Text
il ~
I
ACCESSION
NOR
C IL 50--275
50-323
. TH. Nhh>E"
KIRSCH D. F.
REC IP. hlAI'lE
SHIFFER, J. D.
REQULATO
'FQR) lATION DISTRIBUTION
TEl'l (R IDS)
8706080084
DOC. DATE: 87/05/12
NOTARIZED:
NO
Diablo Canyon hluclear
Pouter Plant>
Unit
1>
Paci fic Ca
Diablo Canyon Nuclear
PoiJcr Plant>
Unit 2>
Pac jfic C=
AUTHOR AFFILIATION
Regi on
5>
QFFice of Director
RECIPIENT AFFILIATION
PaciFic
Gas
Ec Electric
Co.
DOCKET
05000275
05000323
SUBJECT:
Forwards
Insp Rept 50-275/87-13
0 50-323/87-12
on
870315-0425
5 notice of violation. Concerns
noted, including
use
oF inappropriate> unprofessional
iiiording labeled
on
windom h improvenent
in mgt area.
DISTRIBUTION CODE:
IE01D
COPIEB RFCEIVED: LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAl'lE
PD5 LA
SCHIERL IhJG. H
INTERNAL:
ACRB
DEDRQ
NRA RQE,hl. L
llRR/DREP/FPB
NRR/DRIB DIR
OQC/HDB2
DEPY Gl
EXTERNAL:
LPDR
COPIES
LTTR El"CL
1
0
2
2
~ >
2
2
1
RECIPIENT
I D CODE/NAl'lE
PD5
TRkhlhlELL> C
kEOD
EN" LIEBERMAN
NRR/DOE* DIR
hiRR/DREP/RPB
8/ ILRB
RCN5
FILE
01
NRC
COPIES
LTTR El"CL
1
2
2
1
1
1
1
1
1
1
1
1
1
1
TOTAL NUNBER QF CQPIEB REQUIRED:
LTTR
26
ENCL
25
Docket Nos.
50-275
and 50-323
Pacific Gas
and Electric Company
77 Beale Street,
Room 1451
San Francisco,
California 941D6
Attention:
Mr. J.
D. Shiffer, Vice President
Nuclear
Power Generation
Gentlemen:
Subject:
NRC Inspection of Diablo Canyon Units 1 and
2
This refers to the
a routine inspection
conducted
by Messrs.
P.
P. Narbut,
L.
M. Padovan,
and
K.
E. Johnston
during the period of March 15,
1987 through
April 25,
1987.
This inspection
examined your activities
as authorized
by
NRC
License
Nos.
DPR-80 and
At the concl.usion of the inspection,
discussions
of their findings were held with Mr.
R.
C. Thornberry,
and other
members of your staff.
Areas
examined during this inspection
are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted
of selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
Based
on the results of this inspection, it appears
that several
of your
activities were not conducted
in full compliance with NRC requirements,
as set
forth in the Notice of Violation, enclosed
herewith
as Appendix A.
Your
response
to this notice is to be submitted in accordance
with the provisions
of 10 CFR 2.201
as stated in Appendix A, Notice of Violation.
Violation
C in the enclosed
notice is of serious
concern to us in that it
involves operator activities in relation to the use of inappropriate,
unprofessional
wording being labeled
on an annunciator
window.
The fact that
several
plant operators
and their supervisors
were aware of and condoned this
situation is considered significant.
The
NRC is concerned that this instance
represents
a failure of first line supervision,
or higher, to set
a proper
and
professional
tone in the conduct of control
room operations
and that the
enforcement
actions contained in this and other reports
may have resulted
from
such inattention to Control
Room responsibilities.
Violation A in the enclosed
notice raises
the issue of the effectiveness
of
your management
review functions to ensure that appropriate corrective actions
are timely instituted whenever potential safety problems
are brought to your
attention via industry or regulatory
means.
We consider your actions
concerning control of the crosstie
valve in the residual
heat
removal
system
to have
been less
than satisfactory
and urge your immediate attention to.
initiate improvement in this area of management.
8706080084
870512
ADOCK 05000275
6
A contributing factor in violation
B of the notice is miscommunications
between technicians
and the operating
crew.
The subject of miscommunications
adversely affecting the quality of work or plant operations
was previously
identified in NRC Inspection
Report 50-275/87-10.
In our cover letter dated
March 31, 1987,
PG8E was requested
to provide written" response
describing
appropriate corrective actions
regarding miscommunications.
Your reply to
this request
may be incorporated into your response
to the enclosed
Notice of
Violation.
This
same inspection report identified miscommunications
as
a contributing
factor to a Unit 2 reactor trip experienced
during unit startup.
As described
in the enclosed
Inspection Report 50-323/87-12,
the Licensee
Event Report for
the trip submitted to the
NRC did not identify miscommunication to be
a
contributing factor.
You should take the steps
necessary
to assure yourselves
that this event,
and all future events,
are adequately
assessed
and reported
to the
NRC,
and corrective actions
are taken for all contributing factors to
the event.
In accordance
with 10 CFR 2.790 (a),
a copy of this letter and the enclosures
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we are willing to
discuss
them with you.
Sincerely,
Or -.t.".('r::~
> l)v
D.
F: Kirsch, Director
Division of Reactor Safety
and Projects
Enclosures:
(1)
Appendix
(2)
Inspection
Report
Nos.
50-275/87-13
and 50-323/87-12
cc w/enclosures:
bcc w/encl osures:
S.
D. Skidmore,
PG8E
R.
F.
Locke,
PG8E
R.
C. Thornberry,
PG8E (Diablo Canyon)
D.
A. Taggert,
PG&E (Diablo Canyon)
T.
L. Grebel,
PG8E (Diablo Canyon)
R.
S. Weinberg,
PG8E (Diablo Canyon)
State of California
Sandra Silver (Report Only)
RSB/Document Control
Desk (RIDS)
Project Inspector
Resident
Inspector
G.
Cook
B. Faulkenberry
J. Martin
docket file
R.
Huey,
bcc w/enclosure
(1) only:
M. Smith
LFMB
-3-
REGION V/dog
LMPadovan<Q
KEJohnston
5/6 /87
5/8 /87
PPNarbut
5/g /87
MMMendonca
AJoh
on
5/ F /87
5/l
87
P
YES /
NO
DFKirsch
5//87
RE/VEST
Y ]
YES /
N
TO
]
YES /
NO
]
ES /
NO
U
S
ES /
NO
YES /
NO
YES /
0