Text
ACCELERATED DISHUBUTION DEMONSTjRATION SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CESSION NBR:9005010265
DOC.DATE: 90/04/16
NOTARIZED: NO
DOCKET
Iz
A'CIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific
Ga
05000275
50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific
Ga
05000323
AUTH.NAME
AUTHOR AFFILIATION
ZIMMERMAN,R.P.
Region 5, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
SHIFFER,J.D.
Pacific Gas
& Electric Co.
SUBJECT:
Forwards
SALP Mgt Meeting Repts 50-275/90-12
& 50-323/90-12
on 900313.
DISTRIBUTION CODE:
IE40D
COPIES
RECEIVED:LTR J
ENCL J
SIZE:
TITLE: Systematic
Assessment
of Licensee
Performance
(SALP) Report
NOTES
RECIPIENT
ID CODE/NAME
PD5
LA
ROOD, H
INTERNAL
AEOD/DSP/TPAB
DEDRO
NRR/DLPQ/LHFB11
NRR/DOEA/OEAB11
NRR/DREP/PRPB11
NRR/DRIS/RSIB9A
NUDOCS-ABSTRACT
OGC/HDS2
RGN5
FILE
01
EXTERNAL: L ST LOBBY WARD
NRC PDR
COPIES
LTTR ENCL
1
0
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
PD5
AEOD/DOA
COMMISSION
NRR SHANKMAN,S
NRR/DLPQ/LPEB10
NRR/DREP/PEPB9D
NRR/DRIS/RSGB9D
NRR/PMAS/ILRB12
0
REG FILE
02
LPDR
COPIES
LTTR ENCL
1
1
1
1
5
5
1
1
1
1
1
1
'
2
1
1
1
1
1
1
1
1
1
1
NOTE TO ALL"RIDS" RECIPIENTS:
OTAL NUMBER OF COPIES
REQUIRED:
LTTR
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENI'ONTROLDESK,
ROOM PI-37 (EXT, 20079) TO ELIMINATEYOUR NAMEFROM DISIRIBUTION
LISES FOR DOCUMENTS YOU DON'T NEEDl
32
ENCL
31
APR I g
ig~g
Docket Nos.
50-275
and 50-323
Pacific Gas
and Electric Company
77 Beale Street,
Room 1451
San Francisco,
California 94106
Attention:
Mr. J.
D. Shiffer, Senior
Vice President
Nuclear Power Generation
Gentlemen:
Subject:
SALP MANAGEMENT MEETING
This refers to the management
meeting held with Mr. Maneatis, yourself,
and
members of your staff at the Diablo Canyon
Power Plant
on March 22,
1990.
Subjects
discussed
during the meeting are
summarized
in the enclosed
meeting
report.
In summary,
the meeting focused
on the March 13,
1990 Diablo Canyon Systematic
Assessment
of Licensee
Performance
(SALP) report which found that overall
PG8E
performance
had improved in all areas,
but that
PG8E appeared
to be slow to
recognize
problem areas
and to fully implement corrective actions.
Specific
discussion
focused
on your actions to address
the timely resolution of
problems,
the reorganization of the equality Assurance
area,
and the
development of the Engineering organization.
Me acknowledged that you and
your staff appear to recognize
the issues
and have taken steps
to address
them.
Me look forward to future discussions
on your progress
in these
areas.
No response
to this letter is required;
however,
as discussed
in the
meeting, written comments
regarding the meeting or SALP report
may be provided
within 30 days of this meeting.
If you have
any questions
concerning this
report,
do not hesitate
to contact
us.
In accordance
with 10 CFR 2. 790 (a),
a copy of this letter and enclosures
wi 11
be placed in the
NRC Public Document
Room.
Division of Reactor Safety
and
projects
Enclosure:
Inspection Report Nos.
50-275/90-12
and 50-323/90-12
-2-
cc w/enclosures:
J.
A. Sexton,
PG8E
R.
F.
Locke,
J.
D. Townsend,
PG8E (Diablo Canyon)
D.
A. Taggert,
PG8E (Diablo Canyon)
T.
L. Grebel,
PG8E (Diablo Canyon)
State of California
Sandra Silver (Report Only)
bcc w/enclosures
Project Inspector
Resident
Inspector
docket file
G.
Cook
A. Chaffee
R.
Zimmerman
B. Faulkenberry
J. Hartin
REGION V/dot
PN
bu
KJohnston
4/
O
4/p/SO
HHendonca
4/~/9O
YE
/
0
]
ES /
NO
YES /