Text
CATEGORY 2
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CCESSXON NBR:9812090271
DOC.DATE: 98/12/04
NOTARIZED: NO
DOCKET
ACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific
Ga
05000275
50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific
Ga
05000323
AUTH.NAME
AUTHOR AFFILIATION
MURRAY,B.
Region
4 (Post
820201)
RECIP.NAME
.
RECIPIENT AFFILIATION
RUEGER,G.M.
Pacific Gas
& Electxic Co.
SUBJECT:
Forwards partially withheld insp repts 50-275/98-19
6
50-323/98-19
on 981116-19
& NOV (ref 10CFR73.21).Violation
re failuxe to perfoan annual requalification of warehouse
personnel
responsible for conducting package
searches.
DISTRIBUTION CODE:
IE04D
COPIES
RECEIVED:LTR
I
ENCL
I
SIZE: 5
TITLE: Safeguards
Inspection
Rpt/NOV Response
(50 DKT)-Publicly, Available
E
NOTES:
N
G
RECIPIENT
ID CODE/NAME
PD4-2
COPIES
LTTR ENCL
1
1
RECIPIENT
ID CODE/NAME
BLOOM, S'OPIES
LTTR ENCL
1
1
XNTERNAL: ACRS
NRR/DRPM/PERB
NUDOCS-ABSTRACT
RGN4
FILE
01
1
.
1
1
1
1
1
2.
1
FILE CENTER
1
'
NUDOCS FULLTEXT
1
1
OE DIR
1
1
TERNAL: NOAC
NRC PDR
1
1
D
N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE TH
NUMBER OF COPIES RECEIVED BY YOU.OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 4l5-2083
TOTAL NUMBER OF COPIES
REQUIRED: 'LTTR
11
ENCL
11
L
UNiTEDSTATES
J~
NUCLEAR REGULATORY COMMISSION
DOCUMENTCONTAINS
11
L
oA
E, sUITE ~AFEQUARDS INFORMATION
ARllNGTON,TEXAS 76011%064
December
4,
1998
Gregory M. Rueger, Senior Vice President
and General Manager
Pacific Gas and Electric Company
Nuclear Power Generation
Diablo Canyon Nuclear Power Plant
P.O. Box 3
Avila Beach, California 93424
SUBJECT: NRC INSPECTION REPORT 50-275/98-19; 50-323/98-19 AND NOTICE OF
VIOLATION
Dear Mr. Rueger.
From November 16-19, 1998,
a physical security inspection was conducted at your Diablo
Canyon Nuclear Power Plant, Units 1 and 2 reactor facilities. The enclosed report presents the
scope and results of that inspection.
During this inspection, one violation of NRC requirements was identified involving the failure to
perform annual requalification of warehouse personnel responsible for conducting material and
package searches.
The violation is cited in the enclosed Notice ofViolation (Notice) and the
circumstances
surrounding the violation are described in detail in the enclosed report. The NRC
has concluded that information regarding the reason for the violation, the corrective actions taken
and planned to correct the violation and prevent recurrence is already adequately addressed
on
the docket in the enclosed report. Therefore, you are not required to respond to this letter unless
the description therein does not accurately reflect your corrective actions or your position.
In that
case, or.ifyou choose to provide additional information, you should followthe instructions
.
specified in the enclosed Notice.
The material enclosed herewith contains,Safeguards
information as defined by.10 CFR 73.21,
and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy
Act of 1954, as amended.
Therefore, the material will~o be placed in the Public Document
Room.
DOCUMENT CONTAINS
SAFEGUARDS INFORMATION
Vaca090ma
~aaaoe
ADOCK 05000275
8
ENCLOSURE(S) CONTAIN(S)
'SAFEGUARDS INFORMATION
UPON SEPARATION THIS
PAGE IS DECONTROLLED
0
Pacific Gas and Electric Company
-2-
DOCUMENT CONTAINS
SAFEGUARDS INFORMATION
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
Docket Nos.:
50-275
50-323.
License Nos.: DPR-80
DPR-82
Enclosures:
1.
'.
NRC inspection Report
50-275/98-19; 50-323/98-19
cc w/enclosures:
Dr. Richard Ferguson
Energy Chair
1100 lith Street, Suite 311
Sacramento,
California 95814
Ms. Nancy Culver
San Luis Obispo Mothers for Peace
P.O. Box 164
Pismo Beach, California 93448
Chairman
San Luis Obispo County Board of
Supervisors
Room 370
County Government Center
San Luis Obispo, California 93408
Blaine Murray, C ief
Plant Support Branch
Division of Reactor Safety
DOCUMENT CONTAINS
SAFEGUARDS INFORMATION
ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION
UPON SEPARATION THIS
PAGE IS DECONTROLLED
0
Pacific Gas and Electric Company
Mr. Truman BumsUMr. Robert Kinosian
California Public Utilities Commission
505 Van Ness, Rm. 4102
San Francisco, California 94102
Robert R. Wellington, Esq.
