REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9411280037
DOC.DATE: 94/ll/18
NOTARIZED:
NO
DOCKET
ACIL:50-275 Diablo Canyon Nuclear
Power Plant, Unit 1, Pacific
Ga
05000275
50-323 Diablo Canyon Nuclear
Power Plant, Unit 2, Pacific
Ga
05000323
AUTH.NAME
AUTHOR AFFILIATION
BEACH,A.B.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
RUEGER,G.M.
Pacific Gas
6 Electric Co.
SUBJECT:
Forwards insp repts
50-275/94-24
& 50-323/94-24
on 940901-
1015
& notice of violation.Violation of concern
because
of involved alignment of vital power to safety-related
sys.
DISTRIBUTION CODE:
IEOID
COPIES
RECEIffED:LTR L ENCL 2
SIZE:
+'ITLE:
General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
C
RECIPIENT
ID CODE/NAME
PD4-2
INTERNAL: ACRS
AEOD/SPD/RAB
CO
CEN~RRf
NRR/DRCH/HHFB
NUDOCS-ABSTRACT
OGC/HDS3
,f
ERNAL: LITCO BRYCEPJ
H
NRC PDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
PETERSON,S
AEOD/DEIB
AEOD/SPD/RRAB
DEDRO
NRR/DORS/OEAB
NRR/PMAS/IRCB-E
OE DIR
RGN4
FILE
01
NOAC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2'
0'
E,
N
i4'OTE TO ALL"RlDS" RECIPIEih'TS:
PLEASE HELP US TO REDUCE iVASTE!COYTACTTHE DOCL'!ffIEilCONTROL
DESk, ROOWI PI -37 (EXT. 504-
OS3 ) TO ELI%IIYATEi'OI 'R NAME FROi!
DIS I'RIBI.'TIOYLISTS FOR DOCI.'!i!EATSYOL'Oi "I'EED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
20
ENCL
20
E
I
~P,R AE0I
~6
Wp0
\\
Cw)
O
I
~,
C
C
W~*y4
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
ROY
I 8 IBM
Dockets:
50-275
50-323
Licenses:
DPR-82
Pacific
Gas
and Electric Company
Nuclear
Power Generation,
B14A
ATTN:
Gregory
M. Rueger,
Senior Vice
President
and General
Manager
Nuclear
Power Generation
Bus. Unit
77 Beale Street,
Room
1451
P.O.
Box 770000
San Francisco,
94177
SUBJECT:
NRC
INSPECTION
REPORT 50-275/94-24;
50-323/94-24
(NOTICE OF
VIOLATION)
This refers to the inspection
conducted
by M. Tschiltz,
and the inspectors
identified in the enclosed
report, of this office on September
1 through
October
15,
1994.
The inspection
included
a review of activities authorized
for your Diablo Canyon Nuclear
Power Plant,
Units
1 and 2, facility.
At the
conclusion of the inspection,
the findings were discussed
with members of your
staff identified in the enclosed report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
The purpose of the inspection
was to determine
whether activities authorized
by the license
were conducted
safely
and in
accordance
with NRC requirements.
Based
on the results of this inspection,
certain licensed activities appeared
to be in violation of NRC requirements,
as specified in the enclosed
Notice of
Violation (Notice).
The violation involved
a power panel
switch which was not
in the required position
and is of concern
because it was identified by the
NRC and involved alignment of vital power to
a safety-related
system.
Two violations are not being cited.
The first violahion involving the
centrifugal
charging
pumps is not being cited because
the criteria in
Section VII.B.2 of Appendix
C to
10 CFR Part 2 of the NRC's "Rules of
Practice,"
were satisfied,
The second violation, involving improper alignment
of the residual
heat
removal
system during surveillance testing,
is not being
cited because
the criteria in Section VII.B.1 of Appendix
C to
of NRC's "Rules of Practice"
were satisfied.
The first involved actions
which
resulted
in both centrifugal
charging
pumps
being
made inoperable
in Mode
4
when Technical
Specifications
required that
a minimum of one
pump remain
25u004
94ii280037.94iii8
ADOCK 05000275
8
Z I-0
'4
operational.
The second
involved the failure to properly align the residual
heat
removal
system according to procedure
during
pump testing.
Although
10 CFR 2.201 provides for a written statement
of explanation to this
office within 20 days of your receipt of this Notice,
we note that this
violation had
been corrected
and those actions,
including your root cause
analysis,
were reviewed
and found acceptable
during this inspection.
Therefore,
no response
with respect
to this matter is required.
In accordance
with 10 CFR 2.790 of the
NRC's "Rules of Practice,"
a copy of
this letter
and its enclosures will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
Enclosures:
l.
Appendix A - Notice of Violation
2.
Appendix
B NRC Inspection
Report
50-275/94-24;
50-323/94-24
with attachments
A. Bill Beach,
Director
Division of Reactor Projects
cc w/enclosures:
Sierra
Club California
ATTN:
Dr. Richard
Ferguson
Energy Chair
6715 Rocky Canyon
Creston,
93432
San Luis Obispo
Nothers for Peace
ATTN:
Hs.
Nancy Culver
P.O.
Box 164
Pismo
Beach, California
93448
Ns. Jacquelyn
C. Wheeler
P.O.
Box 164
Pismo
Beach, California
93448
'I
Pacific
Gas
and Electric Company
The County Telegram Tribune
ATTN:
Hanaging Editor
1321 Johnson
Avenue
P.O.
Box 112
San Luis Obispo, California
93406
San Luis Obispo County Board of
Supervisors
ATTN:
Chairman
Room 370
County Government
Center
San Luis Obispo, California
93408
California Public Utilities Commission
ATTN:
Nr. Truman Burns(Hr.
Robert Kinosian
505
Van Ness,
Rm.
4102
San Francisco,
94102
Diablo Canyon
Independent
Safety Committee
Attn:
Robert
R. Wellington,
Esq.
Legal
Counsel
857
Cass Street,
Suite
D
Monterey, California
93940
Radiologic Health Branch
State
Department of Health Services
ATTN:
Nr. Steve
Hsu
P.O.
Box 942732
Sacramento,
94234
State of California
ATTN:
Nr. Peter
H. Kaufman
Deputy Attorney General
110 West
A Street,
Suite
700
San Diego, California
92101
Pacific
Gas
and Electric
Company
ATTN:
Christopher J.
Warner,
Esq.
P,O.
Box 7442
San Francisco,
94120
Diablo Canyon Nuclear
Power Plant
ATTN:
John
Townsend,
Vice President
and Plant Manager
P.O.
Box 56
Avila Beach, California
93424
Pacific
Gas
and Electric Company
E-Mail report to D. Sullivan
(DJS)
bcc to
DMB (IEOl)
bcc distrib.
by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/E,
WCFO)
RIV Fil e
Leah Tremper
(OC/LFDCB,
MS:
TWFN 9E10)
Resident
Inspector
MIS System
Sr Project Inspector