ML16341G051

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-275/91-03 & 50-323/91-03 on 910203- 0316 & Notice of Violation
ML16341G051
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/11/1991
From: Richards S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341G052 List:
References
NUDOCS 9104290039
Download: ML16341G051 (6)


See also: IR 05000275/1991003

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1450 MARIALANE,SUITE 210

WALNUTCREEK, CALIFORNIA94596

R

~

1 ]gSl

Docket Nos.

50-275

and 50-323

Pacific Gas

and Electric Company

77 Beale Street,

Room 1451

San Francisco,

California 94106

Attention:

Mr.'.

D. Shiffer, Senior Vice President

and General

Manager

Nuclear

Power Generation

Gentlemen:

Subject:

NRC Inspection of Diablo Canyon Units 1 and

2

,.This refers to the routine inspection

conducted

by Messrs.

P.

P. Narbut,

K.

E.

Johnston,

B.

M, Olson,

and

P.

Galon during the period of February

3 thr ough

March 16,

1991.

This inspection

examined your activities

as authorized

by NRC

License

Nos.

DPR-80 and DPR-82.

At the conclusion of the inspection,

discussions

of their findings were held with Mr. J.

D. Townsend,

and other

members of your staff.

Areas examined during this inspection are described

in the enclosed

inspection

report.

Within these areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

Your attention is drawn to paragraph

S.a of the enclosed report, which

discusses

the intake structure's

exposure to sea water and the r'esulting

problems with equipment corrosion

and degradation.

We-recognize that thus

.far, this problem has apparently not significantly affected safety-related

systems

contained in the intake structure,

however

we are concerned that

degradation of the balance of plant equipment located in the intake structure

could result in a plant transient,

or that eventually safety"related

equipment

will be impacted.

Based

on the results of this inspection, it appears that one of your

activities was not conducted in full compliance with NRC requirements,

as set

forth in the Notice of Violation, enclosed

herewith as Appendix A.

Your

response

to this notice is to be submitted in accordance

with the provisions

of 10 CFR 2.201,

as stated in Appendix A, Notice of Violation.--

In accordance

with 10 CFR 2.790 (a),

a copy of this letter and the enclosures

will be placed in the

NRC Public Document

Room.

The response

directed

by this letter is not subject to the clearance

procedures

of the Office of Management

and Budget

as required by the Paperwork

Reduction Act of 1980,

PL 96-511.

'9104290039

910411

PDR

ADOCK 0'0027

PDR

'

-2-

ApR i 1

1991

. Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

S.

A. Richards,

Chief

Reactor Projects

Branch

Enclosures:

1.

Inspection

Report

kos.

50-275/91-03

and 50-323/91-03.

2.

Appendix A, Notice of Violation

cc w/enclosure:

J. A..Sexton,

PG&E

R.

F.

L'ocke,

. PG&E

J.

D. Townsend,

PG&E (Diablo Canyon)

D.

A. Taggert,

PG&E (Diablo Canyon)

T.

L. Grebel,

PG&E (Diablo Canyon)State

of California

News Services,

PG8E

State of California

Sandra Silver (Report Only)

'

-3-

APR i i 1S9i

bcc w/enclosures:

Docket File

'.

Cook

B. Faulkenberry

J. Martin .

Project Inspector

Resident Inspector

bcc w/enclosure

2:

J. Zollicoffer

N. Western

M. Smith

'EGION

V/Q~

PGalon g~~

BOlson >~

4/~) /91 ~

4/ii/91

KJohnston

4/o /91

PNarbut

4/ n/91

AJoh son

4/ I ~/91

REQUEST

COPY ] REQUEST

Y ] REgUEST~PY ]

EST

COPY ] RE/VEST

Y

3

YES /

NO

YES /

NO

3

YES /~

YES /

NO

YES /

NO

DSchaefer

4/ "/91

s~~

PMorriT1

HWong

4/P /91

4/J( /91

4/<i /91

RE/VEST

PY ]

EST

COPY

3

REQUEST

YES /

NO

YES /

NO

YES /

NO

3

EST

COPY ]

ES /

NO

TO PDR)

YES /

NO