Legal Counsel
Diablo Canyon Independent Safety Committee
857 Cass Street, Suite D
Monterey, California 93940
Mr. Steve Hsu
Radiologic Health Branch
State Department of Health Services
P.O. Box 942732
Sacramento,
California 94234
Christopher J. Warner, Esq.
Pacific Gas and Electric Company
P.O. Box 7442
San Francisco, California 94120
N
David H. Oatley, Vice President
Diablo Canyon Operations and Plant Manager
Diablo Canyon Nuclear Power Plant
P.O. Box 3
Avila Beach, California 93424
Managing Editor
Telegram-Tribune
1321 Johnson Avenue
P.O. Box 112
San Luis Obispo, California 93406
-3-
DOCUMENT CONTAINS
SAFEGUARDS INFORMATION
DOCUMENT CONTAINS
SAFEGUARDS INFORMATION
ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION
. UPON SEPARATION THIS
PAGE IS DECONTROLLED
~ Pacific Gas and Electric Company
4-
DOCUMENT CONTAINS
SAFEGUARDS INFORMATION
DISTRIBUTIONwith co
of entire SAFEGUARDS re ort:
Elaine Koup, NRR/DRPM/PSGB, (MS 011-E22)
RIV,Docket File
DRS/PSB Security File (Hodges)
Security Inspector Earnest
Diablo Canyon Resident Inspector
DISTRIBUTIONwithout SAFEGUARDS
ortion of the re ort:
E-Mail - T. Fiye (TJF)
E-Mail - D. J. Lange (DJL)
E-Mail - NRR Event Tracking System (IPAS)
E-Mail - Document Control Desk (DOCDESK):
DMB IE-04
Regional Administrator
DRS Director
DRS Deputy Director
DRP Director
Branch Chief (DRP/Diablo Canyon)
Senior Project Engineer (DRP/Diablo Canyon)
Branch Chief (DRPiTSS)
Branch Chief, DRS>PSB
Ellen Poteat, OCFO/LFARB (MS TWFN 9310)
MIS System
RIV File
DOCUMENT NAME: R:i DC<DC819RP.ABE
To receive co
of document, indicate in box: "C" = Co
without enclosures "E" = Co
with enciosures "N"-" Ho co
RIV:PSB
ABEarnest:nh
12/3l'98
C:PSB
BM rra
12
98
C:DRPiE
E
GPick
12&/98
OFFICIALRECORD COPY
DOCUMENT CONTAINS
SAFEGUARDS INFORMATION
ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION
UPON SEPARATION THIS
PAGE IS DECONTROLLED
Pacific Gas and Electric Company
-4-
DOCUMENT CONTAINS
SAFEGUARDS INFORMATION
DISTRIBUTIONwith co
of entire SAFEGUARDS re ort:
Elaine Koup, NRR/DRPM/PSGB, (MS 011-E22)
RIV Docket File
DRS/PSB Security File (Hodges)
Security Inspector Earnest
Diablo Canyon Resident Inspector
DISTRIBUTIONwithout SAFEGUARDS
ortion of the re ort:
E-Mail - T. Frye (TJF)
E-Mail - D. J. Lange (DJL)
E-Mail- NRR Event Tracking System (IPAS)
E-Mail - Document Control Desk (DOCDESK):
DMB IE-04
Regional Administrator
DRS Director
DRS Deputy Director
DRP Director
Branch Chief (DRP/Diablo Canyon)
Senior Project Engineer (DRP/Diablo Canyon)
Branch Chief (DRP~iTSS)
Branch Chief, DRS>PSB
Ellen Poteat, OCFO/LFARB (MS TWFN 9310)
MIS System
~ RIV File
DOCUMENT NAME: R:5 DCitDC819RP.ABE
To receive co
of document
Indicate in box: "C" = Co
without enclosures
"E" = Co
with enctosures "N"= No co
RIV:PSB
ABEamest:nh
12/$ 98
C:PSB
BM rra
1
98
C:DRP~tE
E
GPick 8@1
12'/98
OFFICIAL RECORD COPY
DOCUMENT CONTAINS
SAFEGUARDS INFORMATION
ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION
UPON SEPARATION THIS
PAGE IS DECONTROL'LED