ML16341E706
| ML16341E706 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 06/17/1988 |
| From: | Zimmerman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Shiffer J PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML16341E707 | List: |
| References | |
| NUDOCS 8807010428 | |
| Download: ML16341E706 (8) | |
See also: IR 05000275/1988011
Text
+ACCELERLTED
DISTRIBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ESSXON NBR:8807010428
DOC.DATE: 88/06/17
NOTARIZED: NO
DOCKET
FACIL:50-075 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific
Ga
05000275
50;323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific
Ga
05000323
AUTH.NAME
AUTHOR AFFILIATION
ZIMMERMAN,R.P.
Region 5, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
SHIFFER,J.D.
Pacific Gas
& Electric Co.
SUBJECT:
Forwards Insp Repts 50-275/88-11
& 50-323/88-10
on
880410-0528
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
J
ENCL i
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Via%ation Response
NOTES
R
I
D
RECIPIENT
ID CODE/NAME
PD5
INTERNAL: ACRS
DEDRO
NRR/DLPQ/PEB 11
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NRR/PMAS/ILRB12
B
,J
G
02
RGN5
FXLE
01
EX ERNAL: LPDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
2
2
1
1
RECIPIENT
ID CODE/NAME
ROOD,H
NRR MORISSEAU,D
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NUDOCS-ABSTRACT
OGC 15-B-18
RES/DRPS
DEPY
NRC PDR
COPXES
LTTR ENCL
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1'
8
A
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
26
ENCL
26
JUN 17
1988
Docket Nos. 50-275
and 50-323
Pacific
Gas
and Electric Company
77 Beale Street,
Room
1451
San Francisco,
California 94106
Attention:
Mr. J.
D. Shiffer, Vice President
Nuclear
Power Generation
Gentlemen:
Subject:
NRC Inspection of Diablo Canyon Units
1 and
2
This refers to the routine inspection
conducted
by Messrs.
P.
P. Narbut,
L. M. Padovan,
and
K. E. Johnston
during the period of April 10, through
May 28,
1988.
This inspection
examined your activities
as authorized
by
NRC
License
Nos.
DPR-80 and
Additionally, the areas
of System Engineering
and Root Cause Analysis were examined
by Mr. D. F. Kirsch and Mr. J. L. Crews,
respectively.
At the conclusion of the inspection,
discussions
of our
findings were held with Mr. J.
D. Townsend,
and other members of your staff.
The report also includes
the results of two additional inspection efforts:
Mr. J.
C. Pulsipher's
examination of the Integrated
Leak Rate Test of the Unit
1 containment during the period of May 16 through 20, 1988;
and Mr. B. Collins
(of EGKG an
NRC contractor)
examination of Instrumentation
and Controls during
the periods of March 28 through April 8 and May 3 through May 19, 1988.
Their
exit interviews were held on May 19 and May 20,
1988, respectively.
Areas
examined during this inspection
are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
Based
on the results of this inspection, it appears
that certain of your
activities were not conducted
in full compliance with NRC requirements,
as set
forth in the Notice of Violation, enclosed
herewith
as Appendix A.
Your
response
to this notice is to be submitted in accordance
with the provisions
as stated
in. Appendix A, Notice of Violation.
Further, the unresolved
item discussed
in Section
13.c of the enclosed report,
concerning operability of the Auxiliary Saltwater/Component
Cooling Water
systems,
may indicate
a need for increased
management
attention in the area of
design/configuration
control.
As previously discussed
and agreed to in our
April 22,
1988 management
meeting, design/configuration
control is clearly an
important part of your Diablo Canyon operational activities.
Therefore,
we
request that you provide
a discussion of your corrective action program to
preclude further instances
of potentially unacceptable
changes
to the operating
plant configuration or parameters
due to inadequate
review or knowledge of the
< l
8807010428
SS0617
ADOCK 05000275
0
/
Y
-2-
~ auH I V
1SSS
plant systems
design
bases.
Additionally, we request that you include your
assessment
of the operability of the Auxiliary Saltwater/Component
Cooling
Water systems
in response
to the findings in the previously mentioned
unresolved
item.
In accordance
with 10 CFR 2.790 (a),
a copy of this letter and the enclosures
will be placed in the
NRC Public Document
Room.
The responses
directed
by this letter are not subject to the clearance
procedures
of the Office of Management
and Budget as required
by the Paperwork
Reduction Act of 1980,
PL 96-511.
Should you have any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
0
c(i, ingnjgn6h
Reactor Projects
Branch
Enclosures:
Appendix A, Notice of Violation
Inspection
Report Nos. 50-275/88-11
and 50-323/88-10
Enclosure I,
EGSG Idaho Report "ISC Maintenance
Evaluation of the
Diablo Canyon
Power Plant"
cc w/enclosures:
S.
D. Skidmore,
PGKE
R.
F. Locke,
PGLE
J.
D. Townsend,
PGSE (Diablo Canyon)
D. A. Taggert,
PGSE (Diablo Canyon)
,R.
S. Weinberg,
PGSE (Diablo Canyon)
T. L. Grebel,
PG&E (Diablo Canyon)
State of California
Sandra Silver (Report Only)
bcc w/enclosures:
bcc w/o report:
Project Inspector
Resident
Inspector
docket file
G.
Cook,
RV
B. Faulkenberry,
RV
J. Martin,
RV
A. Johnson,
RV
T. Foley,
J. Zollicoffer
H. Smith
-3"
REGION
/dot
LMPadovan
6/0 /88
P~V
q,e<
KEJohnslon
PPNarbut
MMMendonca
RPZimmerman
6/ lh/88
6/ 'l1/88
6/ i1/88
6/ )1/88
RE/VEST
Y
RE
UEST
COPY
YES /
0
S /
NO
RE/VEST
COPY ]
UEST
COPY
E
/
NO
ES /
NO
REQUEST
COPY
YES /
D TO
]
ES /
NO
MBlume
6/y'F88
UEST
COPY
3
E
/
NO
TO
PDR j
YES /
NO