Forwards Insp Repts 50-275/99-03 & 50-323/99-03 on 990124-0306.Three Violations Occurred & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy
ML16342A750
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/05/1999
From: Brockman K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342A751 List:
References
50-275-99-03, 50-275-99-3, 50-323-99-03, 50-323-99-3, EA-98-517, NUDOCS 9904120262
Download: ML16342A750 (12)


See also: IR 05000275/1999003

Text

CATEGORY 2

REGULATORY INFORMATION DISTRXBUT1ON SYSTEM (RIDS)

SSXON NBR:9904120262

DOC.DATE: 99/04/05

NOTARIZED: NO

DOCKET

ZL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific

Ga

05000275

50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific

Ga

05000323

AUTH.NAME

AUTHOR AFFZL1ATION

BROCKMAN,K.E.

Region

4 (Post

820201)

RECIP . NAME

RECIPIENT AFFILIATION

RUEGER,G.M.

Pacific Gas

Ec Elect'ric Co.

SUBJECT:

Forwards insp repts 50-275/99-03

E 50-323/99-03

on

990124-0306.Three

violations occurred

8 being treated

as

noncited violations, consistent with App

C of Enforcement

Policy.

DISTRIBUTION CODE: IE01F

COPIES

RECEIVED:LTR

ENCL

SXZE

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

r

NOTES:

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

DEDRO

NRR/DRCH/HOHB

NRR/DRPM/PERB

OE DIR

RGN4

FILE

01

EXTERNAL: LMZTCO MARSHALL

NRC PDR

COPIES

LTTR ENCL

1

1

2

2

1-

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

BLOOM,S

OD/

CE

E

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS3

NOAC

NUDOCS FULLTEXT

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

0

D

N

NOTE TO ALL "RIDS" RECIPIENTS:

LEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

ESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF

COPXES

REQUIRED: LTTR

18

ENCL

18

O.

"

n

l.

O

Co

~O

+>>*++

EA 98-517

~g$ 4 Rgc~

(,4

C~

+0

~o

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION Iv

611 RYAN PLAZADRIVE, SUITE 400

ARLINGTON,TEXAS 76011-8064

April 5, 1999

Gregory M. Rueger, Senior Vice President

and General Manager

Nuclear Power Generation Bus. Unit

Pacific Gas and Electric Company

Nuclear Power Generation, B32

77 Beale Street, 32nd Floor

P.O. Box 770000

San Francisco, California 94177

SUBJECT:

NRC INSPECTION REPORT NO. 50-275/99-03; 50-323/99-03 AND EXERCISE

OF ENFORCEMENT DISCRETION

Dear Mr. Rueger:

This refers to the inspection conducted on January 24 through March 6,1999, at the Diablo

Canyon Nuclear Power Plant, Units 1 and 2, facility. The enclosed report presents the results

of this inspection.

However,

During the 6-week period covered by this inspection period, your conduct of activities at the

Diablo Canyon Nuclear Power Plant facilitywas generally characterized by safety-conscious

operations, sound engineering and maintenance practices, and good radiation protection

support.

However, four violations of NRC requirements varying in level of significance were

identified.

The most significant violation, which occurred in early 1998, involved the failure to perform an

adequate safety evaluation in accordance with 10 CFR 50.59 for an issue that involved an

unreviewed safety question

(EA 98-517).

Specifically, the issue involved eliminating Diablo

Canyon's dependence

on the Morro Bay Power Plant for reliable offsite power. After

consultation with the Director, Office of Enforcement, the NRC is exercising enforcement

discretion in accordance

with VII.B.6 of the Enforcement Policy and refraining from issuing a

Notice of Violation. Discretion is appropriate because of: (1) confusion surrounding the

determination of whether the change constituted an unreviewed safety question, (2) the

similarity to other issues previously cited for which corrective actions have been taken and are

sufficiently broad to address this violation (EA 98-364), and (3) the apparent improvement in

grid reliabilitythat resulted from the change.

The three additional violations of NRC requirements that occurred are being treated as

noncited violations, consistent with Appendix C of the Enforcement Policy. The circumstances

associated

with each of the noncited violations are described in the enclosed inspection report.

If you contest any of these violations or the severity level of the noncited violations, you should

provide a response within 30 days of the date of this inspection report, with the basis for your

denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington

DC 20555-0001, with copies to the Regional Administrator, Region IV, and the Director, Office

of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001.

