Forwards Insp Repts 50-275/87-13 & 50-323/87-12 on 870315-0425 & Notice of Violation.Concerns Noted,Including Use of Inappropriate,Unprofessional Wording Labeled on Annunciator Window & Improvement in Mgt Area
ML16341E253
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/12/1987
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341E254 List:
References
NUDOCS 8706080084
Download: ML16341E253 (8)


See also: IR 05000275/1987013

Text

il ~

I

ACCESSION

NOR

C IL 50--275

50-323

. TH. Nhh>E"

KIRSCH D. F.

REC IP. hlAI'lE

SHIFFER, J. D.

REQULATO

'FQR) lATION DISTRIBUTION

TEl'l (R IDS)

8706080084

DOC. DATE: 87/05/12

NOTARIZED:

NO

Diablo Canyon hluclear

Pouter Plant>

Unit

1>

Paci fic Ca

Diablo Canyon Nuclear

PoiJcr Plant>

Unit 2>

Pac jfic C=

AUTHOR AFFILIATION

Regi on

5>

QFFice of Director

RECIPIENT AFFILIATION

PaciFic

Gas

Ec Electric

Co.

DOCKET

05000275

05000323

SUBJECT:

Forwards

Insp Rept 50-275/87-13

0 50-323/87-12

on

870315-0425

5 notice of violation. Concerns

noted, including

use

oF inappropriate> unprofessional

iiiording labeled

on

annunciator

windom h improvenent

in mgt area.

DISTRIBUTION CODE:

IE01D

COPIEB RFCEIVED: LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

ID CODE/NAl'lE

PD5 LA

SCHIERL IhJG. H

INTERNAL:

ACRB

DEDRQ

NRA RQE,hl. L

llRR/DREP/FPB

NRR/DRIB DIR

OQC/HDB2

RES

DEPY Gl

EXTERNAL:

LPDR

NSIC

COPIES

LTTR El"CL

1

0

2

2

~ >

2

2

1

RECIPIENT

I D CODE/NAl'lE

PD5

PD

TRkhlhlELL> C

kEOD

EN" LIEBERMAN

NRR/DOE* DIR

hiRR/DREP/RPB

8/ ILRB

RCN5

FILE

01

NRC

PDR

COPIES

LTTR El"CL

1

2

2

1

1

1

1

1

1

1

1

1

1

1

TOTAL NUNBER QF CQPIEB REQUIRED:

LTTR

26

ENCL

25

Docket Nos.

50-275

and 50-323

Pacific Gas

and Electric Company

77 Beale Street,

Room 1451

San Francisco,

California 941D6

Attention:

Mr. J.

D. Shiffer, Vice President

Nuclear

Power Generation

Gentlemen:

Subject:

NRC Inspection of Diablo Canyon Units 1 and

2

This refers to the

a routine inspection

conducted

by Messrs.

P.

P. Narbut,

L.

M. Padovan,

and

K.

E. Johnston

during the period of March 15,

1987 through

April 25,

1987.

This inspection

examined your activities

as authorized

by

NRC

License

Nos.

DPR-80 and

DPR-82.

At the concl.usion of the inspection,

discussions

of their findings were held with Mr.

R.

C. Thornberry,

and other

members of your staff.

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted

of selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

Based

on the results of this inspection, it appears

that several

of your

activities were not conducted

in full compliance with NRC requirements,

as set

forth in the Notice of Violation, enclosed

herewith

as Appendix A.

Your

response

to this notice is to be submitted in accordance

with the provisions

of 10 CFR 2.201

as stated in Appendix A, Notice of Violation.

Violation

C in the enclosed

notice is of serious

concern to us in that it

involves operator activities in relation to the use of inappropriate,

unprofessional

wording being labeled

on an annunciator

window.

The fact that

several

plant operators

and their supervisors

were aware of and condoned this

situation is considered significant.

The

NRC is concerned that this instance

represents

a failure of first line supervision,

or higher, to set

a proper

and

professional

tone in the conduct of control

room operations

and that the

enforcement

actions contained in this and other reports

may have resulted

from

such inattention to Control

Room responsibilities.

Violation A in the enclosed

notice raises

the issue of the effectiveness

of

your management

review functions to ensure that appropriate corrective actions

are timely instituted whenever potential safety problems

are brought to your

attention via industry or regulatory

means.

We consider your actions

concerning control of the crosstie

valve in the residual

heat

removal

system

to have

been less

than satisfactory

and urge your immediate attention to.

initiate improvement in this area of management.

8706080084

870512

PDR

ADOCK 05000275

6

PDR

A contributing factor in violation

B of the notice is miscommunications

between technicians

and the operating

crew.

The subject of miscommunications

adversely affecting the quality of work or plant operations

was previously

identified in NRC Inspection

Report 50-275/87-10.

In our cover letter dated

March 31, 1987,

PG8E was requested

to provide written" response

describing

appropriate corrective actions

regarding miscommunications.

Your reply to

this request

may be incorporated into your response

to the enclosed

Notice of

Violation.

This

same inspection report identified miscommunications

as

a contributing

factor to a Unit 2 reactor trip experienced

during unit startup.

As described

in the enclosed

Inspection Report 50-323/87-12,

the Licensee

Event Report for

the trip submitted to the

NRC did not identify miscommunication to be

a

contributing factor.

You should take the steps

necessary

to assure yourselves

that this event,

and all future events,

are adequately

assessed

and reported

to the

NRC,

and corrective actions

are taken for all contributing factors to

the event.

In accordance

with 10 CFR 2.790 (a),

a copy of this letter and the enclosures

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we are willing to

discuss

them with you.

Sincerely,

Or -.t.".('r::~

> l)v

D.

F: Kirsch, Director

Division of Reactor Safety

and Projects

Enclosures:

(1)

Appendix

A - Notice of Violation

(2)

Inspection

Report

Nos.

50-275/87-13

and 50-323/87-12

cc w/enclosures:

bcc w/encl osures:

S.

D. Skidmore,

PG8E

R.

F.

Locke,

PG8E

R.

C. Thornberry,

PG8E (Diablo Canyon)

D.

A. Taggert,

PG&E (Diablo Canyon)

T.

L. Grebel,

PG8E (Diablo Canyon)

R.

S. Weinberg,

PG8E (Diablo Canyon)

State of California

Sandra Silver (Report Only)

RSB/Document Control

Desk (RIDS)

Project Inspector

Resident

Inspector

G.

Cook

B. Faulkenberry

J. Martin

docket file

R.

Huey,

SONGS

bcc w/enclosure

(1) only:

M. Smith

LFMB

-3-

REGION V/dog

LMPadovan<Q

KEJohnston

5/6 /87

5/8 /87

PPNarbut

5/g /87

MMMendonca

AJoh

on

5/ F /87

5/l

87

P

YES /

NO

DFKirsch

5//87

RE/VEST

Y ]

YES /

N

TO

PDR

]

YES /

NO

]

ES /

NO

U

S

ES /

NO

YES /

NO

YES /

0