ML16341A127
| ML16341A127 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 06/27/1984 |
| From: | Knighton G Office of Nuclear Reactor Regulation |
| To: | Schuyler J PACIFIC GAS & ELECTRIC CO. |
| References | |
| NUDOCS 8407230085 | |
| Download: ML16341A127 (14) | |
Text
Docket No.:
50-275 JUN,-2 7 t984 Mr. James
- 0. Schuyler, Vice President Nuclear Power Generation c/o Nuclear Power Generation, Licensing Pacific Gas and Electric Company 77 Beale Street, Room 1435 San Francisco, California 94106
Dear Hr. Schuyler:
Subject:
Diablo Canyon, Unit 1 Full Power Technical Specifications Enclosed are a set of draft page
- changes, enclosure (1), which'ou requested for the Diablo Canyon, Unit 1 Full Power Technical Specifications.
These changes respond to your requests for amendments shown in enclosure (2).'nclosure (3) identifies the various sections of the Technical Specifications that have been revised.
In addition to the requested
- changes, the staff also revised certain sections of the Technical Specifications.
These are items 19 through 24 of enclosure (3).
These latter changes were made to either correct an error, provide consistency with the Diablo Canyon Final Safety Analysis Report, or provide further clarification.
We request that your comments on and concurrence of the revised pages.
Early response is requested to assure conpletion of the Full Power Technical Speci-fications consistent with the full power licensing schedule.
Enclosure:
As stated cc:
See next page DL:
PB DL.
BBuckley/ch rtas Gl hton 6/g,$/84 6/84 6~/84
'407230085 840627 PDR ADOCK 05000275 PDR George W. Knighton, Chief Licensing Branch No.
3 Division of Licensing DISTRIBUTION FDocket Fi-1-e-50-27-5~
NRC PDR Local PDR PRC System NSIC LB¹3 Reading JLee BBuckley OELD, Attorney ACRS (16)
EJordan NGrace
V 4
r I
p l
I C
]I 0
I N
I I
<<5 i 1I U
y f'
N 7
t I 'I t
i gag RECII
~o Cy J
0O pN
+**++
UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555 III' 0 i s
Docket No.:
50-275 Mr. James
- 0. Schuyler, Vice President Nuclear Power Generation c/o Nuclear Power Generation; Licensing Pacific Gas and Electric Company 77 Beale Street, Room 1435 San Francisco, California 94106
Dear Nr. Schuyler:
Subject:
Diablo Canyon, Unit 1 Full Power Technical Specifications Enclosed are a set of draft page changes, enclosure (1), which you requested for the Diablo Canyon, Unit 1 Full Power Technical Specifications.
These changes respond to your requests for amendments shown in enclosure (2).
Enclosure (3) identifies the various sections of the Technical Specifications that have been revised.
In addition to the requested
- changes, the staff also revised certain sections of the Technical Specifications.
These are items 19 through 24 of enclosure (3).
These latter changes were made to either correct an error, provide consistency with the Diablo Canyon Final Safety Analysis Report, or provide further clarification.
We request that your comments on and concurrence of the revised pages.
Early response is requested to assure conpletion of the Full Power Technical Speci-fications consistent with the full power licensing schedule.
Enclosure:
As stated eorge W
nighton hief Licensing Branch o.
3 Division of Licensing cc:
See next page
0
'l
cc w/o Encl.:
Mr. J. 0. Schuyler, Vice President Nuclear Powe~ Generation c/o Nuclear Power Generation, Licensing Pacific Gas and Electric Company 77 Bea'1e Street, Room 1435'an Francisco, California 94106 Philip A. Crane, Jr.,
Esq.
Pacific Gas
& Electric Company Post Office Box 7442 San Francisco, California 94120 Mr. Malcolm H. Furbush Vice President
- General Counsel Pacific Gas
& Electric Company Post Office Box 7442 San Francisco, California 94120 Janice E. Kerr, Esq.
California Public Utilities Commission 350 McAllister Street San Francisco, California 94102 Mr. Frederick Eissler, President Sceni c Shorel ine Preservation Conference, Inc.
4623 More Mes'a Drive Santa Barbara, California 93105 Ms. Elizabeth Apfelberg 1415 Cozadero San Luis Obispo, California 93401'r.
Gordon A. Silver Ms. Sandra A. Silver 1760 Alisal Street San Luis Obispo, California 93401 Harry M. Willis, Esq.
Seymour
& Willis 601 California Street, Suite 2100 San Francisco, California 94108.
Mr. Richard Hubbard MHB Technical Associates Suite K
1725 Hamilton Avenue San Jose, California 96125
. Mr. John Marrs, Managing Editor San Luis.Obis o Count Tele ram Tribune 13 1 Johnson Avenue P. 0.
Box 112
'San Luis Obispo, California 93406 Diablo Canyon Resident Inspector/Diablo Canyon NPS c/o US Nuclear Regulatory Commission P. 0.
Box 369 Avila Beach, California 93424 Ms.
Raye Fleming 1920 Mattie Road Shell Beach, California 93440 Joel
- Reynolds, Esa.
John R. Phillips, Esq.
Center for Law in the Public Interest 10951 West Pico Boulevard Third Fl oor Los Angeles, California 90064 Paul C. Valentine, Esq.
321 Lytton Avenue Palo Alto, California 90064 Dr. William E.
Cooper Project Manager. - 5511 Teledyne Engineering Services 130 Second Avenue Waltham, Massachusetts 02254 Mr. Dick Blankenburg Editor
& Co-Publisher South County Publishing Company P. 0.
