ML16342A750
| ML16342A750 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 04/05/1999 |
| From: | Brockman K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Rueger G PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML16342A751 | List: |
| References | |
| 50-275-99-03, 50-275-99-3, 50-323-99-03, 50-323-99-3, EA-98-517, NUDOCS 9904120262 | |
| Download: ML16342A750 (12) | |
See also: IR 05000275/1999003
Text
CATEGORY 2
REGULATORY INFORMATION DISTRXBUT1ON SYSTEM (RIDS)
SSXON NBR:9904120262
DOC.DATE: 99/04/05
NOTARIZED: NO
DOCKET
ZL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific
Ga
05000275
50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific
Ga
05000323
AUTH.NAME
AUTHOR AFFZL1ATION
BROCKMAN,K.E.
Region
4 (Post
820201)
RECIP . NAME
RECIPIENT AFFILIATION
RUEGER,G.M.
Pacific Gas
Ec Elect'ric Co.
SUBJECT:
Forwards insp repts 50-275/99-03
E 50-323/99-03
on
990124-0306.Three
violations occurred
8 being treated
as
noncited violations, consistent with App
C of Enforcement
Policy.
DISTRIBUTION CODE: IE01F
COPIES
RECEIVED:LTR
ENCL
SXZE
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
r
NOTES:
RECIPIENT
ID CODE/NAME
PD4-2
INTERNAL: ACRS
DEDRO
NRR/DRCH/HOHB
NRR/DRPM/PERB
OE DIR
RGN4
FILE
01
EXTERNAL: LMZTCO MARSHALL
NRC PDR
COPIES
LTTR ENCL
1
1
2
2
1-
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
BLOOM,S
OD/
E
NRR/DRPM/PECB
NUDOCS-ABSTRACT
OGC/HDS3
NOAC
NUDOCS FULLTEXT
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
D
N
NOTE TO ALL "RIDS" RECIPIENTS:
LEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
ESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF
COPXES
REQUIRED: LTTR
18
ENCL
18
O.
"
n
l.
O
Co
~O
+>>*++
EA 98-517
~g$ 4 Rgc~
(,4
C~
+0
~o
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION Iv
611 RYAN PLAZADRIVE, SUITE 400
ARLINGTON,TEXAS 76011-8064
April 5, 1999
Gregory M. Rueger, Senior Vice President
and General Manager
Nuclear Power Generation Bus. Unit
Pacific Gas and Electric Company
Nuclear Power Generation, B32
77 Beale Street, 32nd Floor
P.O. Box 770000
San Francisco, California 94177
SUBJECT:
NRC INSPECTION REPORT NO. 50-275/99-03; 50-323/99-03 AND EXERCISE
Dear Mr. Rueger:
This refers to the inspection conducted on January 24 through March 6,1999, at the Diablo
Canyon Nuclear Power Plant, Units 1 and 2, facility. The enclosed report presents the results
of this inspection.
However,
During the 6-week period covered by this inspection period, your conduct of activities at the
Diablo Canyon Nuclear Power Plant facilitywas generally characterized by safety-conscious
operations, sound engineering and maintenance practices, and good radiation protection
support.
However, four violations of NRC requirements varying in level of significance were
identified.
The most significant violation, which occurred in early 1998, involved the failure to perform an
adequate safety evaluation in accordance with 10 CFR 50.59 for an issue that involved an
unreviewed safety question
(EA 98-517).
Specifically, the issue involved eliminating Diablo
Canyon's dependence
on the Morro Bay Power Plant for reliable offsite power. After
consultation with the Director, Office of Enforcement, the NRC is exercising enforcement
discretion in accordance
with VII.B.6 of the Enforcement Policy and refraining from issuing a
Notice of Violation. Discretion is appropriate because of: (1) confusion surrounding the
determination of whether the change constituted an unreviewed safety question, (2) the
similarity to other issues previously cited for which corrective actions have been taken and are
sufficiently broad to address this violation (EA 98-364), and (3) the apparent improvement in
grid reliabilitythat resulted from the change.
The three additional violations of NRC requirements that occurred are being treated as
noncited violations, consistent with Appendix C of the Enforcement Policy. The circumstances
associated
with each of the noncited violations are described in the enclosed inspection report.
If you contest any of these violations or the severity level of the noncited violations, you should
provide a response within 30 days of the date of this inspection report, with the basis for your
denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington
DC 20555-0001, with copies to the Regional Administrator, Region IV, and the Director, Office
of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001.
