ML16341E999

From kanterella
Jump to navigation Jump to search
Forwards Mgt Meeting Repts 50-275/89-06 & 50-323/89-06 on 890126.Concern Noted Re Large Number of Personnel Errors Continuing to Exist at Facilities
ML16341E999
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/08/1989
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341F000 List:
References
NUDOCS 8902270459
Download: ML16341E999 (6)


See also: IR 05000275/1989006

Text

gt CP~ ~TED

DISIBU'IIOY

DEMONDTRAPN

SYSTEM

RECIPIENT

ID CODE/NAME

ROOD,H

AEOD

DEDRO

NRR/DEST DIR

. NRR/DLPQ/QAB 10

NRR/DREP/EPB

10

NRR/DRIS DIR 9A

NUDOCS-ABSTRACT

OGC/HDS2

RGN5

FILE'1

D

INTERNAL: ACRS

AEOD/DEIIB

NRR SHANKMAN,S

NRR/DLPQ/PEB 11

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NRR/PMAS/ILRB12

QE~XEBE

,J

02

2

2

1

1

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

1

1"

1

1

1

1

1

1

1

1

1

1

1

1

1

1

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

A

SION NBR 8902270459

DOC.DATE: 89/02/08

NOTARIZED: NO

DOCKET g.

FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific Ga

05000275

50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga

05000323

AUTH.NAME

AUTHOR AFFILIATION

FAULKENBERRY,B.

Region 5, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

SHIFFER,J.D.

Pacific Gas

& 'Electric Co.

R

SUBJECT:

Forwards Mgt Meeting Repts 50-275/89-06

& 50-323/89-06

on

I

. 890126.Concern, noted re large number of personnel errors.

DISTRIBUTION CODE: IEOID

COPIES'RECEIVED:LTR

ENCL Q

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Vio ation Response

S

NOTES:

RECIPIENT 'OPIES

COPIES,

ID CODE/NAME

LTTR ENCL

LTTR ENCL=

PD5

PD

1

1

1

1

EXTERNAL

LPDR

NSIC

1

1

1

1

NRC PDR

1

1

NOTE K) ALL "RIDS" RECIPIENIS:

pLEAsE HELx Us m REDUcE ATE!

coNrAcr mE DocUMENT GDNHKL DEsK,

ROOM Pl-37

(EXT. 20079) K) ELOCUTE YOUR NAME FMH DIPEKBVZZON

LXPIS H)R DOCUMENIS YOU DON'T NEED!

.D

D

S

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

25

ENCL

25

Docket Nos.

50-275, and 50-323

Pacific

Gas

and Electric Company

77 Beale Street,

Room 1451

San Francisco,

California

94106

Attention:

Mr. J.

D., Shiffer, Vice President

Nuclear

Power Generation

Gentlemen:

Subject:

January

26,

1989,

Management

Meeting

This refers to the management

meeting held with Mr. Townsend

and Mr. Tresler,

of your staff, at the Diablo Canyon Nuclear

Power Plant

on January

26,

1989,

in which the following topics were 'discussed:

(1) the large

number of

operational

errors that have occurred

over the last several

months,

(2) the

perceived

lack of progress of the configuration management

and system

engineeririg

programs,

and (3)

PG&E's pursuit of the industry's rising

standard of excellence.

As

a result of our discussion it is

my understanding

that Mr. Tresler will

initiate a meeting with NRC'Region

V senior management,

sometime in February

or March of 1989, to provide us with a thorough understanding

of the

PG&E

Configuration Management

Program

and the progress

that is being

made in the

development

and implementation of this program.

As discussed

with Mr. Townsend,

we continue to have concern with the large

number of personnel

errors that are continuing to occur at Diablo Canyon.

A

number of these errors

are discussed

in

NRC Inspection

Report Nos. 50-275/88-31

and 50-323/88-29.

This concern

was discussed

with you and your staff at the

SALP Management

Meeting

on October 26, l988.

I encourage

you and Mr. Townsend

to continue to focus

on this problem and

make, every effort to significantly

decrease

the

number of these errors within the near future.

Sincerely,

Ori~i'r@ 8@~

Deputy Regional Administrator

Enclosure:

Inspection

Report

Nos. 50-275/89-06

and 50-323/89-06

cc w/enclosure:

S.

H. Skidmore,

PG&E

J.

D. Townsend,

PG&E

R.

F. Locke,

PG&E

D. Taggart,

PG&E

News Services,

PG&E

T. L. Grebel,

PG&E

State of California

0

0

bcc w/enclosure:

Project Inspector

Resident

Inspector

Docket File

T. Foley,

NRR

G.

Cook

B. Faulkenberry

J. Martin

bcc w/o enclosure:

M. Smith

J. Zollicoffer

REGION

V

faCHf4

~l/~

PPNarbu

dot

KEJ

nston

MN

ndonca

Z./ S/89

Z-/

/89

Z / P/89

RZimmerman

AChaf5ee

R/8/89

</ 8/89

UE

T

C

PY

EST

C

Y

YE

/

NO

ES /

NO

'HFau

enberry

p /f/89

REQUEST

YES /

N

SEND

T

PDR

ES /

NO

EST

P

E

NO

US

PY

ES /

NO

C

P

ES

NO