9904i20262 990405

PDR

ADQCK 05000275

8

PDR

0

Pacific Gas and Electric Company

-2-

As we reviewed the aggregate performance during the recently completed Unit 1 refueling

outage described in this report, it was noted that your staff faced a number of challenges such

as the sudden decrease

in reactor coolant system level, the inadvertent loss of spent fuel pool

cooling, and the higher than expected radiological exposure.

Based upon both number and

potential consequences

of these challenges, numerous questions have arisen concerning the

outage control practices at Diablo Canyon.

Therefore, we would like to schedule a meeting with

your management team to discuss your overall performance during Refueling Outage 1R9.

This meeting would seem to be most appropriately conducted following the completion of your

outage self-critique. My staff willcontact your licensing organization to make the appropriate

arrangements.

In accordance with 10 CFR 2.790 of the NRC's "Rules. of Practice," a copy of this letter and

its'nclosure

willbe placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we willbe pleased to discuss them

with you.

Sincerely,

en E.

r c

a,

irector

Division of Reactor Projects

Docket Nos.:

50-275

50-323

License Nos.: DPR-80

DPR-82

Enclosure:

NRC Inspection Report No.

50-275/99-03; 50-323/99-03

cc w/enclosure:

Dr. Richard Ferguson

Energy Chair

Sierra Club California

1100 lith Street, Suite 311

Sacramento,

California 95814

Ms. Nancy Culyer

San Luis Obispo Mothers for Peace

P.O. Box 164

Pismo Beach, California 93448

I

Pacific Gas and Electric Company

Chairman

San Luis Obispo County Board of

Supervisors

Room 370

County Government Center

San Luis Obispo, California 93408

-3-

Mr. Truman BurnshMr. Robert Kinosian

California Public Utilities Commission

505 Van Ness, Rm. 4102

San Francisco, California 94102

Robert R. Wellington, Esq.

Legal Counsel

Diablo Canyon Independent Safety Committee

857 Cass Street, Suite D

Monterey, California 93940

Mr. Steve Hsu

Radiologic Health Branch

State Department of Health Services

P.O. Box 942732

Sacramento,

California 94234

Christopher J. Warner, Esq.

Pacific Gas and Electric Company

P.O. Box 7442

San Francisco, California 94120

David H. Oatley, Vice President

Diablo Canyon Operations and Plant Manager

Diablo Canyon Nuclear Power Plant

P.O. Box 3

Avila Beach, California 93424

Managing Editor

Telegram-Tribune

1321 Johnson Avenue

P.O. Box 112

San Luis Obispo, California 93406

0

I

Pacific Gas and Electric Company

-4-

APR -~

l999

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

DRS Director

Branch Chief (DRP/E)

Senior Project Inspector (DRP/E)

Branch Chief (DRP/TSS)

Resident Inspector

DRS-PSB

MIS System

RIV File

DOCUMENT NAME: R:t DC'tDC903RP.DLP

To receive co

of document, Indicate in box: "C" = Co

without enclosures

"E" = Co

with enclosures "N" = No co

RIV: RI

DECor orand

04/02/99

SRI

DLProulx*

04/02/99

C:DRS/PS

6MGood*

04/02/99

D:ACES

GWSanborn

04/02/99

C:DRP/E

LJSmith *

04/02/99

D:DRP

KEBrockman

04

/99

  • Previously concurred

04/ /99

04/ /99

04/ /99

OFFICIAL RECORD COPY

04/ /99

Pacific Gas and Electric Company

-4-

APR -6

I999

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

DRS Director

Branch Chief (DRP/E)

Senior Project Inspector (DRP/E)

Branch Chief (DRP/TSS)

Resident Inspector

DRS-PSB

MIS System

RIV File

DOCUMENT NAME: R:+DC'tDC903RP.DLP

To receive co

of document, indicate In box: "C" = Co

without encIosures

"E" = Co

with enclosures "N" = No co

RIV: RI

DECor orand

04/02/99

SRI

DLProulx*

04/02/99

C:DRS/PS

6MGood*

04/02/99

D:ACES

GWSanborn *

04/02/99

C:DRP/E

LJSmith *

04/02/99

D:DRP.

KEBrockman

04

/99

"Previously concurred

04/ /99

04/ /99

04/ /99

04/ /99

OFFICIALRECORD COPY