9904i20262 990405
ADQCK 05000275
8
0
Pacific Gas and Electric Company
-2-
As we reviewed the aggregate performance during the recently completed Unit 1 refueling
outage described in this report, it was noted that your staff faced a number of challenges such
as the sudden decrease
in reactor coolant system level, the inadvertent loss of spent fuel pool
cooling, and the higher than expected radiological exposure.
Based upon both number and
potential consequences
of these challenges, numerous questions have arisen concerning the
outage control practices at Diablo Canyon.
Therefore, we would like to schedule a meeting with
your management team to discuss your overall performance during Refueling Outage 1R9.
This meeting would seem to be most appropriately conducted following the completion of your
outage self-critique. My staff willcontact your licensing organization to make the appropriate
arrangements.
In accordance with 10 CFR 2.790 of the NRC's "Rules. of Practice," a copy of this letter and
its'nclosure
willbe placed in the NRC Public Document Room (PDR).
Should you have any questions concerning this inspection, we willbe pleased to discuss them
with you.
Sincerely,
en E.
r c
a,
irector
Division of Reactor Projects
Docket Nos.:
50-275
50-323
License Nos.: DPR-80
DPR-82
Enclosure:
NRC Inspection Report No.
50-275/99-03; 50-323/99-03
cc w/enclosure:
Dr. Richard Ferguson
Energy Chair
1100 lith Street, Suite 311
Sacramento,
California 95814
Ms. Nancy Culyer
San Luis Obispo Mothers for Peace
P.O. Box 164
Pismo Beach, California 93448
I
Pacific Gas and Electric Company
Chairman
San Luis Obispo County Board of
Supervisors
Room 370
County Government Center
San Luis Obispo, California 93408
-3-
Mr. Truman BurnshMr. Robert Kinosian
California Public Utilities Commission
505 Van Ness, Rm. 4102
San Francisco, California 94102
Robert R. Wellington, Esq.
Legal Counsel
Diablo Canyon Independent Safety Committee
857 Cass Street, Suite D
Monterey, California 93940
Mr. Steve Hsu
Radiologic Health Branch
State Department of Health Services
P.O. Box 942732
Sacramento,
California 94234
Christopher J. Warner, Esq.
Pacific Gas and Electric Company
P.O. Box 7442
San Francisco, California 94120
David H. Oatley, Vice President
Diablo Canyon Operations and Plant Manager
Diablo Canyon Nuclear Power Plant
P.O. Box 3
Avila Beach, California 93424
Managing Editor
Telegram-Tribune
1321 Johnson Avenue
P.O. Box 112
San Luis Obispo, California 93406
0
I
Pacific Gas and Electric Company
-4-
APR -~
l999
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bcc to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
DRP Director
DRS Director
Branch Chief (DRP/E)
Senior Project Inspector (DRP/E)
Branch Chief (DRP/TSS)
Resident Inspector
DRS-PSB
MIS System
RIV File
DOCUMENT NAME: R:t DC'tDC903RP.DLP
To receive co
of document, Indicate in box: "C" = Co
without enclosures
"E" = Co
with enclosures "N" = No co
RIV: RI
DECor orand
04/02/99
DLProulx*
04/02/99
C:DRS/PS
6MGood*
04/02/99
D:ACES
GWSanborn
04/02/99
C:DRP/E
LJSmith *
04/02/99
D:DRP
KEBrockman
04
/99
- Previously concurred
04/ /99
04/ /99
04/ /99
OFFICIAL RECORD COPY
04/ /99
Pacific Gas and Electric Company
-4-
APR -6
I999
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bcc to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
DRP Director
DRS Director
Branch Chief (DRP/E)
Senior Project Inspector (DRP/E)
Branch Chief (DRP/TSS)
Resident Inspector
DRS-PSB
MIS System
RIV File
DOCUMENT NAME: R:+DC'tDC903RP.DLP
To receive co
of document, indicate In box: "C" = Co
without encIosures
"E" = Co
with enclosures "N" = No co
RIV: RI
DECor orand
04/02/99
DLProulx*
04/02/99
C:DRS/PS
6MGood*
04/02/99
D:ACES
GWSanborn *
04/02/99
C:DRP/E
LJSmith *
04/02/99
D:DRP.
KEBrockman
04
/99
"Previously concurred
04/ /99
04/ /99
04/ /99
04/ /99
OFFICIALRECORD COPY