OCT'1 7 1983 Docket No.:
50-275 Mr. James
- 0. Schuyler Vice President - Nuclear Power Generation Pacific Gas 8 Electric Company 77 Beale Street San Francisco, California 94106
Dear Mr. Schuyler:
DI ST RIB ':
lDocument Control 50..2752 NRC PDR L PDR NSIC PRC System LB83 Reading JLee HSchierling JWilson BBuckley GWKnighton Attorney,. OELD ACRS (16)
- Jordan, IE
- Taylor, IE TiiNovak DGEisenhut CThomas
Subject:
Systems and Technical Specifications Required for Fuel Load and Low Temperature Testing By letters dated August 24 and September 8, 1982, the Pacific Gas and Electric Company identified the systems and equipment which you consider to be required and qualified prior to fuel loading and low temperature testing at your Diablo Canyon Nuclear Power Plant, Unit l.
Additional equipment required by the technical specifications for fuel loading was identified in a letter dated December 3, 1982.
We have reviewed those systems and portions of systems that were identified as required for initial fuel loading and low temperature testing in the above cited letters.
We have not identified any additional piping, instrumentation, electrical systems or physical equipment required to be qualified prior to initial fuel loading or low temperature testing for Diablo Canyon, Unit 1.
In addition to qualifying the identified systems or portions of systems, you should carefully review your Technical Specifications to determine those requirements that must be met during initial fuel loading and low temperature testing.
All Technical Specification requirements applicable for operation in MODE 5 and in MODE 6 will be in effect during initial fuel loading and low temperature testing.
We have performed a limited review of your Technical Specifications and have identified that, as a minimum, the following sections of the specifications are applicable in MODE 5 or 6.
You should ensure that all Technial Specification requirements will be met during the planned operations of Diablo Canyon, Unit 1.
1.
Safety Limit on RCS pressure and appropriate setpoints for Reactor Trip System instrumentation.
2.
All Applicability Conditions for LCO's and SR's.
BSXZOtoma..83Soi7 PDR ADQCK 05000275 P
I t
t E g E
rt I
I f
It I
3.
For Reactivity Control Systems - shutdown margin, Boration System flow path, charging pump, borated water source and Position Indication Systems applicable in MODE 5.
4.
For Reactor Trip Systems - source
- range, manual trip, trip breakers and automatic trip logic applicable in MODE 5.
5.
For Radiation Monitors - fuel storage, control room and containment areas applicable in MODE 5 or 6.
6.
For other Instrumentation - include seismic, meteorological, chlorine, fire detectors, and radioactive effluent detectors applicable in NODE 5 or 6.
7.
For Reactor Coolant Systems - RHR, safety valves, chemistry, specific activity, pressure/temperature limits, pressurizer, Overpressure Protection System and structural integrity applicable in NODE 5 or 6.
8.
For Plant Systems -
SG pressure/temperature limits, control room ventilation, snubbers, sealed sources, fire suppression, spray/
sprinklers, CO
, Halon, fire hose, fire barrier penetrations, and area temperatures applicable in MODE 5 or 6.
9.
For Electrical Power Systems - A.C. source, onsite power, and D. C.
sources required in MODE 5 or 6.
10.
For Refueling Operation - all requirements are applicable in MODE 6.
ll.
for Special Test Exception - Position Indication System applicable in MODE 5.
12.
For Radioactive Effluents - all requirements are applicable in MODES 5 and 6.
13.
14.
For Radiological Environmental Noinitoring - all requirements are applicable in NODES 5 and 6.
All design features and adminstrative controls are applicable in MODES 5 and 6.
P ll ~
I Hh h)
H If you have additional questions on the applicability of your Technical Specifications to operation in MODE 5 or 6, please contact Hans Schierling on (301)492-7100.