Box 460 Arroyo Grande, California 93420 Bruce Norton, Esq.
Norton, Burke, Berry
& French, P.C.
202 E. Osborn Road P.. 0. Box 10569
- Phoenix, Arizona 85064 Mr.
W. C. Gangloff Westinghouse Electric Corporation P.
O.
Box 355 Pittsburgh, Pennsylvania 15230 David F. Fleischaker, Esq.
P. 0.
Box 1178 Oklahoma City, Oklahoma 73101
Arthur C. Gehr, Esq.
Snell 5 Wilmer 3100 Valley Center Phoenix, Arizona 85073 Hr. Lee M. Gustafson, Director Federal Agency Relations Pacific Gas 8 Electric Company 1050 1?th Street, N.W.
Suite 1180 Washington, DC 20036 Regional Administrator - Region V
US Nuclear Regulatory Comnission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Dr. Jose Roesset 3506 Duval Road Austin, Texas 78759 Michael J. Strumwasser, Esq.
Special Council to the Attorney General State of California 3580 Hilshire Boulevard, Suite 800 Los Angeles, California 90010 Hr. Tom Harris Sacremanto Bee 21st and 0 Streets Sacramento, California 95814 Mr. H. Daniel Nix Cal ifornia Energy Commission 1516 9th Street, MS 18 Sacramento, Cal ifornia 95814 Maurice Axelrad, Esq.
Lowenstein,
- Newman, Reis and Axelrad 1025 Connecticut
- Avenue, NW Washington, DC 20036 Lewis Shollenberger, Esa.
US Nuclear Regulatory Comnission Region Y
'1450 Maria Lane Suite 210 Walnut Creek, California 94596 Hr. Thomas Devine Government Accountabi 1 ity Project Institute for Policy Studies 1901 gue Street, NW Washington, DC 20009
Enclosure (2)
Request Date 5/10/82 12/17/82 6/8/84 1/11/83 6/6/84 1/11/83 6/6/84 1/11/83 1/11/84 6/6/84 2/10/83 8/16/83 8/18/83 11/4/83 jj/10/83 12/14/83 2/29/84 2/29/84 3/21/84 3/30/84 3/30/84 4/5/84 3/30/84 3/30/84 6/6/84 6/6/84 6/8/84 License Amendment No.
82-02 82-08 83-01 83-01 83-01 8i 84-01 83-09 83-10 83-11 84-02 84-03 84-07 84-08 84-06 84-06 Subiect Fire Protection Instrumentation Frequency of emergency and security plans and implementing procedures
'imits on working hours Prompt notification of failure of PORYs or Safety Yalves Administrative controls Boron dilution test Flood protection (Breakwater)
Snubbers Reactor vessel head vent Pressurizer code safety valves Testing of HEPA filters and charcoal adsorbers.
Diesel generator testing Containment ventilation system Accident monitoring instrumen-tation Combustible gas control monitors Containment fan coolers Reactor trip system instrumen-tation moderator temperature co-efficient
C 1
Enclosure (3)
Subiect 1.
Fire protection instrumentation 2.
Limits on working hours 3.
Prompt notification of failure of PORYs or safety valves 4.
Administrative controls 5.
Boron dilution test 6.
Flood protection (Breakwater) 7.
Snubbers 8.
Reactor vessel head vents 9.
Pressurizer code safety valves
- 10. Testing of HEPA filters and charcoal adsorbers
- 11. Diesel generator testing
- 12. Containment ventilation system
- 13. Accident monitoring instrumentation
- 14. Combustible gas control monitors
- 15. Containment fan coolers
'16. Reactor trip system instrumentation
- 17. Moderator temperature coefficient
- 18. Frequency of emergency and security plans and implementing procedures
- 19. gvertemperature T
- 20. Reactor coolant system ttODE 3 operation 21.
D. C. Sources Technical S ecification Table 3.3-11 Spec. 6.2.2.f Spec. 6.9.1.12t Spec. 6.2.2, 6.2.3.4, 6.3.1, 6.5.1.2, 6.5.2.2, 6.5.2.9, 6.5.2.10, 6.8.3, Table 6.2-'1, Figures 6.2-1 and 6.2-2.
Spec. 3/4.7.1.3, 3/4.4.1.2, 3/4.10.4 Spec. 3/4.7.7.13 and BASES Spec. 3/4.7.7. 1 and BASES, Spec.6.10.2m Spec.
3/4.4.11 and BASES Spec. 3/4.4.2.2 Spec. 3/4.7.5.1, 3/4.7.6.1, 3/4.9.12, and BASES Spec. 3/4.8.1.1 Spec. 3/4.6.1.7 and BASES Spec. 3/4.3.3.6 and Tables 3.3-10 and 4.3-7.
Spec. 3/4.6.4.1 Spec. 3/4.6.2.3 Table 4.3-1 Spec. 3/4.1.1.3 Spec.
6.5.2.8 Table 4.3-1 Spec. 3/4.4. 1.2 and BASES Spec. 3/4.8.3.1, 3/4.8.3.2
v Sub 'ect Technical S ecification
- 22. Containment free volume 23.
NRC organizational changes Spec.
5.2.1.h Spec.
6.9.1.10, 6.9.1.12, 6.9.1.13, 6.9.1.14 and 6.9.2
- 24. High radiation area Spec.
6.12
V