Text
. A.C CELERATED
31PIMBUTJON
DEMONSTRA,T10N
SYPH'gg
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8808030193
DOC.DATE: 88/07/13
NOTARIZED:
NO
DOCKET
ACIL:50-275 Diablo Canyon Nuclear
Power Plant, Unit 1, Pacific
Ga
05000275
50-323 Diablo Canyon Nuclear
Power Plant, Unit 2, Pacific
Ga
05000323
AUTH.NAME
AUTHOR AFFILIATION
ZIMMERMAN,R.P.
Region 5, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
SHIFFER,J.D.
Pacific Gas
6 Electric Co.
SUBJECT:
Forwards
Insp Repts
50-275/88-16
& 50-323/88-15
on
880531-0603
S 0613-17.No violations or deviations
noted.
DISTRIBUTION CODE:
IEOZD
COPIES
RECEIVED:LTR Q ENCL
(
SIZE: 2 +
t
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAME
PD5
INTERNAL: ACRS
DEDRO
NRR/DLPQ/PEB 11
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NRR/PMAS/ILRB12
-
ERMANiJ
G F~
02
DSR
DEPY
ERNAL: LPDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
2
2
1
1
RECIPIENT
ID CODE/NAME
ROODPH
NRR MORISSEAUiD
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NUDOCS-ABSTRACT
OGC/HDS2
RES/DSIR
DEPY
RGN5
FILE
01
NRC PDR
COPIES
LTTR ENCL
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
j
h
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
27
ENCL
27
Docket Nos.
50"275 and 50-323
Pacific Gas
and Electric Company
77 Beale Street,
Room 1451
San Francisco,
California 94106
Attention:
Mr. J.
D. Shiffer, Vice President
Nuclear
Power Generation
Gentlemen:
Subject:
NRC INSPECTION OF DIABLO CANYON NUCLEAR POWER
PLANT (DCPP)
This letter refers to the routine inspection
by Mr.
D.
B. Pereira of this
office on May 31, through June
3,
1988,
and on June
13, through June
17,
1988
of activities authorized
by NRC License
Nos.
and to the
discussion of our findings held with Mr. J.
D.
Townsend
on June 3,
1988,
and
with Mr. J.
B. Gisclon on June
17,
1988 and other members of your staff at the
conclusion of the inspection.
Areas
examined during this inspection
are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
No deviations or violations with NRC requirements
were identified within the
scope of this inspection.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosures
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we would be pleased
to discuss
them with you.
Sincerely,
QA lya
5I
Reactor Projects
Branch
Enclosure:
Inspection
Report
Nos.
50-275/88-16
and 50-323/88-15
8808030193
8807i3
ADOCK 05000275
G
pNU
0
cc w/enclosure:
S.
M. Skidmore,
PG8E
J.
D. Townsend,
PG8E
R.
F.
Locke,
PG8 E
D. Taggart,
PG8E
R. Weinberg,
PG8E
T.
L. Grebe 1,
PG8 E
State of California
S. Silver (Report only)
bcc w/enclosure:
Project Inspector
Resident
Inspector
docket file
T. Foley,
G.
Cook,
RV
B. Faulkenberry,
RV
J. Martin,
RV
bcc w/o enclosure:
J. Zollicoffer
M, Smith
REGION V/dot
DPereira
MMendonca
6/gf/88
Q/g/88
RZimmerman
/i~I/BB
EST
COPY
3
VEST COPY ] REQUEST
C
PY
3
ES /
NO
ES /
NO
YES /
N
0 TO
3
YES /
NO