

Cass Street,

Suite

D

Monterey, California

93940

Radiologic Health Branch

State

Department of Health Services

ATTN:

Nr. Steve

Hsu

P.O.

Box 942732

Sacramento,

California

94234

State of California

ATTN:

Nr. Peter

H. Kaufman

Deputy Attorney General

110 West

A Street,

Suite

700

San Diego, California

92101

Pacific

Gas

and Electric

Company

ATTN:

Christopher J.

Warner,

Esq.

P,O.

Box 7442

San Francisco,

California

94120

Diablo Canyon Nuclear

Power Plant

ATTN:

John

Townsend,

Vice President

and Plant Manager

P.O.

Box 56

Avila Beach, California

93424

Pacific

Gas

and Electric Company

E-Mail report to D. Sullivan

(DJS)

bcc to

DMB (IEOl)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E,

WCFO)

RIV Fil e

Leah Tremper

(OC/LFDCB,

MS:

TWFN 9E10)

Resident

Inspector

MIS System

Sr Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

B. Henderson

(PAO,

WCFO)

RIV:SRI:DRP/E*

MTschiltz

11/15/94

  • not available

C:DRP/&

DFKirsch

11/15/94

D

~

ABB

h

11/

/94

1