Text
qp,8 BEGS
P0
/7
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIABOULEVARD
SUITE 202, WALNUTCREEK PLAZA
WALNUTCREEK, CALIFORNIA94596
June
1,
1979
Docket Nos.
50-275
.IZ,
50-323
Pacific Gas
and Electric Company
77 Beale Street
San Francisco,
94106.
Attention:
Mr. Philip A. Crane, Jr.
Assistant
General
Counsel
Gentlemen:
Subject:
NRC Inspection at Diablo Canyon Units
1 and
2
This refers to the inspection
conducted
by Messrs.
D. F. Kirsch and
T.
W. Hutson of this office on April 30 - May 3,
1979 of activities
authorized
by
NRC Construction Permit Nos.
CPPR-39
and
CPPR-69,
and to
the discussion of our findings held by Mr. Kirsch with members of your
staff at the conclusion of the inspection.
Areas
examined
during this inspection
are described
in the enclosed
inspection report.
Within these
areas,
the inspection consisted of
selective
examinations of procedures
and representative
records, in-
terviews with personnel,
and observations
by the inspectors.
Based
on the results of this inspection, it appears
that certain of your
activities were not conducted
in full compliance with NRC requirements,
as set forth in the Notice of Yiolation, enclosed
herewith as Appendix A.
These
items of noncompliance
have
been categorized
into a level
as de-
scribed in our- correspondence
to all
NRC licensees
dated
December
31,
1974.
This notice is sent to you pursuant to the<provisions of Section 2.201,
of the NRC's "Rules of Practice,"
Part 2, Title 10,
Code of Federal
Regulations.
Section
2.201 requires
you to submit to this office,
within thirty (30) days of your receipt of this notice,
a
written'tatement
or explanation in reply including (1) corrective steps
which
have
been
taken
by you and the results
achieved;
(2) corrective steps
which will be taken to avoid further violations; and (3) the date
when
full compliance will be achieved.
In your reply to this letter,. and in addition to your'response
to the
specific items of noncompliance,
please
include
a discussion of what
actions you have or plan to take to separate
and/or
preclude the association
- W908l50 +~!~
(P
e
1
II
lif
Pacific Gas
and Electric Company
-2-
June
1,
1979
of non-safety related
cables with redundant safety-related
cables in
order that "no single failure results
in loss of the protection function,"
in accordance
with 10 CFR 50, Appendix A, Criterion 21.
In accordance
with Section
2.790 of the HRC's "Rules of Practice,"
Part 2, Title 10,
Code of Federal
Regulations,
a copy of this letter
and
the enclosed
inspection report will be placed, in the NRC's Public
Document
Room.
If this report contains
any information that you believe
to be proprietary, it is necessary
that you submit a written application
to this office, within 30 days of the date of this letter, requesting
that such information be withheld from public disclosure.
The application
must include
a full statement of the reasons
why it is claimed that the
information is proprietary.
The application should
be prepared
so that
any proprietary information identified is contained in an enclosure
to
the application,
since the application without the enclosure will also
be placed in the Public Document
Room. If we do not hear from you in
this regard within the specified period, the report will be placed in
the Public Document
Room.
Should you have any questions
concerning this inspection,
we will be
glad to discuss
them with you.
Sincerely,
Enclosures:
A.
B.
IE Inspection
Report
Nos.
50-275/79-12
50-323/79-07
G. S.
Sp neer,
Chief
Reactor Construction
and
Engineering Support Branch
cc w/o enclosure
B:
W. A. Raymond,
PGSE
J.
D. Worthington,
PGSE
R.
D. Ramsay,
PG8E (Avila Beach)
cc w/enclosures
R.
D. Etzler,
PG&E (Avila Beach)
J.
B. Hoch,
PGSE