Sincerely m
cc:
See next page Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation DL:Los
~'f~
JWilson yt thomas 10/ jl /83 10f'1 /83 g~~ c<
DL 3
P D/L DL:
GW ghton Novak 10/f I /83 10/// /83 10/(
83
0 t
N C
q
Diablo Canyon Mr. J. '0. Schuyler, Vice President Nuclear Power Generation.-.
c/o Nuclear Power Generation, Licensing Pacific Gas and Electric Company 77 Beale Street, Room 1435 San Fi ancisco, California 94106 Philip A. Crane, Jr.,
Esq.
Pacific Gas 8 Electric Company Post Office Box 7442 San Francisco, California 94120 Mr. Malcolm H. Furbush Vice President - General Counsel Pacific Gas 8 Electric Company Post Office Box 7442 San Francisco, California 94120 Janice E. Kerr, Esq.
California Public Utilities Commission 350 McAllister Street San Francisco, California 94102 Mr. Frederick Eissler, President Scenic Shoreline Preservation Conference, Inc.
4623 More Mesa Drive Santa Barbara, California 93105 Ms. Elizabeth Apfelberg 1415 Cozadero San Luis Obispo, CA 93401 Mr. Gordon A. Silver Ms. Sandra A. Silver 1760 Alisal Street San Luis Obispo, CA 93401 Harry M. Willis, Esq.
Seymour 8 Willis 601 California Street, Suite 2100 San Francisco, CA 94108 Mr. Richard Hubbard MHB Technical Associates Suite K
1725 Hamilton Avenue San Jose, CA 96125 Mr. John Marrs, Managing Editor San Luis Obispo County Telegram Tribune 1321 Johnson Avenue P. 0.
Box 112 San Luis Obispo, CA 93406 Resident Inspector/Diablo Canyon NPS c/o US Nuclear Regulatory Commission P. 0.
Box 369 Avila Beach, California 93424 Ms.
Raye Fleming 1920 Mattie Road Shell Beach, California 93440 Joel
- Reynolds, Esq.
John R. Phillips, Esq.
Center for Law in the Public Interest 10951 West Pico Boulevard Third Floor Los Angeles, California 90064 Paul C. Valentine, Esq."
321 Lytton Avenue Palo Alto, California 94302
'Dr. William E. Cooper Project Manager - 5511 Teledyne Engineering Services 130 Second Avenue Waltham, Massachusetts 02254 Mr. Dick Blankenburg Editor 8 Co-Pu" lisher South County Publishing Company P. 0.
Box 460 Arroyo Grande, California 93420 Norton, Burke, Berry 8 French, P.C.
2002 E.
Osborn Rnad P. 0.
Box 10569 Phoenix, Aiizo:ia 05064 Mr.
W.
C. Gangloff Westinghouse Electric Corporation P. 0.
Box 355 Pittsburg, Pennsylvania 15230 David F. Fleischaker, Esq.
P.
0.
Box 1178 Oklahoma City, Oklahoma 73101
4
~
V4
% MtlMP
Diablo Canyon Arthur C. Gehr, Esq.
Snell 8 Wilmer 3100 Valley Center Phoenix, Arizona 85073 Mr. Lee M: Gustafson, Director Federal. Agency Pe>ation<.
Pacific Gas 8 Electric Company 1050 17th Street, N.
W.
Suite 1180 Washington, D.
C.
20036 Regional Administrator - Region V
US Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Dr. Jose Roesset 3506 Duval Road Austin, Texas 78759 Michael J. Strumwasser, Esq.
Special Council to the Attorney General State of California 3580 Wilshire Boulevard, Suite 800 Los Angeles 90010 Mr. Thomas H. Harris San Jose Mercury News 750 Ridder Park Drive San Jose, California 95190 Mr. Mark Gottlieb California Energy Commission
-1111 Howe Avenue, MS 27 Sacramento, California 95825 Maurice Axelrad, Esq.
Lowenstein,
- Newman, Reis and Axelrad 1025 Connecticut
- Avenuh, NW Washington, D.
C.
20036
r